HomeMy WebLinkAboutFour Seasons KL&A-03 Vail Four Seasons: Third submittal review
KL&A, Inc.
DRAWINGS DATED 7/18/07-CONSTRUCTION SET
Structural Comments:
Note: structural comments are numbered S1,S2, and are also given a designation with regards to the topic,
as follows: DC=design criteria; F=foundations; D=drawings; C=structural calculations; GS =gravity
system; LS=lateral system.
General Structural Comment:This review and eventual approval does not permit the violations of any
section of the building code, or any other ordinance or State law.
CLOSED COMMENTS HAVE BEEN REMOVED FROM THE LIST
S 106 F 9,11,14/S6.O lE Sheet 52.03.2: 12 ft. cantilever retaining wall extension of
eXteriar two span wall below, outside of ballroom areaway
on line A11 between 14 and 14.5 has not been checked and
appears to be overstressed for flexure, please check. Consider
moment resisting joints at slab to wall connections. Design/detail
planter wall. These details require rebar and splices to be shown
for proper detailing and construction. Verify cantilever deflection.
KL&A 6/26/07: Please respond to this issue.
KL&A 8/31/07: Subinitted ccrlculations show restraint czt top of�
planter wall, while per drezwings, the wall is cantilevered. It
appears wall type `WS' is requiNed at retaining walls south of the
ballroom crrea, please v�eview.
Sll 0 F 52.02.4 No calculations have been provided far the cantilevered retaining
wall around the pool structure, or on gridline DL Verify lateral
load capacity, consider pedestrian surcharge and water surcharge
due to site drains behind this wall as appropriate. Verify footing
width.
KL&A 6/26/07.• Wall in question between gridlines 6-8.S south of
A 18 supports roof loads and also is the lateral load path for pool
structure loading, and for roof uplift for partially enclosed
structures. Wall also is monolithic with Area 3A perimeter building
wall. Design is part ofEOR's scope,please provide wall designs
accounting for support of roof structure.
KL&A 8/31/07.• Coordinate new�etaining wall detail 21/S4.03
with foundations shown on plan, S2.02.4. i�erify new steel roof
around pool structure will resist lateral soil reaction of 1.0 klf,
verify metal deck shear stNength and connection to resisting
perpendicular retaining walls.
5128 GS 52.09.3 Top slab bars lOT3 & lOT6 are shown at line 10.6/A14. It seems
these bars are shown in error as the concrete beam is upturned at
this location. Beams south of line Al2.2 are not identified. Please
check. IBC 1603.1.
KL&A 6/26/07: Top bars also appear required at gridline A 10.
S2.09.3 PT profile is incomplete, details are required.
KL&A 8/31/07: Top bars are still not shown on plan, please
review.
S 145 LS 1/53.02C Wall thickness is shown as 8 inches. Plan 5201.2 indicates a 12"
exterior foundation wall, please coordinate.
KL&A 6/26/07.• Coordinate reinforcing shown on shear wall
elevation with `W2'or `W3'per 52.01.2, it is unclear which wall
type controls for soil lateral loading. Wall must span two way due
to stair shaft opening, verify designs.
KL&A 8/31/07: Submitted calculations show restraint at top of�
planter wall, while pe�^drawings, the wall is cantilevered. It
appears wall type `WS' is required at retaining walls south of�the
ballroom area,please review.
S 164 LS 52.11 Provide detail of roof diaphragm to concrete cores. Provide or
indicate detail of steel beams to concrete cores for gravity plus
lateral loading,per ASCE 7-02 load combinations. Verify drag
loads and chord force detailing at eave framing. Verify diaphragm
welding is sufficient for expected shear forces, provide shear and
moment diagram at roof deck levels. ASCE 7-02: 9.5.2.6.2.2,
9.5.2.6.2.6, 9.5.2.62.7.
KL&A 6/26/07.• New detail 13/S1.O.SB:Welded studs, thickness and
diinensions of einbed plate are not defined. Please provide this
information for all beams and reaction conditions on the drawings.
Verify connection is adequate with short slot or long slot holes in
the shear tab, if permitted for erection. Provide roof diaphragm
calculations per original comment. IBC 1911, 1912, 2205.1.
KL&A 8/31/07.• Submitted materials ar°e incomplete, review of this
item is ongoing.
S 165 LS 5211 Provide detail of concrete diaphragm to concrete cores, verify
shear transfer at each level and comment whether any drags are
required. Verify if typical details 12 &23/51.0.3A apply
throughout the job. ASCE 7-02: 9.5.2.62.2, 9.5.2.6.2.6,
9.5.2.6.2.7, 9.5.2.6.2.8.
KL&A 6/26/07: Please respond to this issue.
KL&A 8/31/07: Subinitted materials are incornplete, review of this
item is ongoi�rg.
5169 LS 53.02A Calculations show a significant farce reversal /back-stay effect
from Leve16 to Level 5 shear force, i.e. SW 14 & SW 16. Verify
this load path has been designed for the loads per 3D analysis.
