Loading...
HomeMy WebLinkAboutB14-0044 Blower Duct report �r�l�:'�1���'� �.i�T���.�'���l���.�'a��-. Lion's Ridge Apartments —Building 3 Final Duct Leakage Report Testing Date: April 18, 2016 Builder: Gorman Builders Contact: Clint Tyrrell; Chuck Collins Site Address: Lion's Ridge Apartments,Vail Testing By: Kristen Hartel Report By: Kristen Hartel Background Final duct leakage performance testing was completed for all upper level units in Building 3 of Lion's Ridge Apartments. The Town of Vail has adopted the 2012 IECC, which currently requires that losses within the duct system do not exceed 4 cubic feet per minute (cfm)to the exterior of the unit for every 100 square feet of living space. Measured Leakage Building 3 Unit Number Unit Type Unit Allowable Confirmed Condition Leakage (cfm) Leakage (cfm) 3301 A Exterior 25 18 3302 C Exterior 37 17 3303 C Interior 37 34 3304 D Interior 39 37 3305 C Interior 37 36 3306 D Interior 39 38 3307 A Interior 25 21 3308 B Interior 26 18 3309 A Exterior 25 13 3310 D Exterior 39 37 Please call with any questions or concerns. Kristen ��arte� P: 970-306-4Z48 Kristen@ActiveEner�ies.com P.O. Box 7627, Avon,CO 81620 I P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com