HomeMy WebLinkAboutFour Seasons emails 070408 Carolyn Godfrey
From: John King <JKing@safebuilt.com> on behalf of John King
Sent: Monday, July 07, 2008 10:59 AM
To: Martin Haeberle; Mike McGee
Cc: David Rhoades;JR Mondragon;JR Rulapaugh; Leonard Sandoval; Mark Miller; Mike
Vaughan; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
Mike and Martin, I will make myself available at whatever time works for you. I'm 20 minutes away.
Martin, this is a perfect example of why I asked you about the permitting of temp uses the other day. Although Charlie
told Layton in was not required, perhaps we should revisit the issue.
Thanks
-----Original Message-----
From: Mike McGee [mailto:MMcGee@vailgov.com]
Sent: Monday, July 07, 2008 10:53 AM
To: John King; Martin Haeberle
Cc: David Rhoades; JR Mondragon; )R Rulapaugh; Leonard Sandoval; Mike McGee; Mark Miller; Mike Vaughan; Tom
Kassmel
Subject: RE: four seasons 7 4 08.PDF - Adobe Acrobat Standard
To AII,
I had a discussion with Chief Miller this morning ref the Four Seasons.
I would like to request a walk-through with Martin and perhaps John King to see first hand, the conditions as they exists
now.
The IFC requires temp standpipes, an operational plan, and an exiting plan. Normal workplace standards would require
adequate lighting. and ventilation.
The Fire Dept's biggest concern is we not have a clear and consistent means of access or egress. Layton continues to
frame and pour faster than they can draft updated plans.
We have no means to fight a fire in the lower levels, despite the presence of flexible natural gas lines strung across screw
jacks with bailing wire, active temp electrical services, storage rooms and cages with a variety of materials, and the
offices in the basement.
Rescue of construction workers will be a challenge due to what seems to be an ever changing exit path, most of which
are not marked. Stairs that were there last week are gone now. New stairs are there but not labeled.
Escape routes were to be marked in red lines on the floor. What lines exists are often covered with materials, fade to
nothing, stop mid way, or are not there at all.
Layton has an excuse for each element.
This weekends incident just tends to reinforce my observation that they will do whatever they think they can get away
with.
When they get caught, they apologize and repeat the same mistake. Makes me think their "mistakes" are not accidents.
I am open today and Tues.
i
I will be out of the state for two weeks starting Thurs AM.
I am trying to hold Wed afternoon open for last minute clean up.
If there is some time you can spend to do a walk through thoday or Tues,
Please let me know.
Thanks,
Mike
»> John King <]King@safebuilt.com> 07/07/2008 10:18 AM »>
Martin, per discussions with Mike, we have only been performing inspections on the upper level of the four seasons
project since the Red Tag was issued.
Please let me know if there is anything I can do to help.
Thanks, John
-----Original Message-----
From: Martin Haeberle [mailto:MHaeberleCalvailgov.com]
Sent: Monday, July 07, 2008 10:15 AM
To: John King
Cc: Leonard Sandoval; Mike McGee; Mark Miller; Tom Kassmel
Subject: Re: four seasons 7 4 08.PDF - Adobe Acrobat Standard
John,
Please give me an update on the status of inspections for this project so that I can adequately support and address Mikes
concerns
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (f)
970.376.3672 (c)
z
Carolyn Godfrey
From: Mike McGee
Sent: Monday, July 07, 2008 10:53 AM
To: John King; Martin Haeberle
Cc: Fire_Inspectors; Leonard Sandoval; Mark Miller; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
To AII,
I had a discussion with Chief Miller this morning ref the Four Seasons.
I would like to request a walk-through with Martin and perhaps John King to see first hand, the conditions as they exists
now.
The IFC requires temp standpipes, an operational plan, and an exiting plan. Normal workplace standards would require
adequate lighting. and ventilation.
The Fire Dept's biggest concern is we not have a clear and consistent means of access or egress. Layton continues to
frame and pour faster than they can draft updated plans.
We have no means to fight a fire in the lower levels, despite the presence of flexible natural gas lines strung across screw
jacks with bailing wire, active temp electrical services, storage rooms and cages with a variety of materials, and the
offices in the basement.
Rescue of construction workers will be a challenge due to what seems to be an ever changing exit path, most of which
are not marked. Stairs that were there last week are gone now. New stairs are there but not labeled.
Escape routes were to be marked in red lines on the floor. What lines exists are often covered with materials, fade to
nothing, stop mid way, or are not there at all.
Layton has an excuse for each element.
This weekends incident just tends to reinforce my observation that they will do whatever they think they can get away
with.
