Loading...
HomeMy WebLinkAboutB16-0481_A0.01_1482188419.pdf8 7 6 5 4 3 9 T U V 73'-6 1/8" LEASELINE TO LEASELINE 30'-4" LEASELINE TO LEASELINE 2 3 LINEAR FEET EXIT 27 O.C.C. EGRESS: OCCUPANT LOAD: (2015 IBC TABLE 1004.1.2) OFFICE: 195 S.F. / 100 S.F. PER OCC. = 2 OCC. SHOWROOM AND LOUNGE : 1,506 S.F. / 60 S.F. PER OCC. = 25 OCC. TOTAL OCCUPANT LOAD = 27 PERSONS NUMBER OF EXIT REQUIRED: (1) EXIT NUMBER OF EXIT PROVIDED: (1) EXIT TOTAL EGRESS WIDTH REQUIRED: 0.2" PER PERSON x 27 PERSONS = 5.4 IN. TOTAL OCCUPANT LOAD = 27 PERSONS PLUMBING CALCULATION (2015 IBC TABLE 2902.1) MALL ACCESSIBLE PUBLIC RESTROOMS WITHIN 300 FEET FROM THE TENANT SPACE, SEE DET.2 FOR PATH OF TRAVEL TO MALL ACCESSIBLE PUBLIC RESTROOMS. IN ADDITION, TOILETS SUPPLIED BY MALL PROVIDES 1 W.C. +1 LAVATORY FOR MEN AND 1 W.C. + 1 LAVATORY FOR WOMEN REQUIRED: PROVIDED: 1 1 PUBLIC PUBLIC CODE REQUIREMENTS: MAXIMUM DEAD END CORRIDOR LENGTH MINIMUM CORRIDOR / AISLE WIDTH MINIMUM CLEAR OPENING OF EXIT DOOR MAXIMUM TRAVEL DISTANCE TO EXIT -WITHOUT SPRINKLER SYSTEM -WITH SPRINKLER SYSTEM 250 FT. 200 FT. 32 IN. 44 IN. 20 FT. WATER CLOSET: LAVATORY: MAX COMMON PATH OF TRAVEL: 75 LF (100LF IN STOCK). MAX TOTAL EXIT ACCESS TRAVEL DISTANCE: 250 LF. >50 OCCUPANTS REQUIRE 2 EXITS. MALL EXIT CORRIDOR (N.I.C.) ADJACENT TENANT (N.I.C.) 1506 SQ.FT. 165 SQ.FT. OFFICE SHOWROOM / SALES 73'-8" LEASE LINE LEASE LINE LEASE LINE LEASE LINE 1 MALL SERVICE SINK: COMMON SERVICE AREA ADJACENT TENANT (N.I.C.) SCALE: N.T.S. PATH OF TRAVEL TO MALL ACCESSIBLE PARKING AND MALL PUBLIC RESTROOMS 2 SCALE: 1/8" = 1'-0" EXITING PLAN 1 A0.01 EXITING REQUIREMENTS AND PATH OF TRAVEL AS NOTED GENERAL NOTES ACCESSIBLE PATH OF TRAVEL TO ACCESSIBLE PARKING RETAIL SPACE #202 290'-0" L.F. PATH OF TRAVEL TO ACCESSIBLE RESTROOMS AND DRINKING FOUNTAINS SCALE: PROJECT NUMBER: DRAWING TITLE ISSUE / REVISION 51643 SOLARIS PLAZA 141 E MEADOW DRIVE #202 VAIL, CO 81657 SHEET NUMBER 10.26.16 PERMIT ISSUE 960 Atlantic Ave. Alameda, CA 94501 510 865 8663 mbharch.com 12.15.16 PLAN CHECK COMMENTS N 1. ALL WORK ON THIS PROJECT SHALL COMPLY WITH ALL CODES, ORDINANCES, AND REQUIREMENTS OF THE STATE AND LOCAL AGENCIES HAVING JURISDICTION. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BIDDING AND VERIFYING EXISTING CONDITIONS AS REFLECTED IN THESE CONTRACT DOCUMENTS. ANY EXTRA WORK REQUIRED BUT NOT INCLUDED IN THE DOCUMENTS SHALL BE REPORTED TO THE OWNER AND OWNER'S ARCHITECT IMMEDIATELY. 3. PRIOR TO COMMENCEMENT OF ANY WORK, THE GENERAL CONTRACTOR SHALL CONTACT AND MEET WITH LANDLORD'S OWNER COORDINATOR AND OWNER'S PROJECT MANAGEMENT REPRESENTATIVE FOR A PRECONSTRUCTION MEETING, AT WHICH TIME, THEY WILL PRESENT TO ALL PARTIES A LIST OF NAMES, ADDRESSES, BUSINESS PHONE, FAX AND EMERGENCY TELEPHONE NUMBERS OF THE SUBCONTRACTORS FOR THIS PROJECT. THE GENERAL CONTRACTOR WILL COMPLETE THE CHECKLIST FORM (CONTRACTOR INFORMATION FORM) REQUIRED FOR EACH OWNER'S SPACE THAT CONTRACTOR WILL BE WORKING ON AS REQUIRED. 4. THE PROPER RECEIPT OF ALL NEW MATERIALS AND EQUIPMENT AT THE JOB SITE IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR, AND / OR ITS SUBCONTRACTORS (IF ANY). SECURE AND SAFE STORAGE OF ALL NEW AND EXISTING MATERIALS AND EQUIPMENT TO REMAIN (IF ANY) WILL BE PROVIDED BY THE GENERAL CONTRACTOR. GENERAL CONTRACTOR TO IMMEDIATELY ADVISE OWNER OR OWNER'S REPRESENTATIVE OF ALL DAMAGED OR DEFICIENT SHIPMENTS OF MATERIALS AND EQUIPMENT, WHETHER SUPPLIED BY OWNER OR DIRECTLY BY CONTRACTOR OR IT'S SUPPLIERS. 