Loading...
HomeMy WebLinkAboutB16-0442 HOA approval.pdf Warren Krok From: Patrick Pinnell <Patrick@northwoodsvail.com> Sent: Wednesday, October 12, 2016 4:52 PM To: Warren Krok Cc: Rollie Kjesbo;Tim Barany Subject: RE: NW E413- Padich Window Replacement Warren, The installation of the window is approved with a recommendation the bottom right sash is a fixed unit as it is so close down to the roof.This location holds several feet of snow in the winter so please take all care with the installation so as to avoid leaks.There are no signs of leaks presently or in the past at this area. Please ensure all installation, materials and finishes match the details and finishes used by R A Nelson during the renewal project and any elevation affected is refinished corner to corner to prevent any additional joints or visible patching. The main contract painter has informed us it is now too cold at night for sealants and painting so if any finishes are not acceptable please be prepared to refinish next spring. Please take all care on the roof, protect as necessary and leave in a clean damage free state. All work at Northwoods must be complete by the 18th of November, 2016. Please use this email for your DRB application if required and let me know if you need more. Thank you, Patrick. PATRICK PINNELL GENERAL MANAGER U WOODS NorthwoodsVail.com P: (970) 476-3486 F: (970) 479-9093 From: Warren Krok [mailto:warren@nedbo.com] Sent: Tuesday, October 11, 2016 4:37 PM To: Patrick Pinnell Cc: Rollie Kjesbo; Tim Barany Subject: NW E413- Padich Window Replacement Patrick-attached is a R1 form signed by owner along with an elevation of the window they would like to replace. Please let me know if you have any questions or need any other information. Thanks and have a good one. Warren Warren Krok Nedbo Construction 1 A ..J.ThIP1 PO Box 3419, Vail, CO 81659 970-845-1001 office 970-977-0333 cell 2