HomeMy WebLinkAboutF16-0059_FP1 Plans Approved.pdf ° OiI/4
stC x79
o
on
E i I I I i —
FT\ 0 1
Vail Fire&Emergency Services
8-51/2 1 11/04/16
f I
r i7
Ni - 1 — i
1-2'
I - FREEZER
A I • +- 1111
COOLER I
110 } op__(t
-i-°N. I
`' I 5-1112 10-3 5-11/2
3-81/2 _ I I SCOPE OF WORK
• P n 1 P n M1 v-
,A,,,
L r �{� a I I ,:a:j_Lev ,,c)
Q sr? 1. ADD NEW OR RELOCATE EXISTING SPRINKLER HEADS TO CONFORM TO THE NEW WALL
1 1 gs° q-1 r - } 2 � �+ AND CEILING LAYOUT
,,ly 1=7iAS* 11 '+` 1-2 �LE � r � - y
o�� I � iii ■Mb& 2. INTERIOR SPRINKLER SYSTEMS SHALL START AT THE EXISTING SPRINKLER
�} \ BRANCHLINES.
0 L1"SNAP-LET
� . HANGER SPACING LEGEND 3 E R NFPA 13 TABLE 9.2.2.1 2013 ed
I, �' GENERAL NOTES NOMINAL PIPE
1" II Ik II ' 11 11
�� - - ,kgs° 1 �� 1 �'� 11/4 1'/� s 1. THIS CONTRACT INCLUDES THE MODIFICATION OF THE EXISTING HYDRAULICALLY SIZE (IN.) 1 Il4 1 112 2" 2 1/2' 3" 4 6 $
CALCULATED FIRE SPRINKLER SYSTEM TO ACCOMMODATE THE NEN TENANT FINISH OF STEEL PIPE
THE AREAS IDENTIFIED ON THE PLAN. SCH 40, SCH 10, DF, EF 12-0 12-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0
2. THE FIRE SPRINKLER CONTRACTOR SHALL NOT BE HELD RESPDNSIBLE FOR ANY - -
LEAKS IN AREAS OUTSIDE OF THIS CONTRACT SPACE NOTICED WHILE CONDUCTING WHERE STATIC OR OPERATING PRESSURES EXCEED 100 PSI HANGERS SHALL BE PER NFPA 13
HYDROSTATIC TEST NG. 9.2.3.5.2.1 2013 EDITION
SUPPORT clarify. Not found 3. ALL MATERIALS,DEVICES AIIJD HANGERS USED ON THIS PROJECT SHALL BE UL
118 in equipment data LISTED ANDIOR FM APPROVED.
sheets. 4. ALL NEW PIPING TO BE DYNA-THREAD (OR SIM.) PIPE WITH THREADED CLASS 125
%` CAST IRON FITTINGS.
CD - - +V 1 = 1 = 1'!a - 11/4
- - J
N 5_ PIPE HANGERS TO BE INSTALLED IN ACCORDANCE WITH NFPA 13 AND PER THE Hanger No. 06C
LOCAL AUTHORITIES HAVING JURISDICTION(AHJ). Concrete Anchor HILT! HDI
6_ SPR N KLERS TO BE INSTALLED IN ACCORDANCE WITH NFPA 13 AND PER LOCAL AHJ.
RECESSED PENDENT SPRINKLERS IN CEILINGS ARE NOT NECESSARILY CENTER OF TILE
AND ARE SHOWN THAT WAY FOR SCHEMATIC PURPOSES ONLY. " HILT! HDI Anchor7 5 /
(Drilled) / ---"-,--1- / /
8. THE OWNER SHALL MAINTAIN A CLEAR 18" BETWEEN THE CEILING AND THE TOP OF I /
ANY STORAGE OR OTHER OBSTRUCTIONS. �� '
/ , 1T . \-, r
Concrete
� '' ¢ = Construction
`� 1 1/4 g,° ti 11/2
''~ - - - All Thread
,111 w 1'/2 1112 1112 1's Rounded e.
��__
T Rod
— , Nearest Inch a
Bottom of Concrete to
r l4y�' x '\ Center Line of Fipe
r I Pipe Note on Plan
L 1 4 1 4 am
�f
\ I-441-- Swivel Ring -_
m
McDonald's Vail
Riser detail Job Number: 16-042 Job Name: McDonald's Vail
2171 N. F
needed-existi n or Vail, CO. 80657rontage Road
2 HANGER DETAILS
FIRE SPRINKLER SYSTEM TENANT FINISH g
720-840-1959 FPI SCALE: NOT TO SCALE
FPI SCALE: 1/4" = 1-0" new? Quantity Size Description Manufacturer Part Number
�i V V 4 1 5idewall; Tyco(OR) 1,12" Orifice 200°F,Chrome,DS-1
Tyco TY3335
3 1/2 Upright, Tyco (OR) 1I" Orifice, 155'5F, Brass, TY-FRB Tyco TY3131
4 1 401 Chrome Escutcheon for Dry Sidewall Tyco
35-3112 1 Pipe, Eddythread 40 IBMT) BMT
4 1 Square Head Plug Star
1 1 Threaded Coupling Alapter 'Star
8 1 Threaded 90° Elbow Star
1 1 x 1/2 Threaded 90° Reducing Elbow Star PLAN NOTES
1 1 x 1 x 1/2 Threaded Reducing Tee Star
5 1 Threaded Straight Tee Star 1. ALL ROOMS ANDAREAS ARE ORDINARY HAZARD UNLESS NOTED OTHERWISE.
