Loading...
HomeMy WebLinkAboutWoodings utility approval signatures.pdf 141, .. , UTILITY APPROVAL&VERIFICATION MOP This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer to Provide Lot Address Information: ��l Lot Address; cr4 ��1�('~M3 C�ubdivision: m � -C7 Lout: re---- Authorized Signature Comments Date QWEST 974-468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley samuel.tooley( gwest.com agie 5/ '/ö V XCEL HIGH PRESSURE GAS I 970.262.4076(tel) 970.468.1401(fax) Contact: Rich Sisneros richa rd.sisneros@xcelenergy.corn HOLY CROSS ENERGY 970.947.5471(tel) 970.945.4081 (fax) Contact: Diana Golis d g o l i s P h o l vc ross.co m XCEL Energy 970.262.4038(fax) 970.262.4024(tel) Contacts: Kit Bogert Kath ryn.Boge rt10)XCE LEN E D GY.com EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480(tel) 970.476.4089(fax) Contact: Fred Haslee fhasleenerwsd.orq • COMCAST CABLE • 970.418.8248(tel) 970.949.9138(fax) Contact: David Evans david evansCaceble.comcast.com NOTES: I.If the utility approval&verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3.These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before dinning in any public right-of-way or easement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separately. 4.The Developer is required and agrees to submit any revised drawings to the utilities for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within the comment area of this form). Developer's Signature Date F:\cdev\FORMS\Permits\PlanningORB\Utility Approval 08-28-07.doc Z d LSVOOOOOSL'ameey:94 '15l OS:9L *OOZ LZ AHWfOEM> ZL9O9S OL6 3H2iOH12i3/a'IIS 1SAMO 1,4O8d SILVERTHORNE HP Fax:19704681401 May 16 2008 18:44 P.02 UTILITY APPROVAL&VERIFICATION 'I11 0PVAII'' This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and a so to verify service availability and location for new construction and should be used in conjunction with preparing your utility Ilan and scheduling installations. A site plan, including grading plan,floor plan,and elevations,shall be submitted to the followin utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTI COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer tv Provide Lot Address Information: ,,��"" r f Lot Address: /6941, it- �/�--- Subdiyision:/rt* U��+^1 Lot#: f Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley sam u el.tooley@gwest.co m XCEL HIGH PRESSURE GAS 7 /t 970.262.4076(tel) /4ri4 e u .,7Lf—/L 970.468.1401 (fax).. MAY ' 6 2firm Contact: Rich Sisneros !1 _ /n"AllLr771c-V�-O.(.0. /Jo richard_sisnerostaxcelenergv.com _ iryl ije .rb y 1,s jjzo42.54-c HOLY CROSS ENERGY 970.947.5471(tel) 970.945.4081(fax) Contact: Diana Galls dgolisO holycross.com XCEL Energy 970.262.4038(fax) 970.262.4024(tel) • Contacts: Kit Bogert Kathryn.Bogert aXCELEN ERGY.com EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480(tel) 970.476.4089(fax) Contact: Fred Haslee fhaslee@erwsd.org COMCAST CABLE 970.418.8248(tel) 970,949.9138(fax) Contact: David Evans david evans@cable.comcast.com NOTES: l 1. if the utility approval&verification form has signatures from each of the utility companies,and no comments are m e directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town wi presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached I er to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant o resolve identified problems. 3.These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Departm t of Public Works at the Town of Vail, Utility locations must be obtained before digging in any public right-of-way or e sement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separately. 4.The Developer is required and agrees to submit any revised drawings to the utilities for re-approval&re-verification i gthe submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within th comment area of this form). Developer's Signature Date F:lcdev\FORMSIPermitslPlanning\DRB\Utility Approval_08-28-07.doc May. 23. 2008 7:30AM No. 0326 P. 1 ►.. UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification. • Authorized Signature Comments Date QW-EST 970.513.7189(tel) 970.384.0257(fax) 970.687.0722(cell) Contacts: Steve Waters swaters@gwest.com EXCEL HIGH PRESSURE GAS 970.262.4076(tel) 970.468.1401(fax) Contact:Rich Sisneros HOLY CROSS ELECTRIC 970.947.5425(tel) 970.945.4081(fax) Contact: Jeff Vroom jvroom@holycross.corn EXCEL ENERGY 970.262.4038(fax) Contacts: Kit Bogart 970.262.4024 • Katherine Bogert EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480(tel) 970.476.4089(fax) Contact: Fred Haslee fhaslee©erwsd.org COMCAST CABLE 970.468.2669 ext. 1100(tel) 970.468.2672(fax) Contact: Brad Dorcas b ra de ly_do rocas©uua b l e.com ca st.co rn NOTES: 1.If the utility approval&verification form has signatures from each of the utility companies,and no comments are made directly on the form,the Town will presume that there are no problems and the development can proceed. 2, If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3.These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail.Utility locations must be obtained before digging in any public right-of-way or easement within the Town of Vail. A_buildinp permit is not a Public Way permit and must be obtained separately. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within the comment area of this form). Developer's Signature Date F:\edev\FORMS\Permits\Planning\DRB\drb_minor alt fl-23-20o5.doc Page 8 of 13 11/23/2005 May. 21. 200$ 7:49AM Pdo. 2728 P. 1 UTILITY APPROVAL&VERIFICATION t" OF hiL This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to • verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling Installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted to the following utilitigs for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer to Provide Lot Address.nformeltFonn;, Lot Address:, ,41,q" AAt 1.RJ\ tr.+<( Subdivision: Lot#: Authorized Signature Comments date QW EST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley Samuel.to o leyO Owes t.co m XCEL HIGH PRESSURE GAS 970.262.4076(tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisnero5.. xcelenergy.com HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diana Galls dgolls@holycross.com XCEL Energy 970.262.4038(fax) 970.2614024(tel) Contacts: Kit Bogert • l Kathryn.Bayert@XCELENERGY.coi:yr�/.LLati 0 :����.�'.i ' 61C9i / •t EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480(tel) 970.476.4089(fax) Contact: Fred Haslee fhasiee@erwsd.orq _ COMCAST CABLE 970,418,8248(tel) 970.949.9138(fax) • Contact: David Evans david a ns(a)cable.comcast.com J'OTESI 1. If the utility approval &verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the Form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3.These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail.Utilitylocations must be obtained before digging in any public right-of-way or easement within the Town of Vali. A bulldinn_nerma is not a Public Way permit and must be obtained separately. 4.The Developer is required and agrees to submit any revised drawings to the utilities for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within the comment area of this form). • Developer's Signature Date F:lcdev\FORMS1PermilstPlanning\D Rf3lUUlfty Approvai_08-28-07.doc Ice 94 /---1a, aicuft,v4ervu Viilexr, UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,including grading plan,floor plan,and elevations, shall be submitted to the following utilities for approval and verification. Authorized Signature Comments Date QWEST 970.513.7189 (tel) 970.384.0257(fax) 970.687.0722 (cell) Contacts: Steve Waters swaters@gwest.com EXCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros HOLY CROSS ELECTRIC 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom jyroom@holycross.com EXCEL ENERGY 970.262.4038(fax) Contacts: Kit Bogart 970.262.4024 Katherine Bogert EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480(tel) 970.476.4089(fax) Contact: Fred Haslee fhaslee@erwsd.org S-ai -0g COMCAST CABLE 92a4(1.- Adlt 970.468.2669 ext. 1100(tel) 970.468.2672(fax) Contact: Brad Dorcas brsasiely dorcas_@cakzletcarncast.corn NOTES;, 1.If the utility approval&verification form has signatures from each of the utility companies,and no comments are made directly on the form,the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3.These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right-of-way or easement within the Town of Vail. A building permit is not a Public Way Hermit and must be obtained separately. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within the comment area of this form), Developer's Signature Date F:\cdev\FORMS\Permits\Planning\DRB\drb_minor_aCt11-23-2005.doc Page 8 of 13 11/23/2005 UTILITY APPROVAL&VERIFICATION aARTYAQ�I' • This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and Should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer to Provide Lot Address Information: rC on: f j Lot Address: 1('qt/ 14 oil l Di Arkin 4 Subdivision:,, It '� Lt_ Lot ! / Authorized Signature Comments Date • QW EST 970.468.6660(tel) 970.468.0672(fax) Contacts: Sam Tooley samuettoaleyOgwest-com i XCEL HIGH PRESSURE GAS 970.262A076(tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisneros(alxcelenergy.cpm HOLY CROSS ENERGY 970.9475471(tel) 970.945.4081(fax) Contact: Diana Coils _c dapllslholvcross.com__.. XCEL Energy 970.262.4038(fax) 970.262.4024(tel) Contacts: Kit Bogert Kathrvn.Bogert0XCELENERGY.com EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089(fax) Contact: Fred Haslet fliasleesv d-orq i COMCAST CABLE 970.418.8248(tel) 970.949.9138(fax) Contact: David Evans --1144)\ i l4/\ t/" vdaidevnsacabcam asco NOTES: 1.If the utility approval&verification form has signatures from each of the utility companies,and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it Is the responsibility of the utility company and the applicant to resolve identified problems. 3.These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locattons must be obtained before digging in any public right-of-way or easement within the Town of Vail. A.IjjiIdinn permit is_ of a"Public Wav permit and must be obtained separately. 4.The Developer is required and agrees to submit any revised drawings to the utilities for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within the comment area of this form). Developer's Signature Date FAcdCv3FORMStPermilshrlanning1DRBlUtility A ppraval 0$-2$-07.doo I. ZOO/TOOM aUHV0 ysv'wO3 90z>rGz60L6 xtr3 sz :6 Iia 8002/9Z/GO