Verify soil plus wind/ seismic loading has been used for drag
design. Note per plan, 52.05.1, a large hole exists adjacent to wall
SW16, and per calculations page 536, (38+57)=95k shear transfer
is required. No drags are shown on plan. Please verify. Note,
elevations 53.02A show#5 @ 14" o.c. at upper levels, calculations
shown (2) #5 @ 24" o.c., please verify designs match calculations.
IBC 1616.L1, IBC 1604.4.
KL&A 6/26/07: O�iginal comment calculated (38+57)=95k load
for SW14 not SW16 as noted, however collector bars have not been
added for SW14. SW16 collector load is (86+143)=229k, (4) #7
shown on plan are not adequate for 229k,please review all
collector designs.
KL&A 8/31/07: Submitted materials are incornplete, review of this
itena is oi�going.
5171 52.11.1-2, etc. Roof framing plans are incomplete. Please address the following
and confirm detailing will be provided in future drawings issues,
per IBC 1604.2, 2205.1.
a) KL&A 8/31/07.• Closed
b) KL&A 8/31/07: Closed
c)KL&A 8/31/07: Closed
d) KL&A 8/31/07: Closed
e)KL&A 8/31/07.• Closed
� KL&A 8/31/07: Closed
g) W8 & W16 eave supports do not cantilever outwards and
support eave in RAM analysis submitted, instead all load is
transferred directly to columns via eave rim beam. Verify eave
supports and perimeter girders are adequately sized
KL&A 8/31/07: Su�mitted materials c�re incomplete, review of this
itern is otzgoing.
h) 52.09.3, etc: HSS6x6 to W8, W14 moment connection at eave
needs a detail
KL&A 8/31/07: Submitted y�iaterials cd1°e incornplete, review of this
itern is ongoing.
i) 1/52.10.3: W 16x31 on line A 10.5 is shown as W 18x35 per
calculations,please verify all beams match calculations. IBC
2205.1.
KL&A 8/31/07.• Submitted mater�ials are incomplete, review of this
ite�n is ongoing.
S 172 1/52.08.3 W 18x46 eave support girder near gridlines CB-C 1 is shown as
W21x44 per calculations; W14x30 on line BE is shown as
W21X48 per calculations. Several cantilevered eave moment
connection supports are shown without a backspan member. Please
review. IBC 2205.1.
KL&A 8/31/07.• Submitted nzaterials are incornplete, review of this
item is ongoing.
5173 1/52.08.3 Verify lateral support of the low roof structure for wind and
seismic loading; low roof section is not connected to Level 8 PT
slab beyond or core walls within the roof area, and braced frames
are not shown. Similar at 2/52.08.3 and other low roof structures.
IBC 1604.4.
KL&A 8/31/07.• Submitted materials are incomplete, review of this
ite�n is ongoing.
5173 11,26,28/S7.OlA Calculations indicate that roof deck is attached to slab edge
along line 2 and other locations where deck and floor slab are near
the same elevation. Provide a detail for lateral roof to slab
connection where required by lateral analysis. IBC 1604.4.
KL&A 8/31/07: Su�mitted mate�-ials c�re incomplete, review of this
item is ongoing.
5174 52.11.1, etc Show roof diaphragm to concrete core connection, consider in-
plane collector shear forces and out of plane anchorage forces. IBC
1604.8.2; ASCE 7, 9.5.2.6.2.6, 9.5.2.6.2.8.
KL&A 8/31/07: Submitted mate�ials ur�e incomplete, Yeview of this
item is ongoing.
5175 52.11.1 Verify diaphragm continuity at dormers line AS between upper
roof deck and lower roof deck,provide collectors as required for in
plane shear and out of plane shear. IBC 1604.4.
KL&A 8/31/07: Submitted materials are incornplete, �eview of this
item is ongoing.
S 176 52.09.2 Roof ridge support columns near15.5-A4.8 shown on 52.11.2 are
not supported by slab below, please check. IBC 1604.4.
KL&A 8/31/07: Column in c�uestioyz is 20 feet tall, ve�-ify HSSSxS is
adequate, per S211.2.
5178 A2.11.1R, etc. Structural roof plans do not incorporate snow fences shown on
architectural drawings. Please provide snow fence with adequate
structural connection shear and moment associated with sliding
snow. IBC 1608.
KL&A 8/31/07.• Submitted materials are incornplete, review of this
item is ongoing.
KL&A 8/31/07: COMMENTS ON NEW DETAILS FOLLOW
S 187 21/54.03 Minimum depth shall be 48" for frost depth requirement. IBC
1805.2.1. Verify wall vertical rebar is adequately developed at top
of footing, ACI 318, 12.2. Appears that variables D and D' are
reversed with calculations variables hf and hp, please review. IBC
1806.
5188 55.03 Revised beams 4B8 & 4B9 appear too shallow to support one way
slab at ramp. Shear ties are spaced greater than d/2. Please review
beam sizes for ramp loads. IBC 1604.2.