Loading...
HomeMy WebLinkAboutB14-0224_A0-0_1415134560.pdf *IA 1,4 project olataproject ternindex to brawires ; A I I I,Isos Structural Architect: �'1e.: Contractor: ,4rchitectura I �rawin�seg Fierce + Frye Architects 40.0 Cover Sheet will 1*k PROJECT PHYSICAL ADDRESS: P.O. Box 6836 Monroe & Newell Engineers, Inc. Survey 263 East Gore Creek Drive, Vail, Colorado 10 Benchmark Rd. STE. 204 Aspen Constructors, Inc. 'j Shipping: 30 Benchmark Rd., 309 AABC, Unit G EX-1 Existing Floor Plans - All Levels / I� Suite 216 Avon, CO 51620 41.0 Code Site Plan ojlao) *&I Avon, CO,PARCEL NUMBER: Phone: 970-949-1168 Aspen, Colorado 51611 2101-082-29-003 Phone: 910-949-0599 51620 Fax: 970-949-4054 T 0.925.1608 41.1 Code Data LEGAL DESCRIPTION: Fax: 910-949-0933 Contact: Hannes Spaeh F 9 0.925.2791 41.2 Code Data Plan Contact: Tom Frye Contact: Wally Sheata 41.3 Wall Types 4 Door Schedule 11/04/14 Town of Vail, Title 12 Email: tfryeeresortdesign.com 43.0 Lower Level Floor Plan Zone District: Commercial Core I 43.1 Street Level Floor Plan SITE COVERAGE AND GRFA SUMMARY: 43.2 Upper Level Floor Plan No change not applicable. Owner: 5u lol �,rl Dept.: M.E.P.: 433 Clock Tower and Loft Plans r 1 L 1 \ V The Gorsuch Family Town of Vail Rader Engineering 44.0 Roof Plan + FRYE 40650 Highway 6, Suite E-1 45.0 Exterior Elevations CODE INFORMATION: 263 E Gore Creek Drive TS S. Frontage Road Avon, CO 51620 46.0 Enlarged Restroom Plans and Elevations Refer to code data sheets ALO-A1.2 for code information. Vail, CO 51657 P.O. Box 5610 46.1 Enlarged Elevator Plans Phone: 970.476.2294 Vail, CO 81651 g ARCHITECTS Avon, CO 81620 46.2 Elevator Section AUTOMATIC FIRE SUPPRESSION SYSTEM: Phone: 970-479-2100 Phone: 970-845-7910 410.0 Lower Level Reflected Ceiling/Electrical/Lighting Plan Type NEPA 13 to de installed throughout existing building and new areas. Fax: 5�0-845- 522 410.1 Street Level Reflected Ceiling/Electrical/Lighting Plan 410.2 Upper Level Reflected Ceiling/Electrical/Lighting Plan San Francisco Office Tel: 415.392.4433 Town Of Vail Building Codes: Structural 1�raWJ19S Truckee Office Structural Design Criteria: 53.0 Foundation and Lower Level Framing Plan Tel: 530.214.0899 53.1 Street Level Framing Plan Vail Office Roof Snow Load: SO FSF for roofs 4:12 or greater slope 53.2 Upper Level FramingPlan Seismic: Short period spectral response: Ss =035.0 pp Tel: 970.949.0899 100 PSF for decks and roofs less than 4:12 53.3 Roof Framing Plan Long period spectral response: SI. 008.1 11 . 