Loading...
HomeMy WebLinkAboutE16-0173_N1.pdf olti OF go 4,5:"Ipre GENERAL CONSTRUCTION NOTES: 10. CABLES AND WIRES ON HORIZONTAL CABLE RACKS SHALL BE SECURED WITH 9 PLY POLYESTER TWINE AT THE FIRST AND 34. ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST REVISION 'Ai le.11 GENERAL CONSTRUCTION AT&T MOBILITY GROUNDING STANDARD"TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM/GPRS WIRELESS SITES" LAST STRAP,AND AT INTERVALS NOT TO EXCEED 3'.ON VERTICAL AND INVERTED CABLE RACKS,CABLES SHALL BE141. 1. FOR THE PURPOSE OF CONSTRUCTION DRAWINGS,THE FOLLOWING DEFINITIONS SHALL APPLY: AND"TECHNICAL SPECIFICATION FOR FACILITY GROUNDING".IN CASE OF A CONFLICT BETWEEN THE CONSTRUCTION SECURES AT EVERY STRAP. GENERAL CONTRACTOR:T.B.D. SPECIFICATION AND THE DRAWINGS,THE DRAWINGS SHALL GOVERN. # MI CONTRACTOR:T.B.D. 11. ATT-790-202-001 DAS EQUIPMENT&CABLE CODING STANDARDS SHALL BE USED FOR ALL EQUIPMENT,COAXIAL AND FIBER OWNER:AT&T 35. CONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR CONSTRUCTION. CABLE CODING.ATT-TP-76300 SECTION L SHALL BE FOLLOWED FOR THE STANDARDS ON LABELING ETHERNET,POWER IF CONTRACTOR CANNOT OBTAIN A PERMIT,THEY MUST NOTIFY THE GENERAL CONTRACTOR IMMEDIATELY. AND GROUNDING CABLES. , 2. ALL SITE WORK SHALL BE COMPLETED AS INDICATED ON THE DRAWINGS AND AT&T PROJECT SPECIFICATIONS. 36. CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS. ��� 3. GENERAL CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS AFFECTING THE 12. ALL 145P TYPE TAGS SHALL BE SECURED WITH MULTI-STRAND WAXED CORD,WITH A SUFFICIENT PIGTAIL TO ALLOW THE 4 PROPOSED WORK AND SHALL MAKE PROVISIONS.GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING 37. INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE VISITS AND/OR DRAWINGS PROVIDED BY THE TAG TO BE ROTATED FOR VIEWING.THE TAG SIZE SHALL BE BETWEEN 3/4"TO 1"WIDE,BY 1 1/4"TO 1 3/4"IN LENGTH. HIMSELF WITH ALL CONTRACT DOCUMENTS,FIELD CONDITIONS,DIMENSIONS,AND CONFIRMING THAT THE WORK MAY BE SITE OWNER.CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO ORDERING MATERIAL OR ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION.ANY DISCREPANCIES SHALL BE BROUGHT TO PROCEEDING WITH CONSTRUCTION. 13. MANUFACTURER SUPPLIED FIBER OPTIC WARNING LABELS SHALL BE APPLIED TO THE EQUIPMENT PER MANUFACTURER'S 09/16/16 THE ATTENTION OF THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. SPECIFICATIONS. 38. NO WHITE STROBE LIGHTS ARE PERMITTED.LIGHTING IF REQUIRED,WILL MEET FAA STANDARDS AND REQUIREMENTS. 4. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS,AND ORDINANCES.GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND COMPLY WITH ALL 39, ALL COAXIAL CABLE INSTALLATIONS TO FOLLOW MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. LAWS,ORDINANCES,RULES,REGULATIONS,AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY REGARDING THE GENERAL CABLE AND EQUIPMENT NOTES PERFORMANCE OF WORK. ANTENNA MOUNTING 5. ALL WORK CARRIED OUT SHALL COMPLY WITH ALL APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS AND 1. DESIGN AND CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR APPLICABLE LOCAL 1. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ANTENNA,TMAS,DIPLEX.ERS,AND COAX CONFIGURATION,MAKE AND THE RITZ CARLTON CLUB VAIL LOCAL JURISDICTIONAL CODES,ORDINANCES,AND APPLICABLE REGULATIONS. CODES. MODELS PRIOR TO INSTALLATION. 728 LIONSHEAD CIRCLE 6. UNLESS NOTED OTHERWISE,THE WORK SHALL INCLUDE FURNISHING MATERIALS,EQUIPMENT,APPURTENANCES,AND 2. ALL STEEL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123"ZINC(HOT-DIP 2. ALL CONNECTIONS FOR HANGERS,SUPPORTS,BRACING,ETC.SHALL BE INSTALLED PER MANUFACTURER'S VAIL,CO 81657 LABOR NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED ON THE DRAWINGS. GALVANIZED)COATINGS ON IRON AND STEEL PRODUCTS",UNLESS NOTED OTHERWISE. RECOMMENDATIONS. 7. PLANS ARE NOT TO BE SCALED.THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY UNLESS OTHERWISE 3. ALL BOLTS,ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM A153 Rev: Date: Description: By: NOTED.DIMENSIONS SHOWN ARE TO FINISH SURFACES UNLESS OTHERWISE NOTED.SPACING BETWEEN EQUIPMENT IS THE "ZINC-COATING(HOT-DIP)ON IRON AND STEEL HARDWARE",UNLESS NOTED OTHERWISE. 3. CONTRACTOR SHALL REFERENCE THE TOWER STRUCTURAL ANALYSIS/DESIGN DRAWINGS FOR DIRECTIONS ON CABLE MINIMUM REQUIRED CLEARANCE.THEREFORE,IT IS CRITICAL TO FIELD VERIFY DIMENSIONS,SHOULD THERE BE ANY DISTRIBUTION/ROUTING. 1 6/2/16 PRELIMINARY JND QUESTIONS REGARDING THE CONTRACT DOCUMENTS,THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A 4. DAMAGED GALVANIZED SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM A780. CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK.DETAILS ARE INTENDED TO SHOW DESIGN INTENT.MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS AND SUCH MODIFICATIONS SHALL BE 5. ALL ANTENNA MOUNTS SHALL BE INSTALLED WITH LOCK NUTS,DOUBLE NUTS AND SHALL BE TORQUED TO 4. ALL OUTDOOR RF CONNECTORS/CONNECTIONS SHALL BE WEATHERPROOFED,EXCEPT 2 8/19/16 REVISION 1 SL INCLUDED AS PART OF WORK AND PREPARED BY THE ENGINEER PRIOR TO PROCEEDING WITH WORK. MANUFACTURER'S RECOMMENDATIONS. THE RET CONNECTORS,USING BUTYL TAPE AFTER INSTALLATION AND FINAL CONNECTIONS ARE MADE.BUTYL TAPE SHALL HAVE A MINIMUM OF ONE-HALF TAPE WIDTH OVERLAP ON EACH TURN AND EACH LAYER SHALL BE WRAPPED THREE TIMES. 8. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S 6. CONTRACTOR SHALL INSTALL ANTENNA PER MANUFACTURER'S RECOMMENDATION FOR INSTALLATION AND GROUNDING. WEATHERPROOFING SHALL BE SMOOTH WITHOUT BUCKLING.BUTYL BLEEDING IS NOT ALLOWED.SELF BONDING TAPE AND 3 8/24/16 CONSTRUCTION SL RECOMMENDATIONS UNLESS SPECIFICALLY STATED OTHERWISE. PLASTIC ENCLOSURES ALSO PERMITTED PER ATT-002-290-041 SECTION 7. 7. CONTRACTOR SHALL VERIFY THE DOWN-TILT OF EACH ANTENNA WITH A DIGITAL LEVEL. 9. IF THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THESE DRAWINGS,THE CONTRACTOR SHALL PROPOSE 5. IF REQUIRED TO PAINT ANTENNAS AND/OR COAX: 4 8/29/16 PERMIT SET SL AN ALTERNATIVE INSTALLATION SPACE FOR APPROVAL BY THE ENGINEER PRIOR TO PROCEEDING. 8. ALL UNUSED PORTS ON ANY ANTENNA SHALL BE COVERED WITH CONCEALOR CAP WITH PROPER WEATHER PROOFING OR BE TERMINATED WITH A 50 D LOAD. A.TEMPERATURE SHALL BE ABOVE 50°F. 10. