HomeMy WebLinkAboutB11-0496 RK Mechanical letter d `.4
September 8, 2016
PCL Construction Services, inc. Response Requested:
2000 S Colorado Blvd Yes _ No X
Tower 2, Suite 2-500
Denver, Colorado 80222
Attention: Mr. Jim Waugh Sent Via: E-Mail
Reference: Strata Vail
RK Mechanical Project Number 4009
Subject:
Mr. Waugh,
This letter is being provided in order to confirm the discussions held during the 8.26.2016 courtesy
inspection walk between Travis Ahrens (RK), Bud Davis (RK), and J.R. Mondragon (Town of Vail).
During this walk RK and T.O.V reviewed the installation of the wall caps located on the roof of building B, as
well as the IRH heaters currently installed at this location. The below summarizes the conditions of these
installations and the direction for resolution:
1. Wall Caps: The contract drawings provide a note to locate the wall caps a minimum of 3' above the
flat roof. The field conditions do not allow for this requirement to be met as the parapet wall limits
the maximum elevation of the wall caps to be at 2', which is where they are currently installed. The
wall caps are located in areas that will be monitored with snowmelt. As such, the T.O.V determined
that the wall caps are at an acceptable elevation at 2' above the flat roof and no further action is
required. Note that the parapet walls at Building A are higher and will allow for a 3'clearance for the
wall caps.
2. IRH Heaters: It was discussed that the IRH heater vents are within the clearance of the attic relief
at the ridge of the roof. Per T.O.V the IRH heater vents are to be extended to 3' higher than the roof
ridge in order to achieve an acceptable clearance, which will apply to building A as well.
We are available to discuss any comments or questions you may have concerning this matter.
Sincerely,
RK MECHANICAL, INC.
Sean D. Warren
Project Manager
xc: RK Job#4009- Files
3800 Xanthia Street
Denver, Colorado 80238
ph: 303.355.9696
fx: 303.355.8666