11 54.0 Foundation Details and General Notes nfo@PierceFrye.com Wind Speed: 90 mph (3 second gust), exposure B 54.1 Framing Details 4 Site Class: determined by soils report 4ors �� ��� Frost Depth: 48" 55.1 Framing Details Ground Snow Load 145 PSF Adopted Codes Standards: 1 0:: an l ca I ra UJ rig s M0.0 Cover Sheet 2012 International Building Code M1.0 Mechanical Schedules 2012 International Residential Code Vail, 2012 International Plumbing Code M2.0 Lower Level Mechanical Plan 2012 International Mechanical Code M2.1 Street Level Mechanical Plan 2012 International Fuel Gas Code ,. p ® M2.2 Upper Level Mechanical Plan 2012 International Fire Code 2012 International Energy Conservation Code e e M3.0 Mechanical Schematics 2011 National Electrical Code 8 o M3.1 Mechanical Specs and Sequene of Operations 2005 ICC/ANSI A111.1 (Accessibility Standards) 2012 Amendments located in Ordinance No. 18, Series 2009 CIIIIIJ� ' E 1 ectr I ca I CD Iia w re S l cu co co .11...1...ummi..1..,.- '■■\ _ ELO Cover Sheet = L- 0 imanme .�-• ■ E2.1 Electrical Demo Plan - Main Level /��, J ■■■ E3.0 Electrical Power Plan - Lower Level U - ■I ■■■ ,�-e ; U • En �� Ulllllllllllllli ■■■ E3.1 Electrical Power Plan - Street Level ( ) 'r ����I Op- � . �,�,����ttl ���'�'�����II � � I II II s H I mum mmmIll II H ii E3.2 Electrical Power Plan - 2nd Level .I�L��I AM .1.1� -m1mnnm�m� ; ■■ ■■■ E4.0 Electrical Lighting Plan - Lower Level Cl.) j i, �� , MM tr,400 ■■ ■■■ P4.1 Electrical Lighting Plan - Street Level 04) Juno . - . 0 0 ` ` ` ` ` ` ` ` ������� '�� Int\•I�t�I�t�I�t�I�t���t, �4.._4w.IV,ii...+:� E4.2 Electrical Lighting Plan - 2nd Level E5.0 Electrical One-Line Diagram 5.1 Electrical Schedules '- 15U 0 02 abbreviations emere l notes •� L3 ABV ABOVE B.O.F. BOTTOM OF FOOTING DPR DAMPER FAB FABRICATE GL.B. GLASS BLOCK LAM LAMINATE(D) N.TS, NOT TO SCALE QTY. QUANTITY SPKR SPEAKER U.B.G. UNIFORM BUILDING CODE � A.F.F. ABOVE FINISHED FLOOR B.0.5. BOTTOM OF STEEL OR BOTTOM DP DAMPROOFING F.B. FACE BRICK GLU-LAM GLUE-LAMINATED TIMBER LAY LAVATORY NO, NUMBER Q.T. QUARRY TILE SPEC SPECIFICATION(5) U.M.C. UNIFORM MECHANICAL CODE IJJ A.S.G ABOVE SUSPENDED OF SLAB D.L. DEAD LOAD FaFACE OF Ge. GRAB BAR L.H. LEFT