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA,ADJACENT AREAS AND BUILDING B.PAINT COLOR MUST BE APPROVED BY BUILDING OWNER/LANDLORD. OCCUPANTS THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT.WORK SHALL CONFIRM TO ALL 9. PRIOR TO SETTING ANTENNA AZIMUTHS AND DOWNTILTS,ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA MOUNT C.FOR REGULATED TOWERS,FAA/FCC APPROVED PAINT IS REQUIRED. OSHA REQUIREMENTS AND THE LOCAL JURISDICTION. FOR TIGHTNESS AND ENSURE THAT THEY ARE PLUMB.ANTENNA AZIMUTHS SHALL BE SET FROM TRUE NORTH AND BE ORIENTED WITHIN+/-5°AS DEFINED BY THE RFDS.ANTENNA DOWNTILTS SHALL BE WITHIN+1-0.5°AS DEFINED BY THE D.DO NOT PAINT OVER COLOR CODING OR ON EQUIPMENT MODEL NUMBERS. 11. GENERAL CONTRACTOR SHALL COORDINATE WORK AND SCHEDULE WORK ACTIVITIES WITH OTHER DISCIPLINES. RFDS.REFER TO ND-00246. 10. CONTRACTOR SHALL RECORD THE SERIAL#,SECTOR,AND POSITION OF EACH ACTUATOR INSTALLED AT THE ANTENNAS 6. ALL CABLES SHALL BE GROUNDED WITH COAXIAL CABLE GROUND KITS.FOLLOW THE 12. ERECTION SHALL BE DONE IN A WORKMANLIKE MANNER BY COMPETENT EXPERIENCED WORKMAN IN ACCORDANCE WITH AND PROVIDE THE INFORMATION TO AT&T. APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE.ALL MEMBERS SHALL BE LAID PLUMB AND TRUE AS INDICATED ON MANUFACTURER'S RECOMMENDATIONS. THE DRAWINGS. TORQUE REQUIREMENTS A.GROUNDING AT THE ANTENNA LEVEL. 13. SEAL PENETRATIONS THROUGH FIRE RATED AREAS WITH UL LISTED MATERIALS APPROVED BY LOCAL JURISDICTION. 1. ALL RF CONNECTIONS SHALL BE TIGHTENED BY A TORQUE WRENCH. B.GROUNDING AT MID LEVEL,TOWERS WHICH ARE OVER 200'-0",ADDITIONAL CABLE GROUNDING REQUIRED. CONTRACTOR SHALL KEEP AREA CLEAN,HAZARD FREE,AND DISPOSE OF ALL DEBRIS. 2. ALL RF CONNECTIONS,GROUNDING HARDWARE AND ANTENNA HARDWARE SHALL HAVE A TORQUE MARK INSTALLED IN A C.GROUNDING AT BASE OF TOWER PRIOR TO TURNING HORIZONTAL. CONTINUOUS STRAIGHT LINE FROM BOTH SIDES OF THE CONNECTION. D.GROUNDING OUTSIDE THE EQUIPMENT SHELTER AT ENTRY PORT. 14. WORK PREVIOUSLY COMPLETED IS REPRESENTED BY LIGHT SHADED LINES AND NOTES.THE SCOPE OF WORK FOR THIS A.RF CONNECTION BOTH SIDES OF THE CONNECTOR. PLANS PREPARED BY: PROJECT IS REPRESENTED BY DARK SHADED LINES AND NOTES.CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR E.GROUNDING INSIDE THE EQUIPMENT SHELTER AT THE ENTRY PORT. OF ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO BEGINNING CONSTRUCTION. B.GROUNDING AND ANTENNA HARDWARE ON THE NUT SIDE STARTING FROM THE THREADS TO THE SOLID SURFACE. EXAMPLE OF SOLID SURFACE:GROUND BAR,ANTENNA BRACKET METAL. <> CENTERLINE 7. ALL PROPOSED GROUND BAR DOWNLEADS ARE TO BE TERMINATED TO THE EXISTING ADJACENT GROUND 15. CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER 48 HOURS PRIOR TO COMMENCEMENT 3. ALL 8M ANTENNA HARDWARE SHALL BE TIGHTENED TO 9 LB-FT(12 NM). BAR DOWNLEADS A MINIMUM DISTANCE OF 4'-0"BELOW GROUND BAR.TERMINATIONS MAY BE EXOTHERMIC 5 O L U T O N S OF WORK. 4. ALL 12M ANTENNA HARDWARE SHALL BE TIGHTENED TO 43 LB-FT(58 NM). 16. THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS,PAVEMENTS,CURBS,LANDSCAPING AND STRUCTURES.ANY 5. ALL GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING OR COMPRESSION. Advancing Wireless Networks DAMAGED PART SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER. HARDWARE IS NO LONGER LOOSE. 16360 TABLE MOUNTAIN PARKWAY 6. ALL DIN TYPE CONNECTIONS SHALL BE TIGHTENED TO 18-22 LB-FT(24.4-29.8 NM). 