Loading...
HomeMy WebLinkAboutB16-0122_A1_plans.pdfEdelweiss Unit #306 103 Willow Place Scope of Work-Replace existing bathtub with shower only All Construction to comply with 2015 IBC Type of Construction: III-A Occupancy Classification: R-2 Building has automatic fire sprinkler system Proposed Plumbing Fixture Count: no change All new plumbing fixtures, etc shall comply w/ current energy codes as adopted by the Town of Vail Bathtub to be Replaced with Shower Only A1 05/03/16