HAND SPG.PT SPRING POINT U.P.C. UNIFORM PLUMBING CODE I. ALL FIREPLACES TO MEET LOCAL AND STATE CODES INCLUDING ALL CEILING B.O.W. BOTTOM OF WALL DEG DEGREE F.O.C. FACE OF CONCRETE GR GRADE,GRADING L.H.R. LEFT HAND REVERSE SQ SQUARE U.O.N. UNLESS OTHERWISE NOTED ACCESSORIES, FIRE RATINGS, ETC. IN ADDITION, ALL FIREPLACES SI-TALL BE M AGG ACCESS B.T.U. BRITISH THERMAL UNIT DEM DEMOLISH,DEMOLITION F.O.F. FACE OF FINISH GF.R.C. GLASS FIBER REINFORCED L LENGTH OBS OBSCURE S.F, SQUARE FOOT(FEET) URN URINAL A.P. ACCESS PANEL BRZ BRONZE DMT DEMOUNTABLE F.O.M. FACE OF MASONRY CONCRETE LW LIGHTWEIGHT O.G. ON CENTER(5) RBT RABBET,REBATE ST.S STACKED STUDS INSTALLED IN STRICT ACCORDANCE TO MANUFACTURER'S SPECIFICATIONS AND CN AG ACOUSTICAL BLDG BUILDING D DEPTH,DEEP F.O.S. FACE OF STUDS GVL GRAVEL LWC LIGHTWEIGHT CONCRETE OPG OPENING RAD RADIUS S.S. STAINLESS STEEL INSTALLATION GUIDELINES. AC.T. ACOUSTICAL TILE B.U.R. BUILT UP ROOFING D.R.B. DESIGN REVIEW BOARD FAS FASTEN,FASTENER GRD GROUND LMST LIMESTONE O.JST. OPEN-WEB JOIST RR RAILROAD TIE(TIMBER) STD STANDARD ye. APOR BARRIER ACR. ACRYLIC PLASTIC DTL DETAIL FN.D. FEMININE NAPKIN DISPENSER RUC RAINWATER CONDUCTORV2. SEE ELEVATIONS FOR TOP OF WINDOW ROIUGH OPENING HEIGHTS. GT GROUT L.F. LINEAL FEET Opp OPPOSITE STA STATION VAR VARNISH ADD ADDENDUM DIAG DIAGONAL F.N.R. FEMININE NAPKIN RECEPTACLE GA GUAGE LNTL LINTEL °PHI. OPPOSITE NAND RCPT RECEPTACLE STL STEEL VNR VENEER 3. COORDINATE ALL MECHANICAL AND ELECTRICAL EQUIPMENT AND ACCESS ADN ADDITIONAL DIAM DIAMETER FN FENCERDWD REDWOOD GYP GYPSUM L.L. LIVE LOAD O.D. OUTSIDE DIAMETER RE: REFERENCE,REFER TO: ST STONE V.T.R. VENT THROUGH ROOF PANELS WITH ARCHITECT PRIOR TO INSTALLATION. ADN ADHESIVE GAB CABINET DIM DIMENSION FGL FIBERGLASS LVR LOUVER O.F.S.W. OUTSIDE FACE STUD WALL STOP STORAGE (V) VERIFY ADJ ADJACENT CAD CADMIUM DW DISHWASHER F.V. FIELD VERIFY RFL REFLECT(ED),(INE),(OR) 4. CONTRACTOR TO COORDINATE ALL MECHANICAL AND ELECTRICAL HBO HARDBOARD 0/0 OUT TO OUT S.D. STORM DRAIN v.IF. VERIFY IN FIELD ADJT ADJUSTABLE CANT CANTILEVER DIS DISPOSAL FIN FINISH(ED) REF REFRIGERATOR HDW HARDWARE MH MANHOLE OA OVERALL REG REGISTER STR STRUCTURAL VERT VERTICAL EQUIPMENT, DEVICES AND WORK. AGG AGGREGATE CPT CARPET(ED) Div DIVISION F.F. FINISHED FLOOR HWD HARDWOOD MPR MANUFACTURE(ER) ON OVERHANG,OYER-1E4P SUSP SUSPENDED V.S.J. VERTICAL SLIP JOINT A/C AIR CONDITIONING CSMT CASEMENT DR DOOR F.A. FIRE ALARM REINF REINFORCE CO),(ING) 5. PROVIDE RADON MITIGATION UNDER ALL SLABS IF REQUESTED BY OWNER. HD HEAD MRB MARBLE SYM SYMMETRY(ICAC) VEST VESTIBULE ALM ALARM C.I.P. CAST-IN-PLACE DBL DOUBLE F.BRK. FIRE BRICK R.G.P. REINFORCED CONCRETE PIPE NOR HEADER M.T. MARBLE TILE SYN SYNTHETIC VIN VINYL 6. SEE STRUCTURAL AND MEP DRAWINGS FOR MORE INFORMATION AND DETAILS. ALT ALTERNATE C.I. CAST IRON DA DOUBLEACTING FE. FIRE EXTINGUISHER R) REMOVE HTR HEATER MAS MASONRY SYS SYSTEM vL.B. VINYL BASE I. CONTRACTOR TO NOTIFY THE ARCHITECT ABOUT ANY CONDITIONS REQUIRING A AL ALUMINUM C.B. CATCH BASIN P.H. DOUBLE HUNG PSC. FIRE EXTINGUISHER CABINET (P) PAINT(ED) REQ'D REQUIRED HIG HEATING M.O. MASONRY OPENING V.C.T. VINYL COMPOSITION TILE RESIL RESILIENT A.G.I. AMERICAN CONCRETE (C) CAULK(ING) DT.A. DOVETAIL ANCHOR F.H.C. FIRE HOSE CABINET MAIL MATERIAL (5) PR PAIR V.F. VINYL FABRIC MODIFICATION OR CHANGE BEFORE PROCEEDING WITH THE WORK. H.v.A.C. HEATING/VENTILATING/AIRRET RETURN CONDITIONING MAXMAXIMUMV.T. VINYL TILE S. ALL CONSTRUCTION TO PROVIDE A WATERPROOF, WEATHER-TIGHT BUILDING. INSTITUTE CDR CEDAR DN DOWN FPL FIREPLACE P PANEL AIA AMERICAN INSTITUTE OF CLG CEILING DS DOWNSPOUT F.V.C. FIRE VALVE CABINET H.D. HEAVY DUTY MEcH MECHANICAL P.B. PANIC BAR R.A. RETURN AIR TKBD TACKBOARD V.W.C. VINYL WALL COVERING ARCHITECTS CEM CEMENT DRN DRAIN FP FIREPROOF HT HEIGHT M.C. MEDICINE CABINET P.I.D. EY REVERSE,REVISION D. PAPER TOWEL DISPENSER TEL TELEPHONE v.J. v-JOINT(ED) CONTRACTOR SHALL FLASH, CAULK AND SEAL AS NECESSARY TO ACHIEVE A.I.S.C. AMERICAN INSTITUTE OF cM CENTIMETER(5) DR.BD DRAINAGE BOARD F.R.T. FIRE-RESISTANT TREATEDH.C. HOLLOW MORE MED MEDIUM P.T.R. PAPER TOWEL RECEPTOR R.H. RIGHT HAND Tv TELEVISION PAR PARALLEL R.O.W. RIGHT OF WAY TEMP TEMPERED,TEMPERATURE THIS REQUIREMENT. STEEL CONSTRUCTION C.M.T. CERAMIC MOSAICETILE D.T. DRAIN TILE F.R.I. FIRE-RETARDANT H.M. HOLLOW METAL MBR MEMBER P.BD. PARTICLE BOARD R RISER T.C. TERRA GOTTA 5. TOILETS SHALL HAVE A MAXIMUM OF 1.6 GALLONS PER FLUSH. SHOWER HEAD Issue Date: A.N.S.I. AMERICAN NATIONAL STANDARDS G.T. CERAMIC TILE DWR DRAWER FIX FIXTURE MB MEMBRANE INSTITUTE CRAM CHAMFER N.S. HORIZONTAL R.D. ROOF DRAIN DWG DRAWING FLG FLASHING MTL METAL PIN PARTITION TZ TERRAZZO WSCT WAINSCOT H.B. HOSE 515 PNMT PAVEMENT RF.H. ROOF HATCH AND FAUCET FLOW SHALL NOT EXCEED 2.5 GALLONS PER MINUTE. ALL TUBS 06/16/2014 Building Permit A.S.TMH.W.H. HK THICK(NESS) W.H. WALL HUNG. AMERICAN SOCIETY FOR TESTING CHR CHROMIUM(PLATED) D.F.D. , DRINKING FOUNTAIN FLX FLEXIBLE H .H. HOT WATER HEATER MT.FR. METAL FURRING PED PEDESTAL RFM ROOMNG AND MATERIALS CIR CIRCLE D.W. DUMB WAITER FLR FLOOR(ING) M.R.D METAL ROOF DECKING TNR THRESHOLD WPR WALLPAPER SHALL HAVE A ONE-PIECE WELDED TRAP (NO ACCESS REQUIRED). l 07/10/2014 Building Permit Resubmit A.D.A. AMERICANS WITH DISABILITIES CIRC CIRCUMFERENCE FL.CO. FLOOR CLEANOUT M METER(5) PEND PENDANTT.P. TOILET PAPER HOLDER W.T.W. WALL TO WALL ACT CL. CLEAN OUT F.D. FLOOR DRAINEZ MEZZANINER.O. ROUGH OPENING 10. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE 10/03/2014 Building Permit Revision I.B.C.LB.G. INTERNATIONAL BUILDING CODE PERF PERFORATE (D) T.PTN, TOILET PARTITION W.C. WATER CLOSET A.W.G. AMERICAN WIRE GUAGE CLR CLEAR(ANCE) F/L FLOOR LINE I.M.G. INTERNATIONAL MECHANICAL CODE MM MILLIMETER(5) PER PERIMETER R.S. ROUGH SAWN TOL TOLERANCE WP WATERPROOFING SOIL'S REPORT. ANC ANCHOR,ANCHORAGE CLOS CLOSET F.PL. FLOOR PLATE I.P.G. INTERNATIONAL PLUMBING CODE MWK MILLWORK PH PHASE R.B. RUBBER BASE TBG TONGUE AND GROOVE W.R. WATER REPELLENT II. UNDER NO CIRCUMSTANCES SHALL DRAWINGS BE SCALED. A.B. ANCHOR BOLT GLS CLOSURE FLUOR FLUORESCENT I.R.C. INTERNATIONAL RESIDENTIAL CODE MIN MINIMUM PLS PLASTER R.T. RUBBER TILE T45 TOP AND BOTTOM WS WATERSTOP ANOD ANODIZED C.W. COLD WATER F.JT. FLUSH JOINT INCL INCLUDE(D),LING) MIR MIRROR PLAS PLASTIC T.O.B. TOP OF BEAM WT WEIGHT 12. FOR INSULATION VALUES REFER TO LOCAL MINIMUM CODE REQUIREMENTS. APPD APPROVED COL COLUMN EA. EACH FTG FOOTING INFO INFORMATION MISC MISCELLANEOUS P.LAM. PLASTIC LAMINATE T.O.G. TOP OF CONCRETE WWF. WELDED WIRE FABRIC l3• SITE RETAINING WALLS IN EXCESS OF 41 HIGH SHALL SE DESIGNED AND APP APPROXIMATE COMB COMBINATION E.F. EACH FACE FRG FORGED I.D. INSIDE DIAMETER MOD MODULAR PL PLATE SF.GL SAFETY GLASS T.O.D. TOP OF DRAIN WI-1.13. WHEEL BUMPER STAMPED BY A LICENSED ENGINEER. ARCH ARCHITECT(URAL) COMPT COMPARTMENT E.W. EACH WAY FDN FOUNDATION I.B.O. INSTALLED BY OTHERS MLD MOLDING P.G. PLATE GLASS SDST SANDSTONE T.OF TOP OF FOOTING W WIDTH,WIDE A.D. AREA DRAIN COMP COMPOSTION(COMPOSITE) ELEG ELECTRIC(AL) FR FRAME(D),(ING) INSUL INSULATE(D),(ION) MT MOUNT(ING) F/L PLATE LINE SCN SCREEN T.O.M. TOP OF MASONRY WDO WINDOW 14. A REVOCABLE RIGHT-OF-WAY PERMIT IS REQUIRED FOR ALL IMPROVEMENTS AUTO AUTOMATIC COMPR COMPRESS(ED),(ION),(ISLE) E.P. ELECTRICAL PANELSOARD FR.PR. FREEZE PROOF INT INTERIOR MTD MOUNTED PLY PLYWOOD (5) SEALANT T.O.PL. TOP OF PLATE W.G. WIRED GLASS AVG AVERAGE GONG CONCRETE E.W.C. ELECTRIC WATER COOLER FA. FRESH AIR INTM INTERMEDIATE MOV MOVABLE PKT POCKET STG SEATING T.O.PLY.TOP OF PLYWOOD W/ WITH WITHIN THE STREET RIGHT-OF-WAY. C.M.U. CONCRETE MASONRY UNIT EL ELEVATION F.I.O. FURNISHED AND INSTALLED INV INVERT(ED) MUL MULLION PT POINT SECT SECTION T.O.R. TOP OF RIDGE W/O WITHOUT 15. A MONITORED FIRE ALARM SYSTEM AND FIRE SPRINKLER SYSTEM SHALL BE BSMT BASEMENT CONN CONNECTION ELEV ELEVATOR BY OTHERS N.E.G. NATIONAL ELECTRIC CODE PVC. POLYVINYL CHLORIDE SHTG SHEATHING T.O.S. TOP OF SLAB WD WOOD CONST CONSTRUCTION .F.P.A. NATIONAL FIRE PROTECTIONW.B. WOOD BASE INSTALLED AS REQUIRED BY THE T.O.V. BM BEAM EMER EMERGENCY F.S.O.F.B.6. FURNISHED BY OTHERS P.E. PORCELAIN ENAMEL SHT SHEET T.O.STL. TOP OF STEEL C.S.I. CONSTRUCTIONJ.C. JANITOR'S CLOSET ASSOCIATION S.M.R. SHEET MEMBRANE ROOFING T.O.W. TOP OF WALL W.PT. WORKING POINT 16. ALL UTILITY METERS, VENTS, FLUES, ETC. SHALL BE PAINTED TO MATCH THE BRG BEARING ENCL ENCLOSE(URE) FUR FURRED (ING) POS POSITIVE,POSITION BEL BELOW SPECIFICATIONS INSTITUTE EQ EQUAL FUT FUTURE JT JOINT JOINT FILLER NAT NATURAL F.T .cPOST TENSIONED CONCRETE S.M.A.C.N.A. SHEET METAL 4 AIR T.L.D. TOTAL LOAD W.I. WROUGHT IRON LB POUND ADJACENT BUILDING WALL OR ROOF MATERIAL. JF. CONDITIONING CONTRACTORS T.B. TOWEL BAR BTWN BETWEEN CONT CONTINUOUS OR CONTINUE EQUIP EQUIPMENT (N) NEW BVL BEVELED CONTR CONTRACT(OR) EST ESTIMATE N.R. P.G.F. POUNDS PER CUBIC FOOT NOISE REDUCTION NATIONAL ASSOCIATION T.L. TRACK LIGHTING BIT BITUMINOUS C.J. CONTROL JOINT EXC EXCAVATE KP KICKPLATE N.RC. NOISE REDUCTION P.L.F. POUNDS PER LINEAL FOOT S.V. SHEET VINYL FLOOR COVERING TR TRANSOM ELK BLOCK CPR COPPER EXH EXHAUST G.P.M. GALLONS PER MINUTE KITCOEFFICIENT P.S.F. POUNDS PER SQUARE FOOT SIM SIMILAR T TREAD ;C ANGLE BLKG BLOCKING COR CORRUGATED EX EXISTING GAL/ GALVANIZED KO KITCHEN KNOCKOUT NOM NOMINAL P.S.I. POUNDS PER SQUARE INCH S.H. SINGLE HUNG TYP TYPICAL CENTER LINE BD BOARD CTR COUNTER E.B. EXPANSION BOLT G.I. GALVANIZED IRON N.C. NON-CORROSIVE FCC. PRECAST CONCRETE SKY SKYLIGHT 2 CHANNEL B.S. BOTH SIDES CS COUNTERSINK EXP EXPANSION G.S.S. GALVANIZED STEEL SHEET N.M.T. NON-METALLIC PREFAB PREFABRICATE (0) SL SLEEVE {E PROPERTY LINE B.W. BOTH WAYS CRS COURSE (5) E.J. EXPANSION JOINT GSKT GASKET(ED) LEL LABEL (NP.) NO PAINT PFN PREFINISHED S.J. SLIP JOINT UG UNDERCUT ROUND /DIAMETER BOT BOTTOM CRG. CROSS GRAIN EXT EXTERIOR GEN GENERAL LAB LABORATORY N.A. NOT APPLICABLE,(AVAILABLE) PS.C. PRESTRESSED CONCRETE 5.5. SOLID BLOCKING UG UNDERGROUND E,p,E, BOTTOM OF BEAM CF. CUBIC FOOT E.IF.S. EXTERIOR INSULATION AND G.G. GENERAL CONTRACT(OR) LAD LADDER N.I. NOT INCLUDED PROP PROPERTY S.C. SOLID CORE U.L. UNDERWRITERS LABORATORIES EaSQUARE B.O.C. BOTTOM OF CONCRETE G.Y. CUBIC YARD FINISH SYSTEM GL GLASS,GLAZING L.B. LAG BOLT N.I.C. NOT IN CONTRACT P.L. PROPERTY LINE SP SOUNDPROOF UNF UNFINISHED X' DEGREE # NUMBER site plain symbols architectural scmbols material symbols vicinity map �� , �� ROOM NUMBER PLAN 4 SECTION sCr EXISTING FEATURE PROPOSED EXISTING FEATURE PROPOSE( L/ _ _ _ 1i �0 PLANJNG SECTION NUMBERUILDINGSEcnoN AND N FIBER - EARTH PLYWOOD •1 '� �• mm ® ))/ ®� za6 ILNIN� 111(11-IIIIII=IIIIII= / B I F2 I w2 I�3 ;( ROOM NAME =111111=-IIIIII-IIIIII // S - -IV, CONTOUR SPOT ELEVATION WITH FINISHES. I ERCE SHEET NUMBER BASE FL' PROPERTY LINE - - R Q HYDRANT • FLOOR c v ROCK � FINISH WOOD cL CENTER LINE - Q I%< VALVE - - ® WALCEILING �r,,r.,,1,, o. 401 ' • BUILDING SECTION ("ELEVATION) EASEMENT/SETBACK 0 UTILITY POLE IF USED) 11;.• .:41.' 7. °°4 f (CEILING NT. }% \ / ROUC3H WOOD/ ', ,.._...• Ilio RIGHT OF WAY '.1h42'40-„ POROUS FILL /X\ CONTINUOUS �•�`��ro+�m�. // ❑ TRANSFORMER ■ ■ .. .4 Frcr! .r X X FENCE ° ° CEILING mnummmmmm TOP SOIL ROUGH WOOD/ • - ., LIGHT # HEIGHT I�-(d IIIIII=IIIIII=IIIIII- \ DISCONTINUOUS _ ST STORM DRAIN ST ® - SIGN ELEVATIONS •W�. Drawl Title: y ng SS SANITARY SEWER 55 O• MONUMENT O• /® 4 ROADBED MAT'L / .rw.sik III _ •• " SAND, PLASTER " - v:,.. W WATERLINE W O METER PIT • WALL TYPE CD - (firC lr1r111 ❑ ❑ A MARK • �.� CONCRETE )�S�\/l�\C\ BATT INSULATION - `�� - [''`" E ELECTRIC LINE E J Jl 111 J JJJ • O MANHOLE • ( a o r�+,r G GAS LINE G WALL SECTION \ DOOR MARK n o� ° y r. .�,,,•,. COVER CATCH BASIN STONE VENEER �pppppppppppOp RIGID INSULATION IV T TELEPHONE LINE T 0 CLEAN OUT • ® ////// :