A15-0012_A15-0012 Comment Letter_1446057600.pdf
BCER on ni/nq- SUBMITTAL TRANSMITTAL TO: Jeff Mapp DATE: October 7,2015 OZ Architecture REFERENCE: Strata-Vail BCER PROJECT#: 21111028 E-Mail: jmapp@ozarch.com SUBMITTAL NO. 16721-010-R2 E c o cu u GJ Ce L L cu y U N G1 u vii cu Date In Date Out Submittals&Tag# Section Manufacturer .5 .cu .5 z 09/18/15 10/07/15 Resubmittal Fire Alarm System 16721 EST X These are transmitted as indicated below: CHECKED AS NOTED(See Submittals) X CHECKED AS NOTED(See Comments below) SUBMITTAL REVIEW COMMENTS: 1. Sheet F2.07B— Remove heat detectors from top of elevator shaft W-1 and W-2. Sprinkler plans do not show any heads serving shaft. 2. Coordinate with Architect all final device locations for rooms. Signed: Todd Brand jsmith :\21111028\ca\ca fire protection\16721-02-r1-fire alarm system\16721-02-r2-resubmittal 2-fire alarm conduit system-20150406.doc ARVADA OFFICE BCERGROUP COLORADO SPRINGS OFFICE 5420 WARD ROAD,SUITE 200 / l� /00 i4�ifiei 10807 NEW ALLEGIANCE DRIVE,SUITE 400 ARVADA,COLORADO 80002 D COLORADO SPRINGS,COLORADO 80921 303.422.7400 719.533.1112 40) PCL Construction Services Inc. .New Submittal Submittal Cover Sheet Date: 9/14/2015 Resubmittal Project: Strata-Vail To: OZ Architecture From: PCL Construction Services,Inc. Submittal No: 16721-01-R2 3003 Larimer Street 953 S Frontage Rd West Contractor Project No:5001410 Denver,CO 80205 Suite 302 Vail,CO 81657 Previous Submittal No: 16721-01-R1 SPECIFICATION SECTION NO.&DESCRIPTION(Cover only one section with each submittal) 16721 - Fire Alarm System CONTRACT REF.DOCUMENT PRIORITY STATUS CODES ACTION TAKEN Description of Item Submitted A-Immediate Response A-Approved Spec Paragraph Drawing Sheet Item (Type,size,model number,etc.) Submittal Type B-Respond within 7 days B-Approved as Noted Number Number C-Respond within 10 days C-Revise and Resubmit a. b. c. e. f D-Not Approved 1 Shop Drawings-Fire Alarm System Action 1.3.A.21/1.6.F A 2 Equipment List Action 1.6.0 A 3 Product Data-Fire Alarm Control Equipment,Annunciators Action 1.6.C.1 A 4 Product Data-smoke management control equipment Action 1.6.C.10 A 5 Product Data-Voice Evacuation and Firefighter's Action 1.6.C.2 A 6 Product Data-Manual Fire Alarm Stations,Detectors, Action 1.6.C.3 A 7 Product Data-Conduit,raceway,junction boxes,terminal Action 1.6.C.4 A 8 Product Data-wire,cable,connectors,terminal strips, Action 1.6.C.5 A 9 Product Data-smoke detectors,monitor modules,control Action 1.6.C.6 A 10 Product Data-un-interruptible power supplies,standby Action 1.6.C.7 A 11 Product Data-other materials,device,equipment to be Action 1.6.C.8 A 12 Product Data-fire alarm schematic riser diagram Action 1.6.C.9 A CONTRACTOR REMARKS: A/E REMARKS: Please see attached PCL Submittal Review Notes Page. CONTRACTOR'S CERTIFICATION: I certify that the above submitted items have been reviewed in detail,are correct,and in general conformance with the Contract Drawings and Specifications except as otherwise noted. NAME AND SIGNATURE OF CONTRACTOR REPRESENTATIVE: NAME AND SIGNATURE OF REVIEWING AUTHORITY: Date: Ben Thomas ---- *P1 CONSTRUCTION LEADERS PCL Initial Submittal Review Notes Strata - Vail PCL Project No. 5001410 Subcontractor: Ludvik Electric Submittal#: 16721-01-R2 Date: 9/14/15 Revisions: Revision Dates: 16721-01-R2 9/14/15 16721-01-R1 6/1/15 16721-02-R1 4/6/15 16721-02 2/25/15 16721-01 2/4/15 Specification Section: 16721 —Fire Alarm System Item Description: Fire Alarm Shop Drawings & Product Data Action: Variance Request (Y/N): Y If so,why?: Commscope is not a specified manufacturer. Notes: Use of Omnicable and Southwire and cable in lieu of the specified manufacturers in 16421.2.2.B.2 was approved in the review comments of submittal 