HomeMy WebLinkAboutB14-0045 Blower Door report ���.������'���
� '��'`��l.�J����IliJ6.a"e�v�.
Lion's Ridge Apartments — Building 4
Final Blower poor Report
Test Date: April 13, 2016
Builder: Gorman & Company, Inc.
Contact: Clint Tyrell; Chuck Collins
Site Address: North Frontage Road, Vail, CO
Site Visit By: Kristen Hartel
Report By: Kristen Hartel
Background
The project goal is to undergo testing at final construction to determine if the project meets code
requirements for air lealcage (3ACH50). ACH50 results as determined by depressurizing each
unit are listed below.
Site Observations
To comply with RESNET sampling protocol, testing was completed on 12 randomly-chosen
units in each building in a variety of conditions (i.e. firewall, unit type, and number of exterior
walls).
Outside air temperature during the test was approximately 55°F. Construction was finished. All
windows were installed and latched shut. The blower door test was performed in the entrance
door to each unit.
Air Leaka e Results
Unit Number Unit Type Unit Conditions CFM @ 50 Pa ACH 50
4106 D Firewall/Interior 375 2.58
4108 D Firewall/Interior 345 2.38
4109 AA Firewall/Interior 225 2.4
4111 C No firewall/Exterior 265 1.9
4205 C Firewall/Interior 345 2.5
4207 C Firewall/Interior 315 2.28
4209 A Firewall/Interior 218 2.33
4301 C No firewall/Exterior 375 2.7
4304 D Firewall/Interior 415 2.86
4306 D Firewall/Interior 440 3.03
4311 C No firewall/Exterior 300 2.17
4312 B Firewall/Interior 295 2.98
Please call with any questions or concerns.
�.��stew +--ra�te�
_9�0-�0�--���g
K.�i,ste v�@,4cti,ve�vi,e��i.es.co vv�.
Page 1 of 1 4/19/2016
P.O. Box 7627, Avon,CO 81620 I P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com