Loading...
HomeMy WebLinkAboutB14-0044 Blower Door report ���.������'��� � '��'`��l.�J����IliJ6.a"e�v�. Lion's Ridge Apartments — Building 4 Final Blower poor Report Test Date: April 18, 2016 Builder: Gorman & Company, Inc. Contact: Clint Tyrell; Chuck Collins Site Address: North Frontage Road, Vail, CO Site Visit By: Kristen Hartel Report By: Kristen Hartel Background The project goal is to undergo testing at final construction to determine if the project meets code requirements for air lealcage (3ACH50). ACH50 results as determined by depressurizing each unit are listed below. Site Observations To comply with RESNET sampling protocol, testing was completed on ll randomly-chosen units in each building in a variety of conditions (i.e. firewall, unit type, and number of exterior walls). Outside air temperature during the test was approximately 35°F. Construction was finished. All windows were installed and latched shut. The blower door test was performed in the entrance door to each unit. Air Leaka e Results Unit Number Unit Type Unit Conditions CFM @ 50 Pa ACH 50 3103 C Firewall/Interior 295 2.13 3106 D Firewall/Interior 430 2.96 3107 A Firewall/Interior 255 2.73 3201 A No firewall/Exterior 272 2.91 3202 C No firewall/Exterior 308 2.23 3301 A No firewall/Exterior 270 2.89 3302 C No firewall/Exterior 324 2.34 3303 C Firewall/Interior 380 2.75 3304 D Firewall/Interior 405 2.79 3305 C Firewall/Interior 375 2.71 3306 D Firewall/Interior 335 2.31 Please call with any questions or concerns. �.�-�stew �tavte� 9�0-�0�-�-��-g ��-�ste wC�s�ct�ve�werc��es.co w� Page 1 of 1 4/19/2016 P.O. Box 7627, Avon,CO 81620 I P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com