5. EACH CONTRACTOR AND SUBCONTRACTOR PARTICIPATING IN THE PERFORMANCE OF OWNER'S WORK SHALL (A) MAKE APPROPRIATE ARRANGEMENTS WITH LANDLORD FOR TEMPORARY UTILITY CONNECTIONS INCLUDING WATER AND ELECTRICITY, AS AVAILABLE WITHIN THE BUILDING. CONNECTIONS SHALL BE AT SUCH LOCATIONS AS SHALL BE DETERMINED BY LANDLORD, (B) PAY THE COST OF THE CONNECTIONS AND OF PROPER MAINTENANCE AND REMOVAL OF SAME, AND (C) PAY ALL UTILITY CHARGES INCURRED AT THE PREVAILING RATES OF THE UTILITY COMPANY PROVIDING SUCH SERVICE TO THE BUILDING, DURING THE COURSE OF CONSTRUCTION UP TO AND INCLUDING THE DATE OF "TURN OVER" TO THE OWNER. 6. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DAILY REMOVAL, OR AS REQUIRED BY LANDLORD, OF TRASH, RUBBISH AND SURPLUS MATERIALS RESULTING FROM CONSTRUCTION. THE CONTRACTORS AND SUBCONTRACTORS PARTICIPATING IN THE PERFORMANCE OF OWNER'S WORK SHALL REMOVE AND DISPOSE OF, AT LEAST ONCE A WEEK AND MORE FREQUENTLY AS LANDLORD MAY DIRECT, ALL DEBRIS AND RUBBISH CAUSED BY OR RESULTING FROM THE PERFORMANCE OF OWNER'S WORK AND, UPON COMPLETION THEREOF, REMOVE ALL TEMPORARY STRUCTURES, SURPLUS MATERIALS, DEBRIS AND RUBBISH OF WHATEVER KIND REMAINING IN THE BUILDING WHICH HAD BEEN BROUGHT IN OR CREATED BY THE CONTRACTOR AND SUBCONTRACTORS IN THE PERFORMANCE OF OWNER'S WORK. THIS CONTRACTOR MUST MAINTAIN A CLEAR PATH OF EGRESS FROM THE PREMISES FREE FROM TRASH AND RUBBISH AT ALL TIMES. 7. THE GENERAL CONTRACTOR WILL BE REQUIRED TO PROTECT ALL NEUTRAL PIERS, LANDLORD'S AND ADJACENT OWNER CONSTRUCTION IF ADJACENT TO OWNER'S WORK, AND MAKE ANY AND ALL REQUIRED REPAIRS TO THE SATISFACTION OF THE LANDLORD AND / OR THE ADJACENT TENANT IF THIS WORK IS DAMAGED. 8. THE GENERAL CONTRACTOR IS TO ARRANGE WITH THE LANDLORD FOR THE BUILDING, WHERE BUILDING EQUIPMENT AND MATERIALS ARE TO BE LOCATED AND HOW TRUCK TRAFFIC IS TO BE ROUTED TO AND FROM THE BUILDING. 9. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND HAVE CONTROL OVER CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT, INCLUDING ANY AND ALL OSHA REQUIREMENTS. 10. SPRINKLER SYSTEM DESIGN AND / OR LAYOUT MODIFICATION, (IF APPLICABLE) TO BE PROVIDED BY THE DESIGNATED SPRINKLER SUBCONTRACTOR AND ALL SUBMISSIONS TO THE FIRE MARSHAL AND BUILDING INSPECTOR FOR THE NECESSARY APPROVAL ARE THE RESPONSIBILITY OF THE SPRINKLER SUBCONTRACTOR. GENERAL CONTRACTOR TO VERIFY WITH THE LANDLORD OR LANDLORD'S CRITERIA IF SPRINKLER CONTRACTOR IS TO BE LANDLORD'S APPROVED OR DESIGNATED CONTRACTOR. SPRINKLER HEAD SPACING TO CONFORM WITH THE LATEST N.F.P.A. STANDARDS (PAMPHLET 13) AND ALL CODES HAVING JURISDICTION. SPRINKLER HEAD BRANCH LINES, DROPS AND HEADS ARE THE RESPONSIBILITY OF THE SPRINKLER SUBCONTRACTOR AND THE DESIGN MUST BE BASED ON FLOOR LAYOUT AND REFLECTED CEILING PLANS. 11. ALL CLEARANCES OF PIPES AND DUCT WORK INSTALLED BY THE GENERAL CONTRACTOR OR SUBCONTRACTORS MUST BE MAINTAINED FOR ADEQUATE HEIGHTS REQUIRED FOR CEILING SYSTEM AND LIGHT FIXTURES. CONTRACTOR MUST REVIEW ENTIRE SET OF CONTRACT DOCUMENTS FOR CEILING HEIGHTS. 12. THE CONTRACTOR SHALL NOTIFY THE OWNER AND ARCHITECT OF ANY DISCREPENCIES IN THE DRAWINGS BEFORE PROCEEDING WITH WORK. LEVEL1 LEVEL2 S FRONTAGE RD E. E MEADOW DR. VILLAGE CENTRE DR. S FRONTAGE RD E. E MEADOW DR. VILLAGE CENTRE DR. CUSTOMERS TO BE SERVED WATER WHILE IN SPACE FROM WATER COOLER LOCATED IN OFFICE. 1 1 1 12/19/16