HomeMy WebLinkAboutB11-0496 REV19 scope of work � ARCHITECTURE CONSTRUCTION CHANGE DIRECTIVE
URBAN DESIGN
. INTERIOR DESIGN
PROJECT NAME: Lion Vail(Strata Vail) CCD#: 055 � OWNER
�ARCHITECT
� CONSULTANT
� CONTRACTOR
PROJECT#: 1]004.15 DATE OF ISSUANCE: oi/29/2oi6 ❑ FIELD
❑
CONTRACTOR: PCL Construction ARCHITECT: OZ Architecture, Inc.
z000 South Colorado Blvd
TowerTwo Suite z-Soo OWNER: LionsHead Inn, LLC
Denver, Colorado 8oz�2 CONTRACT FOR: Construction
Vail Colorado
CONTRACT DATED: May zoiy
YOU ARE HEREBY DIRECTED TO MAKE THE FOLLOWING CHANGE(5) IN THIS CONTRACT:
1. North Frontage road CDOT median configuration.
2. Emergency Fire Truck access point location.
3. Gas meter revised location and concrete pad.
4. Landscape and Irrigation revisions based upon the new configurations.
5. MEP Revisions
CIVIL:
Sheet # Description of Revisions
C1.03: Revised sidewalk alignment to accommodate new gas pad location. Revised adjacent
grading. Revised path material from asphalt to concrete for the portion of the path that
connects to the frontage road from the 10' wide concrete path (the emergency fire truck
access at the NW corner of the site). Added two signs.
C1.03B: Added storm sewer and a curb inlet to capture runoff from the north side of the frontage road
median and discharge it in the roadside ditch.
C1.04: Revised gas meter location.
C1.05: Added an irrigation line and meter box for providing irrigation to the frontage road median.
C1.07: Added median details. Added CDOT storm sewer trench detail.
C1.08: Added TOV curb inlet detail and a TOV sign post detail.
C1.09: Added an irrigation tap detail.
LANDSCAPE:
Sheet # Description of Revisions
L1 : Grading, sidewalk and drive changes were made to accommodate new gas meter location on north
side of the building and the revised fire department access.
� ���,� : � _ � � 3 ,-, � . , � �� ��
;�; ;� � ��.� �, ,� ��.��. ;�, ,.
� DENVER PHONE: 303.861.5704
3003 LARIMER STREET FAX: 303.861.9230
DENVER BOULDER COLORADO SPRINGS DENVER,COLORADO 80205 WWW.OZARCH.COM
�
�7
L2 : Grading, sidewalk and drive revisions made to accommodate new gas meter location on north side of
the building.
L6 : Landscape and irrigation revisions were made to include the CDOT US Highway 6 median landscape
to the north, adjustments to landscape areas around the building based on the new gas meter
location and sidewalk revisions, and adjustments to the landscape around the west side of the
building to accommodate Vail Spa requests for informal arrangement of plantings and meandering
shrub bed.
IRRIGATION
Sheet # Description of Revisions
IR-1 : Revised to match updated civil and landscape configuration.
ARCHITECTURAL
Sheet # Description of Revisions
A2.01: Revised the Frontage road median, fire truck access, gas meter location and sidewalk
configuration to match the Civil engineer plans.
ELECTRICAL:
Sheet # Description of Revisions
E2.00 : Added junction box for irrigation controller.
Moved duplex receptacle to avoid pathway.
E1.12 : Added circuit number TOV-14 for irrigation controller.
MECHANICAL:
Sheet # Description of Revisions
M1.17: Delete snow melt zones 10 and 12. (Cap unused Zone box piping in level P-1).
Reduce the size of Zone 11 and relocate the zone valve box.
PLUMBING :
Sheet # Description of Revisions
P2.01A : Relocate the gas meters and associated piping.
Page z or,
G:\zoo7\i7ooy�ionshead Inn�CA\CCD�CCD_o55 Site and Landscape Revisions\CCD_o55 Site and Landscape Revisions.docx
�
�7
ATTACHMENTS:
Civil :Cs.o3,C1.o3B,Cs.o4,C1.o5,Ci.o7,Ci.o8,Ci.og
Landscape: Li, Lz, L6
Irrigation : IR-i
Architectural :Az.oi
Electrical : Ez.00, Ei.iz
Mechanical : Mi.i7
Plumbing : Pz.oiA
PROPOSED ADJUSTMENTS
i. The proposed basis of adjustment to the Contract Sum or Guaranteed maximum Price is:
i. ❑ Lump Sum Decrease of$00000.00
ii. ❑ Unit Price of$00000.00 per
iii. �As provided in Subparagraph 7.3.6 of AIA Document Azoi, zoo7 edition.
iv. ❑As follows:
z. The Contract Time is proposed to be determined .The proposed adjustment, if any, is days.
WHEN SIGNED BY THE OWNER AND ARCHITECT AND RECEIVED BY THE CONTRACTOR,THIS DOCUMENT BECOMES EFFECTIVE IMMEDIATELY
AS A CONSTRUCTION CHANGE DIRECTIVE(CCD)AND THE CONTRACTOR SHALL PROCEED WITH THE CHANGE(S)DESCRIBED ABOVE.
SIGNATURE BY THE CONTRACTOR INDICATES THE CONTRACTOR'S AGREEMENT WITH THE PROPOSED ADJUSTMENTS IN CONTRACT SUM
AND CONTRACT TIME SET FORTH IN THIS CONSTRUCTION CHANGE DIRECTIVE.
ARCHITECT: OWNER: CONTRACTOR:
OZ Architecture, Inc. Lionshead Inn, LLC PCL Construction
3003 Larimer Street 705 West Lionshead Circle z000 South Colorado Blvd.
Denver, Colorado 8ozo5 Vail, CO 8i657 Denver, CO 8ozzz
Vail,CO
SIGNED: SIGNED: SIGNED:
BY: BY: BY:
DATE: DATE: DATE:
For review of AIA Document G7i4-zooi
I _J`J
G:�zoo7\i7ooy lionshead Inn�CA�CCD�CCD_o55 Site and Landscape Revisions\CCD_o55 Site and Landscape Revisions.docx