Loading...
HomeMy WebLinkAboutB14-0045 Blower Duct report �r�l�:'�1���'� �.i�T���.�'���l���.�'a��-. Lion's Ridge Apartments —Building 4 Final Duct Leakage Report Testing Date: April 18, 2016 Builder: Gorman Builders Contact: Clint Tyrrell; Chuck Collins Site Address: Lion's Ridge Apartments,Vail Testing By: Kristen Hartel Report By: Kristen Hartel Background Final duct leakage performance testing was completed for all upper level units in Building 4 of Lion's Ridge Apartments. The Town of Vail has adopted the 2012 IECC, which currently requires that losses within the duct system do not exceed 4 cubic feet per minute (cfm)to the exterior of the unit for every 100 square feet of living space. Measured Leakage Building 4 Unit Number Unit Type Unit Allowable Confirmed Condition Leakage (cfm) Leakage (cfm) 4301 C Exterior 37 36 4302 B Exterior 26 25 4303 C Interior 37 35 4304 D Interior 39 37 4305 C Interior 37 37 4306 D Interior 39 19 4307 C Interior 37 30 4308 D Interior 39 22 4309 A Interior 25 21 4310 B Interior 26 24 4311 C Exterior 37 37 4312 B Exteriar 26 26 Please call with any questions or concerns. Kristen �arte� P: 970-306-4Z48 Kristen@ActiveEner�ies.com P.O. Box 7627, Avon,CO 81620 I P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com