HomeMy WebLinkAboutB16-0452 HOA approval.pdf 08-SEP-2016 8:380Fr om;9704764922 Pa9e:111
PINE RIDGE TOWNHOUSES ASSOCIATION FOR OFFICE USE ONLY
ARCHITECTURAL CONTROL COMMITTEE (ACC) IMPROVEMENT REQUEST Date Received
Critical Date.
COMMUNITY MANAGEMENT SPECIALISTS, INC. Date Sent to ACC
1224 Wadsworth Blvd.Lakewood, CO 80214
720/377-0100* *720/377-0111 Fax Date Received from ACC
pep.
Name: Pc.„e de, &-,+"-ft PI r c„ Filing: Block: Lot:
Address:219a_ CI 41)C LA* IS Home Phone:2.,t‘t t S3„
City: I State: (,,ei Zip: RI 6C 9 Work Phone:
Mailing address if different than proposed improvement(s)
My request involves the following type of improvement
o Satellite Dish(Satellite dishes cannot be installed on roofs. The preferred location is on the patio/deck on a free
standing pole.)
ri Air Conditioner 0 Patio/Deck Improvements or Changes
)<Window Replacements 0 Front Door Replacement
0 Other
D- ribe Improvern-nts:(be specific) _
A /, Olt ,sug.-441 •
iut/,0411r
Planned Installation Date: f+i— --to
I understand that I must receive approval of the Architectural Control Committee or Board of Directors in order to proceed.
I understand that AC approval does not constitute approval of the local building department and that I may be required to
obtain a building permit. I agree to complete improvements promptly after receiving approval. I have read the instruction
sheet and will comply. I also understand that I shall maintain proper drainage away from my foundation and not impede
proper drainage swales on my lot when installing landscape or building improvements. Upon the comple.:on of my
improvement I hereby authorize the Architectural Committee and Community Management Specialiste enter onto my
property for exterior inspection at a mutually agreed upon time.
Date: 9, • 6 I G Homeowners Signature: 421-Th
ACTION:
Approved as Submitted.
0 Approved subject to the following requirements
la Disapproved:
Architectural Control Committee MemberIA!V ,AY. . Data: Co Aex„; —
Please remember to get any pe, its that may be required for your improvement from the City before construction begins.