HomeMy WebLinkAboutB14-0044 Blower Duct report �r�l�:'�1���'�
�.i�T���.�'���l���.�'a��-.
Lion's Ridge Apartments —Building 3
Final Duct Leakage Report
Testing Date: April 18, 2016
Builder: Gorman Builders
Contact: Clint Tyrrell; Chuck Collins
Site Address: Lion's Ridge Apartments,Vail
Testing By: Kristen Hartel
Report By: Kristen Hartel
Background
Final duct leakage performance testing was completed for all upper level units in Building 3 of
Lion's Ridge Apartments.
The Town of Vail has adopted the 2012 IECC, which currently requires that losses within the duct
system do not exceed 4 cubic feet per minute (cfm)to the exterior of the unit for every 100 square
feet of living space.
Measured Leakage
Building 3
Unit Number Unit Type Unit Allowable Confirmed
Condition Leakage (cfm) Leakage (cfm)
3301 A Exterior 25 18
3302 C Exterior 37 17
3303 C Interior 37 34
3304 D Interior 39 37
3305 C Interior 37 36
3306 D Interior 39 38
3307 A Interior 25 21
3308 B Interior 26 18
3309 A Exterior 25 13
3310 D Exterior 39 37
Please call with any questions or concerns.
Kristen ��arte�
P: 970-306-4Z48
Kristen@ActiveEner�ies.com
P.O. Box 7627, Avon,CO 81620 I P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com