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ANTENNA AND THE COAX CONFIGURATION IS 17. THE CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. 7. ALL N TYPE CONNECTIONS SHALL BE TIGHTENED TO 15-20 LB-IN(1.7-2.3 NM). THE CORRECT MAKE AND MODELS,PRIOR TO INSTALLATION. Golden,CO 80403 303-993-3293 18. GENERAL CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO THE SITE 9. ALL CONNECTIONS FOR HANGERS,SUPPORTS,BRACING,ETC.SHALL BE INSTALLED PER TOWER W W W.CENTERLINESOLUTIONS.COM AND/OR BUILDING. FIBER&POWER CABLE MOUNTING 8. THE FIBER OPTIC TRUNK CABLES SHALL BE INSTALLED INTO CONDUITS,CHANNEL CABLE TRAYS,OR CABLE TRAY.WHEN MANUFACTURER'S SPECIFICATION&RECOMMENDATIONS. 19. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF CONSTRUCTION INSTALLING FIBER OPTIC TRUNK CABLES INTO A CABLE TRAY SYSTEM,THEY SHALL BE INSTALLED INTO AN INTER DUCT LICENSURE NO: UNTIL JOB COMPLETION. AND A PARTITION BARRIER SHALL BE INSTALLED BETWEEN THE 600 VOLT CABLES AND THE INTER DUCT IN ORDER TO 10. ANTENNA CONTRACTOR SHALL FURNISH AND INSTALL A 12'-0"T-BOOM SECTOR ANTENNA MOUNT,IF SEGREGATE AND SECURELY FASTENED TLE TYPES. OPTIC THEIBER CABLE TUNK CABLES SHALL HAVE TRAY SYSTEM.NFPA 70(NEC)ARTICLE7707 0BLE RULES SHALL APPLY. (6)SIX FEET APPLICABLE,INCLUDING ALL HARDWARE. �A.. -yr',1 20. THE GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL REVISIONS, (C],A Lice ADDENDA,AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES. 9. THE TYPE TC-ER CABLES SHALL BE INSTALLED INTO CONDUITS,CHANNEL CABLE TRAYS,OR CABLE TRAY AND SHALL BE `O .•••*••. (Y I. SECURED AT INTERVALS NOT EXCEEDING(6)SIX FEET.AN EXCEPTION;WHERE TYPE TC-ER CABLES ARE NOT SUBJECT ' V.• • 21. THE GENERAL CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A OT SCO • �,,SR JA4. •C�'� 1 TO PHYSICAL DAMAGE,CABLES SHALL BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS,CHANNEL CABLE V • ■ 2-A:10-B:C AND SHALL BE WITHIN 25 FEET OF TRAVEL DISTANCE TO ALL PORTIONS OF WHERE THE WORK IS BEING TRAYS,OR CABLE TRAY WHICH ARE SERVING UTILIZATION EQUIPMENT OR DEVICES,A DISTANCE(6)SIX FEET SHALL NOT i �Q it • +f COMPLETED DURING CONSTRUCTION. BE EXCEEDED WITHOUT CONTINUOUS SUPPORTING.NFPA 70(NEC)ARTICLES 336 AND 392 RULES SHALL APPLY. 1+% �S �0 4/ 1) 22. ALL EXISTING ACTIVE SEWER,WATER,GAS,ELECTRIC,AND OTHER UTILITIES SHALL BE PROTECTED AT ALL TIMES,AND 10. WHEN INSTALLING OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS,NFPA 70(NEC)ARTICLE 300 :Y a 4, WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK,SHALL BE RELOCATED AS DIRECTED BY THE ENGINEER RULES SHALL APPLY. d •x 34611 :-.4: 'ut AND RF.EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING OR DRILLING PIERS AROUND OR � � NEAR UTILITIES.CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE WORKING CREW.THIS SHALL INCLUDE BUT NOT COAXIAL CABLE NOTES ' .6 (ttv`.'� A BE LIMITED TO A)FALL PROTECTION,B)CONFINED SPACE,C)ELECTRICAL SAFETY,AND D)TRENCHING&EXCAVATION. 'iy //]]%• .... 4, 23. AALL EXISTING FT HE WORK, ACTIILEE REMOVED,WATER, CAPPED,ELECGEELECTRIC, D ORDTOTHER OTHERWISE WHWHICH D TE INTERFERERWITH THE WHICHWILLEXECUTION 1. CONOT NTRACTOR MUST FOLLOW AT&T DAS IDASNENUE CABLING REQUIREMENTS#ATT-790-202-019,ISSUE 3,PUBLISHED s�% j`e[1^•••.