16721-02. PCL CONSTRUCTION SERVICES, INC. 953 S.FRONTAGE RD WEST,SUITE 302,VAIL,COLORADO 81652 TELEPHONE:(970)470-6044 STRATA VAIL LUDVIK ELECTRIC CO. JOB #3340 FIRE ALARM SHOPS/PRODUCT DATA SPECIFICATION SECTION #16721 SUBMITTAL #28.18.04 September 14, 2015 STRATA VAIL LE JOB #3340 September 14, 2015 GENERAL CONTRACTOR: PCL CONSTRUCTION SERVICES 2000 SOUTH COLORADO BLVD STE 2-500 DENVER, CO 80222 ENGINEER: BCER ENGINEERING 5420 WARD ROAD, SUITE 200 ARVADA, CO 80002 ARCHITECT: OZ ARCHITECTURE OF DENVER 3003 LARIMER STREET DENVER, CO 80205 SUBMITTAL #28.18.04 FIRE ALARM SHOPS/PRODUCT DATA SPECIFICATION SECTION #16721 STRATA VAIL LUDVIK ELECTRIC CO. SUBMITTAL #28.18.04 REVIEW AND ACTION RECORD LUDVIK ELECTRIC CO. PCL CONSTRUCTION SERVICES Review of the enclosed is for general conformance to the Project Specifications and Plans and does not relieve the vendor of the requirements set forth under the Contract Documents and Contract. Conduit fill percentages on L1-L7 are given for the riser conduits as agreed to with BCER in a meeting on 4/21/15. Please see page 9 for responses to review comments 9/14/15 OS-e/, V-4--'-- BCER ENGINEERING OZ ARCHITECTURE OF DENVER, INC. STRATA VAIL 100% CONSTRUCTION DOCUMENTS VAIL, CO DECEMBER 20, 2013 SUBS11TU11 O N REQ UEST To: BCER / OZ Architecture PROJECT: Strata Vail SPECIFIED ITEM: 16721 13 2 . 2 .B. 2 Wire and Cable Section Page Paragraph Description The undersigned requests consideration of the following: PROPOSED SUBSTITUTION: Omnicable manufacturer for cable See pages 221 . REASON FOR REQUESTING SUBSTITUTION used equal for specified cable manufacturer Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified. Attached data also includes a detailed description of changes to the Contract Documents which the proposed substitution will require for its proper installation. The undersigned certifies that the following paragraphs, unless modified by attachments,are correct: 1. The proposed substitution does not affect dimensions shown on Drawings. 2. The undersigned will pay for changes to the building design, including engineering design, detailing, and construction costs caused by the requested substitution. 3. The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty requirements. 4. Maintenance and service parts will be locally available for the proposed substitution. The undersigned further states that the function, appearance,and quality of the proposed substitution are equivalent or superior to the specified item. Submitted by: Ben Thomas Signature f1 � z--- For Use by the design consultant Firm Ludvik Electric [ ]Accepted [ ]Accepted as noted Address 3900 S . Teller [ ] Not Accepted [ ] Received too late Lakewood, CO 80238 By — Date 2/4/15 Date Telephone 303-781-9601 Remarks Attachments: PRODUCT REQUIREMENTS 01600 - 9 ©OZ Architecture Denver, CO STRATA VAIL 100% CONSTRUCTION DOCUMENTS VAIL, CO DECEMBER 20, 2013 SUBS11TU11 O N REQ UEST To: BCER / OZ Architecture PROJECT: Strata Vail SPECIFIED ITEM: 16721 13 2 . 2 .B. 2 Wire and Cable Section Page Paragraph Description The undersigned requests consideration of the following: PROPOSED SUBSTITUTION: Southwire manufacturer for wire . See pages 225-229 . REASON FOR REQUESTING SUBSTITUTION:Commonly used equal for specified wire manufacturer Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified. Attached data also includes a detailed description of changes to the Contract Documents which the proposed substitution will require for its proper installation. The undersigned certifies that the following paragraphs, unless modified by attachments,are correct: 1. The proposed substitution does not affect dimensions shown on Drawings. 2. The undersigned will pay for changes to the building design, including engineering design, detailing, and construction costs caused by the requested substitution. 3. The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty requirements. 4. Maintenance and service parts will be locally available for the proposed substitution. The undersigned further states that the function, appearance,and quality of the proposed substitution are equivalent or superior to the specified item. Submitted by: Ben Thomas Signature For Use by the design consultant Firm Ludvik Electric [ ]Accepted [ ]Accepted as noted Address 3900 S . Teller [ ] Not Accepted [ ] Received too late Lakewood, CO 80238 By — Date 2/4/15 Date Telephone 303-781-9601 Remarks Attachments: PRODUCT REQUIREMENTS 01600 - 9 ©OZ Architecture Denver, CO STRATA VAIL 100% CONSTRUCTION DOCUMENTS VAIL, CO DECEMBER 20, 2013 SUBS11TU11 O N REQ UEST To: BCER / OZ Architecture PROJECT: Strata Vail SPECIFIED ITEM: 16721 13 2 . 2 .B. 2 Wire and Cable Section Page Paragraph Description The undersigned requests consideration of the following: PROPOSED SUBSTITUTION: Commscope manufacturer for wire . See pages 222 . REASON FOR REQUESTING SUBSTITUTION:Commonly used equal for specified wire manufacturer Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified. Attached data also includes a detailed description of changes to the Contract Documents which the proposed substitution will require for its proper installation. The undersigned certifies that the following paragraphs, unless modified by attachments,are correct: 1. The proposed substitution does not affect dimensions shown on Drawings. 2. The undersigned will pay for changes to the building design, including engineering design, detailing, and construction costs caused by the requested substitution. 3. The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty requirements. 4. Maintenance and service parts will be locally available for the proposed substitution. The undersigned further states that the function, appearance,and quality of the proposed substitution are equivalent or superior to the specified item. Submitted by: Ben Thomas Signature For Use by the design consultant Firm Ludvik Electric [ ]Accepted [ ]Accepted as noted Address 3900 S . Teller [ ] Not Accepted [ ] Received too late Lakewood, CO 80238 By — Date 9/14/15 Date Telephone 303-968-7484 Remarks Attachments: PRODUCT REQUIREMENTS 01600 - 9 ©OZ Architecture Denver, CO 800 E.Goth Avenue 417 $T /# Denver CO 80229 m . �4O�1� Phone: 303-298-7900 Fax: 303-550-5657 Louis Archuleta September 10,2015 BCER Group 5420 Ward Road,Suite 200 Arvada,Colorado 80002 RE:Strata—Vail Response to Review Comments of Fire Alarm Drawings Submittal 16721-01-R1 1. Sheet F2.P2A, elevator pit E-3 shows no heat or smoke detection devices along with no tamper and flow switches. Correction required. Response: A heat detector has been added in E-3 Pit and Tamper Switch with monitor module has been added. The current sprinkler drawings do not indicate a Flow Switch will be present. 2. Sheet F2.P1A is showing a manual pull station shown near stairwell Northeast EP111. There is a door nearby leading into a janitor room but not into the stairwell, if that is the case no pull station is needed at this location. Verify if background is accurate and correct accordingly. Response: The door in question is the entrance to North East Stairwell. I cleaned up the background to make this clearer to see. 3. Sheet F2.P1A, elevator E-3 has a misplaced heat detection device(see Sheet F2.P2A comment). Correction required. Response: The heat detector and monitor module have been removed. 4. Sheet F2.02A,trash room E218 requires smoke detection device. Correction required. Response: A smoke detector has been added to room E218. 5. Sheet F2.02A and Sheet F2.03A, rooms E201, E301 respectively, need combination smoke/CO detector to be moved closer to center of room to provide coverage near kitchen cooking appliances. Revise to meet device coverage requirements per specification sheet 16721-02,fire alarm device location and spacing per NFPA 72, including Town of Vail (TOV)amendments,standards, manufacturer's recommendations and Underwriters Laboratories Inc. (UL) listings. Response: The smoke/CO detector in E201 and E301 have been relocated to the center of the living room/kitchen space. 6. Sheet F2.03B(see image below), F2.04B, F2.05B, F2.06B,and F2.07B shows visible notification device in corridor W318,W418,W518,W618, and W718 respectively, falling short of the 15 feet end of corridor distance requirement per 2010 NFPA 72 Section 18.5.4.4.5. Correction required. Response: I don't agree with the measurement being made from the outside corner of the corridor junction. But I have relocated the notification devices as requested. 7. Sheet F2.06A,elevator E2 and El showing speakers and no heat detection. Correction required. Response: The speakers in elevator cabs have been removed. No heat detectors have been added,sprinkler drawings indicate the shaft are not sprinklered. 8. Sheet F2.06B, heat exchanger room W619 require a smoke detection device. Correction required. Response: A smoke detector has been added to room W619. www . fassysternsgroup . net 800 E.Goth Avenue 417 $T /# Denver CO 80229 m . �4O�1� Phone: 303-298-7900 Fax: 303-550-5657 9. Sheet F2.07B,elevators W1 and W2 is showing speaker devices. Speakers not required in elevator. Correction required. Response:The speakers in elevator cabs have been removed. No heat detectors have been added,sprinkler drawings indicate the shaft are not sprinklered. 10. Sheet F2.07B,trash room W714 requires a smoke detection device. Correction required. Response:A smoke detector has been added to room W714. 11. Per the project specifications 16721-02 conduit fill calculations need to be conducted. A maximum of 40 percent fill is allowed. This information is only provided on Levels P3—P1 Conduit Drawing Sheets. Provide missing percent fill on remaining Conduit Drawing Sheets, Levels 1-7. Response: Conduit fill percentages have been added to all risers Levels 1—7. 12. In general,elevator lobbies are showing smoke detectors and visible notification devices overlapping on drawings. Advise moving one or both to improve legibility of device placement. Response: The overlap of device symbols occurs on Level P1—P3. The placement of these devices is based on direction from the Architect in previous drawing review. REVIEW COMMENTS ON THE DRAWINGS 13. Sheet F2.01A. Note indicates relocating the Front Desk Annunciator. Response: Relocated Annunciator to wall indicated. 14. Sheet F2.03A Conduit Drawing. Note Corridor E316—Avoid Horn Strobe adjacent to Unit entry. Response: Moved Speaker/Strobe 3B-01-04 and -Speaker/Strobe 3B-01-03 approx.4'South in Corridor E316, E416,and E516. 15. Sheet F2.03A Conduit Drawing. Note refers to relocating Speaker/Strobe locations within Unit E304 and E304 Lockoff bedrooms. The note states"General comments on location shall apply throughout". Response: Speaker/Strobes have not been moved in this revision. Relocation must be indicated per device,global changes will not be attempted. Any bedroom notification device relocated must meet the following criteria; a. Within 16 feet of the furthest pillow edge (line of sight) b. Must not be located below a soffit less than 8'-10" (106") Please note the Speaker/Strobes are only 5"wide 6.5"tall,the symbol used on the drawings is not to scale. Jim Arnold Engineering Manager Systems Group 303-298-7900 www . fassysternsgroup . net