When they get caught, they apologize and repeat the same mistake. Makes me think their "mistakes" are not accidents.
I am open today and Tues.
I will be out of the state for two weeks starting Thurs AM.
I am trying to hold Wed afternoon open for last minute clean up.
If there is some time you can spend to do a walk through thoday or Tues,
Please let me know.
Thanks,
Mike
»> John King <]King@safebuilt.com> 07/07/2008 10:18 AM »>
Martin, per discussions with Mike, we have only been performing inspections on the upper level of the four seasons
project since the Red Tag was issued.
i
Please let me know if there is anything I can do to help.
Thanks, John
-----Original Message-----
From: Martin Haeberle [mailto:MHaeberle@vailgov.com]
Sent: Monday, July 07, 2008 10:15 AM
To: John King
Cc: Leonard Sandoval; Mike McGee; Mark Miller; Tom Kassmel
Subject: Re: four seasons 7 4 08.PDF - Adobe Acrobat Standard
]ohn,
Please give me an update on the status of inspections for this project so that I can adequately support and address Mikes
concerns
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (�
970.376.3672 (c)
z
Carolyn Godfrey
From: John King <JKing@safebuilt.com> on behalf of John King
Sent: Monday, July 07, 2008 10:18 AM
To: Martin Haeberle
Cc: Leonard Sandoval; Mike McGee; Mark Miller;Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
Martin, per discussions with Mike, we have only been performing inspections on the upper level of the four seasons
project since the Red Tag was issued.
Please let me know if there is anything I can do to help.
Thanks, John
-----Original Message-----
From: Martin Haeberle [mailto:MHaeberle@vailgov.com]
Sent: Monday, July 07, 2008 10:15 AM
To: John King
Cc: Leonard Sandoval; Mike McGee; Mark Miller; Tom Kassmel
Subject: Re: four seasons 7 4 08.PDF - Adobe Acrobat Standard
John,
Please give me an update on the status of inspections for this project so that I can adequately support and address Mikes
concerns
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (�
970.376.3672 (c)
i
Carolyn Godfrey
From: Martin Haeberle
Sent: Monday, July 07, 2008 10:15 AM
To: John King
Cc: Leonard Sandoval; Mike McGee; Mark Miller;Tom Kassmel
Subject: Re:four seasons 7 4 08.PDF - Adobe Acrobat Standard
]ohn,
Please give me an update on the status of inspections for this project so that I can adequately support and address Mikes
concerns
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (�
970.376.3672 (c)
i
Carolyn Godfrey
From: Mike McGee
Sent: Monday, July 07, 2008 1:09 PM
To: John King; Mark Gunther; Martin Haeberle
Cc: David Rhoades;JR Mondragon;JR Rulapaugh; Leonard Sandoval; Mark Miller; Mike
Vaughan; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
Thanks!
»> John King <JKing@safebuilt.com> 07/07/2008 1:01 PM »>
Mark and I will meet you both at the fire station at 9:30.
-----Original Message-----
From: Mike McGee [mailto:MMcGeeCa�vailgov.com]
Sent: Monday, July 07, 2008 12:56 PM
To: John King; Mark Gunther; Martin Haeberle
Cc: David Rhoades; JR Mondragon; ]R Rulapaugh; Leonard Sandoval; Mike McGee; Mark Miller; Mike Vaughan; Tom
Kassmel
Subject: RE: four seasons 7 4 08.PDF - Adobe Acrobat Standard
I can do that.
I have a 10:30 here at Station 2.
Thanks,
Mike
»> Martin Haeberle 07/07/2008 12:54 PM »>
Mike,
How about tomorrow morning at 9:30.
John,
I would like to have Mark their, if possible, in that he is the most familiar.
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (f�
970.376.3672 (c)
i
Carolyn Godfrey
From: John King <JKing@safebuilt.com> on behalf of John King
Sent: Monday, July 07, 2008 1:01 PM
To: Martin Haeberle; Mike McGee; Mark Gunther
Cc: David Rhoades;JR Mondragon;JR Rulapaugh; Leonard Sandoval; Mark Miller; Mike
Vaughan; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
Mark and I will meet you both at the fire station at 9:30.
-----Original Message-----
From: Mike McGee [mailto:MMcGeeC�vailgov.com]
Sent: Monday, July 07, 2008 12:56 PM
To: John King; Mark Gunther; Martin Haeberle
Cc: David Rhoades; ]R Mondragon; )R Rulapaugh; Leonard Sandoval; Mike McGee; Mark Miller; Mike Vaughan; Tom
Kassmel
Subject: RE: four seasons 7 4 08.PDF - Adobe Acrobat Standard
I can do that.
I have a 10:30 here at Station 2.
Thanks,
Mike
»> Martin Haeberle 07/07/2008 12:54 PM »>
Mike,
How about tomorrow morning at 9:30.
John,
I would like to have Mark their, if possible, in that he is the most familiar.
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (f)
970.376.3672 (c)
i
Carolyn Godfrey
From: Mike McGee
Sent: Monday, July 07, 2008 12:56 PM
To: John King; mark.gunther@safebuilt.com; Martin Haeberle
Cc: Fire_Inspectors; Leonard Sandoval; Mark Miller; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
I can do that.
I have a 10:30 here at Station 2.
Thanks,
Mike
»> Martin Haeberle 07/07/2008 12:54 PM »>
Mike,
How about tomorrow morning at 9:30.
John,
I would like to have Mark their, if possible, in that he is the most familiar.
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (f)
970.376.3672 (c)
i
Carolyn Godfrey
From: Deborah Shaner-Lueck <shanerls@comcast.net> on behalf of Deborah Shaner-Lueck
Sent: Thursday, December 03, 2009 12:00 PM
To: Mike Vaughan
Cc: Mike McGee; 'John Ballman'
Subject: Four Seasons
Attachments: 6-24-09 letter.pdf
Hi Mike. I hope you are feeling OK. I need to touch base with you on the Four Seasons. RJA is asking for Class A SLC
circuits. If you recall, we discussed the configuration of the system over the summer—letter attached for your
reference. You had pre-approved our plan as described in the letter. We are planning to respond to RJA informing them
of our letter and indicating we will not be doing Class A SLC circuits on the floors. Only the riser will be Class A. Please
advise if you concur. I will give you a call this afternoon to discuss further. Thanks.
Debbie
Deborah L. Shaner-Lueck, P.E.
Shaner Life Safety
(970)409-9082
�
Carolyn Godfrey
From: Shelley Bellm
Sent: Monday, February 01, 2010 3:32 PM
To: Leonard Sandoval; Martin Haeberle; Mike McGee; Tom Kassmel; Warren Campbell;
jeaton@safebuilt.com
Cc: Jennifer Eliuk; Tammy Nagel
Subject: Four Seasons
I have a continuation of the original open records request regarding the Four Seasons Hotel. They are requesting
electronic copies of any items we have received since December 16, 2009. If you have any items in your possession,
please let me know.
Our turn around time for record requests is 3 days. If you are unable to meet this time frame, please let me know so I
can inform the requestor in writing that we are unable to meet the 3 day turn around.
Since this is the 2nd request in a very short period of time, I would like to suggest that everyone keeps track of any items
received on this project, scan the items into the project folder (or get the items scanned into the project folder) and
notify ComDev_Admin when items are added to Laserfiche.
I wouldn't expect that these requests will stop until long after the project is complete.
Please let me know if you have any questions or if I can assist you in any way.
Shelley
i
Carolyn Godfrey
From: Mike McGee
Sent: Monday, July 07, 2008 7:59 AM
To: John King; Martin Haeberle; Mark Miller
Cc: Leonard Sandoval;Tom Kassmel
Subject: four seasons 7 4 08.PDF - Adobe Acrobat Standard
I have attached a copy of the incident report from the Four Seasons incident that occurred on the 4th of]uly.
The narrative should explain the issues.
Any suggestions on how you would like for us to proceed?
I can see workers coming and going from the 3rd floor from the office door.
Clearly Mike Ellis took some liberties that he shouldn't have.
I am of the opinion Layton only does what they are forced to do.
Mike McGee
�
i
Carolyn Godfrey
From: Mike McGee
Sent: Monday, July 07, 2008 7:59 AM
To: John King; Martin Haeberle; Mark Miller
Cc: Leonard Sandoval;Tom Kassmel
Subject: four seasons 7 4 08.PDF - Adobe Acrobat Standard
I have attached a copy of the incident report from the Four Seasons incident that occurred on the 4th of]uly.
The narrative should explain the issues.
Any suggestions on how you would like for us to proceed?
I can see workers coming and going from the 3rd floor from the office door.
Clearly Mike Ellis took some liberties that he shouldn't have.
I am of the opinion Layton only does what they are forced to do.
Mike McGee
�
i
Carolyn Godfrey
From: Mike McGee
Sent: Tuesday, July 22, 2008 10:33 AM
To: Mark Miller
Subject: four seasons 7 4 08.PDF - Adobe Acrobat Standard
Here is a copy of the report I generated and emailed to you on 7 7 08 on the Four Seasons from the 4th of July.
I will put a hard copy in your mail slot.
I do not recall if I took photos but I will check.
If we need more, let le know.
Thanks,
�
Mike
i
Carolyn Godfrey
From: Martin Haeberle
Sent: Wednesday, November 18, 2009 7:44 AM
To: Doug Thompson
Cc: Mike McGee
Subject: Re: Four Seasons - Temporary Protection
Yes,
From the Fire Department
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81657
970.479.2142 (o)
970.479.2452 (f)
970.376.3672 (c)
»> "Doug Thompson" <dthompson@hyderinc.com> 11/18/2009 4:51 AM »>
Martin,
We are considering placing a temporary tent structure over the pool area
on the south side courtyard area of the Four Seasons to allow us to
construct the pool and spas this winter. It would be in place from
January through April/May. Do we need to procure a permit for this
temporary tent to be used strictly for construction activities?
i
Carolyn Godfrey
From: Mike McGee
Sent: Monday, July 07, 2008 12:56 PM
To: John King; mark.gunther@safebuilt.com; Martin Haeberle
Cc: Fire_Inspectors; Leonard Sandoval; Mark Miller; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
I can do that.
I have a 10:30 here at Station 2.
Thanks,
Mike
»> Martin Haeberle 07/07/2008 12:54 PM »>
Mike,
How about tomorrow morning at 9:30.
John,
I would like to have Mark their, if possible, in that he is the most familiar.
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (f)
970.376.3672 (c)
i
Carolyn Godfrey
From: Martin Haeberle
Sent: Monday, July 07, 2008 12:55 PM
To: Mike McGee;John King; mark.gunther@safebuilt.com
Cc: Fire_Inspectors; Leonard Sandoval; Mark Miller; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
Mike,
How about tomorrow morning at 9:30.
John,
I would like to have Mark their, if possible, in that he is the most familiar.
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (f)
970.376.3672 (c)
i
Carolyn Godfrey
From: Mike McGee
Sent: Monday, July 07, 2008 10:53 AM
To: John King; Martin Haeberle
Cc: Fire_Inspectors; Leonard Sandoval; Mark Miller; Tom Kassmel
Subject: RE: four seasons 7 4 08.PDF -Adobe Acrobat Standard
To AII,
I had a discussion with Chief Miller this morning ref the Four Seasons.
I would like to request a walk-through with Martin and perhaps John King to see first hand, the conditions as they exists
now.
The IFC requires temp standpipes, an operational plan, and an exiting plan. Normal workplace standards would require
adequate lighting. and ventilation.
The Fire Dept's biggest concern is we not have a clear and consistent means of access or egress. Layton continues to
frame and pour faster than they can draft updated plans.
We have no means to fight a fire in the lower levels, despite the presence of flexible natural gas lines strung across screw
jacks with bailing wire, active temp electrical services, storage rooms and cages with a variety of materials, and the
offices in the basement.
Rescue of construction workers will be a challenge due to what seems to be an ever changing exit path, most of which
are not marked. Stairs that were there last week are gone now. New stairs are there but not labeled.
Escape routes were to be marked in red lines on the floor. What lines exists are often covered with materials, fade to
nothing, stop mid way, or are not there at all.
Layton has an excuse for each element.
This weekends incident just tends to reinforce my observation that they will do whatever they think they can get away
with.
When they get caught, they apologize and repeat the same mistake. Makes me think their "mistakes" are not accidents.
I am open today and Tues.
I will be out of the state for two weeks starting Thurs AM.
I am trying to hold Wed afternoon open for last minute clean up.
If there is some time you can spend to do a walk through thoday or Tues,
Please let me know.
Thanks,
Mike
»> John King <]King@safebuilt.com> 07/07/2008 10:18 AM »>
Martin, per discussions with Mike, we have only been performing inspections on the upper level of the four seasons
project since the Red Tag was issued.
i
Please let me know if there is anything I can do to help.
Thanks, John
-----Original Message-----
From: Martin Haeberle [mailto:MHaeberle@vailgov.com]
Sent: Monday, July 07, 2008 10:15 AM
To: John King
Cc: Leonard Sandoval; Mike McGee; Mark Miller; Tom Kassmel
Subject: Re: four seasons 7 4 08.PDF - Adobe Acrobat Standard
]ohn,
Please give me an update on the status of inspections for this project so that I can adequately support and address Mikes
concerns
Thanks
Martin
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81658
970.479.2142 (o)
970.479.2452 (�
970.376.3672 (c)
z