••;7; ..INTERFERE .- OF OFI THETTHE EXECUTION OWNER AND/OR OF LOCALHWOUTRK, ITI SS DIRECTED BY THE RESPONSIBLE ENGINEER,AND SUBJECT TO THE !1''ti ��` 1 2. TYPES AND SIZES OF THE ANTENNA CABLE ARE BASED ON ESTIMATED LENGTHS.PRIOR TO ORDERING CABLE, 24. THE AREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER,EQUIPMENT OR CONTRACTOR SHALL VERIFY ACTUAL LENGTH BASED ON CONSTRUCTION LAYOUT AND NOTIFY THE PROJECT MANAGER IF 08/30/2016 DRIVEWAY,SHALL BE GRADED TO A UNIFORM SLOPE,AND STABILIZED TO PREVENT EROSION. ACTUAL LENGTHS EXCEED ESTIMATED LENGTHS. ALL SCALES ARE SET FOR 24'k36"SHEET 25. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE EXISTING SITE DURING CONSTRUCTION.EROSION CONTROL 3. CONTRACTOR SHALL CONFIRM COAX COLOR CODING PRIOR TO CONSTRUCTION.REFER TO"ANTENNA SYSTEM LABELING DRAWN BY: CHK BY: APV BY: MEASURES,IF REQUIRED DURING CONSTRUCTION,SHALL BE IN CONFORMANCE WITH THE FEDERAL AND LOCAL STANDARD"ND-00027 LATEST VERSION. JURISDICTION FOR EROSION AND SEDIMENT CONTROL. JND SL KS 26. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUNDING.FROZEN MATERIALS,SNOW OR ICE SHALL 4. ALL JUMPERS TO THE ANTENNAS FROM THE MAIN TRANSMISSION LINE SHALL BE 1/2"DIA.LDF AND SHALL NOT EXCEED NOT BE PLACED IN ANY FILL OR EMBANKMENT. 27. THE SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT STANDARD 5. ALL COAXIAL CABLE SHALL BE SECURED TO THE DESIGNED SUPPORT STRUCTURE,IN AN APPROVED MANNER,AT ALL RDENSITYIN UNDER PAVEMENTAND STRUCTURES AND 80 PERCENT STANDARD PROCTOR DENSITY IN E-AN SPACE. DISTANCES NOT TO EXCEED 5'-0"OC. ���� ALL TRENCHES PUBLIC RIGHT OF WAY SHALL BE BACKFILLED WITH STANDARD FILL OR OTHER MATERIAL PRE-APPROVED BY THE LOCAL JURISDICTION. 6. CONTRACTOR SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS REGARDING BOTH THE INSTALLATION AND 28. ALL NECESSARY RUBBISH,STUMPS,DEBRIS,STICKS,STONES,AND OTHER REFUSE SHALL BE REMOVED FROM THE SITE GROUNDING OF ALL COAXIAL CABLES,CONNECTORS,ANTENNAS,AND ALL OTHER EQUIPMENT. AND DISPOSED OF IN A LAWFUL MANNER. 29. ALL BROCHURES,OPERATING AND MAINTENANCE MANUALS,CATALOGS,SHOP DRAWINGS,AND OTHER DOCUMENTS SHALL 7. CONTRACTOR SHALL WEATHERPROOF ALL ANTENNA CONNECTORS WITH SELF AMALGAMATING TAPE. BE TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND PRIOR TO PAYMENT. WEATHERPROOFING SHALL BE COMPLETED IN STRICT ACCORDANCE WITH AT&T STANDARDS. Sheet Number: 30. CONTRACTOR SHALL SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON COMPLETION 8. THE SECURING OF CABLING SHALL BE UTILIZED BY ONLY 9 PLY POLYESTER TWINE WILL BE USED TO SECURE CABLES OF PROJECT AND PRIOR TO FINAL PAYMENT. WITH THE EXCEPTION OF ETHERNET AND FIBER CABLES WITHIN THE CABINET OR VERTICAL RUNS DOWN RELAY RACKS. 31. CONTRACTOR SHALL LEAVE PREMISES IN A CLEAN CONDITION. VELCRO STRAPS CAN BE USED FOR THIS APPLICATION ONLY. 32. THE PROPOSED FACILITY WILL BE UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE,AND IS NOT 9. ALL CABLES ENTERING EQUIPMENT FRAMES/CABINETS SHALL BE SEPARATED BY A MINIMUM OF 2"(POWER,GROUNDING, FOR HUMAN HABITAT(NO HANDICAP ACCESS REQUIRED). ETHERNET,COAXIAL AND FIBER). GN1 33. OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION,APPROXIMATELY 2 TIMES PER MONTH,BY AT&T TECHNICIANS.