2 2 x 1 Snap Let •Star *LH*= LIGHT HAZARC
5 1 Hanger Ring Tol:o 200 2. THE MAXIMUM AREA PER SPRINKLER IN LIGHT HAZARD IS 130 WITH MAXIMUM
LEGEND 5-0 318 All-Thread Rod
Too 100 DISTANCE FROM WALL OF 71-611.
5 3/8 Concrete Anchor Hilii HDI
3. ALL PIPE TO BE RUN EXPOSED.
BLK STEEL SPRINKLER PIPE 4. ENSURE ALL PIPING IS ADEQUATELY DRAINABLE EVEN IF ALL DRAINS ARE NOT
1 PIPE DIAMETER (S,, SHOWN ON THIS PLAN.
PIPE LENGTH oA PIPE ELEV.ABOVE FINISHED FLOOR
0-0 PIPE HANGER ____D'
OA ADDED SPRINKLER
QE EXISTING SPRINKLER
OR RELOCATED SPRINKLER
' EXISTING SPRINKLER PIPING
NEW 1" EDDYTHREAD 40 PIPING
T REVISIONS: SYMBOL DESCRIPTION SIN FINISH ORIFICE K-FAC TEMP ESCUTCHEON SPECIAL NOTE QTY THESE DRAWINGS ARE APPROVED AND SIGNED BY ABBREVIATIONS: 11 DRAWING TITLE: APPROVAL: VAIL FIRE DEPTT
TYCO TY-FRB UPRIGHT TY3131 BRASS 112- 5.6 155° NONE NONE 3 A LEVEL III N.I.C.E.T ENGINEERING TECHNICIAN AS A/S AUTO SPRINKLER DR SPRINKLER DROP LB LATERAL BRACE INTERIOR SPRINKLER m FIRE SPRINKLER SYSTEM PROJECT No: ,�042
ACE ELEC.AIR COMPRESSOR EH1 EXTRA HAZARD GP 1 LH LIGHT HAZARD '1p
E NO DATE DESCRIPTION ' TYCO DS-1 DRY SIDEWALL T13335 CHROME 1R 5 5 zvo° 401 NONE 4 REQUIRED BY THE STATE OF COLORADO. u 0 SCALE: 1/4"=1'-v
AFF ABOVE FINISHED FLOOR EH2 EXTRA HAZARD GP 2 LNB LONGITUDINAL BRACE TENANT BUILD-OUT 0
9/26/16 PERMIT/APPROVAL DWGS O 0 Z -,
AFG ABOVE FINISHED GRADE FDC FIRE DEPT.CONNECITON OHI ORDINARY HAZARD GP 1 - z m m DRAWN BY: K.JOHNSON
' L1\ AFS ANTIFREEZE SYSTEM FGC FLx GRV COUPLING OH2 ORDINARY HAZARD GP 2 S (STE ? I N ■ rr,0 PROJECT NAME: >n Cn 71 CHECKED BY: S.MENDENHALL
_ L2L BBD BELOW BOTTOM OF DECK FSR FIRE SPRINKLER RISER POC POINT OF CONNECTION
O p _
m -, SPKR ON SHEET: 7
N S L3, ' BBJ BELOW BOTTOM OF JOIST GL GALVANIZED PIPE PRS PREACTION SYSTEM 2125 61ST AVENUE z n o m I
' L 4
BBV BUTTERBALL VALVE GLV GLOBE VALVE
BFP BACKFLOW PREVENTOR GV GATE VALVE RB RISER BRACE
RN RISER NIPPLE GREELEY, COLORADO 80634 n M CD o NA L D1 S ➢0 cn SPKR ON JOB:
` 7
Z v rn CONS.TYPE: V•B
LSL KEITH E.JOHNSON C.E.T. BFV BUTTERFLY VALVE GYP GYPROCK FINISH SP SPRINKLER SPRIG (1) c'GOO
L , AUTOMATIC SPRINKLER SYSTEM LAYOUT CV CHECK VALVE HPS HIGH PILED STORAGE STP STANDPIPE RISER PH. (970) 302-3777 ISSA PROJECT ADDRESS: c c OCCUPANCY: A-2
W N.LC.E.T. LEVEL III #96985 DLS DELUGE SYSTEM HV HOSE VALVE UP UP PIPING FX. (970) 330-1091 -1 2171 N. FRONTAGE ROAD m
L7] INTERIOR SPRINKLER S YSTEMS, INC. CO FP OF
TOTAL MODIFIED SPRINKLER HEADS 7 DATE: SEPTEMBER 26,2016 DN DOWN PIPING IT INSPECTORS TEST ASSY WPS WET PIPE SYSTEM Fire Protection.Specialists 71 VAIL,CO.81657 - DRAWING NO: