December 19, 2014
Aspen Constructors
Attn: Wally Sheata
309 AABC, Unit G
Aspen, Colorado 81611
wsheata( Speiiconstructors.cam Job No. 114 480A
Subject: Compliance of Construction and Materials, EIevator Addition, Clock
Tower Store Building, 263 East Gore Creek Drive, Vail, Colorado
Gentlemen:
Hepworth-Pawlak Geotechnical, Inc. provided construction observation and materials
testing services for foundation soil bearing conditions and concrete during construction of
the elevator addition. Our field services for the construction began on October 28, 2014
and continued on an as-requested basis through November 21, 2014 and were performed
according to our agreement for professional services with Aspen Constructors dated
October 28, 2014. Our services were performed under the direction of the undersigned
. licensed engineer registered in the State of Colorado.
Our testing and observation reports have been distributed under separate cover and are
attached for reference. Specific reports distributed consist of the excavation bearing
observation report dated October 29, and concrete test reports for concrete placed
November 11 and November 21, 2014.
Based on inferences drawn from our observations during construction and the results of
our testing as documented by the referenced field and laboratory reports, it is our
professional opinion that the referenced soil bearing conditions and concrete for the
project has achieved the specified conditions, and/or currently accepted industry practices
as applicable. Please recognize that construction observation and testing are sampling
functions that involve direct observation and testing of very limited amount of the overall
work to evaluate the construction compliance.
If you have any questions, please contact the undersigned.
Sincerely,
HEPWORTH -PAWLAK GEOTECHNICAL, INC.
Steven L. Pawlak, P.E. '
SLP/ksw .. 1J/> /ai ,
Attachments: Observation o 7,: 6t:' 11 eport, dated October 29, 2014
Windsor Probe Concrete Test Report, dated November 21, 2014
Concrete Test Report, dated November 21, 2014
Parker 303-841-7119 • Colorado Springy, 719-633-5562 • Silverthorne 970-468-1989
•
October 29, 2014
Aspen Constructors, Inc.
Attn: Wally Sheata
309 AABC, Unit G
Aspen, Colorado 81611
Job No. 114 480A
Subject: Observation of Excavation, Proposed Elevator Addition, Clock Tower
Store Building, 263 East Gore Creels Drive, Vail, Colorado
Dear Wally:
As requested, a representative of Hepworth-Pawlak Geotechnical, Inc. observed the
excavation at the subject site on October 28, 2014 to evaluate the soils exposed for
foundation support. The findings of our observations and reconnnendations for the
foundation design are presented in this report. We previously conducted a subsoil study
for design of foundations at the site for a different proposed building construction and
presented our findings in a report dated February 29, 2008, Job No. 107 0788. The
current observation was conducted according to you agreement for services with Aspen
Constructors dated October 28, 2014.
The proposed construction includes a remodel of the existing building. As part of the
remodel work an elevator is being added to the structure, including an elevator foundation
pit at basement level. Project plans, prepared by Pierce+Frye, dated September 18,
2014, indicate a design soil bearing pressure of 2,500 psf for the elevator pit footing
bearing on natural site soils.
At the time of our visit to the site, the elevator foundation pit excavation had been cut in
one level approximately 5 feet below the adjacent basement level slab grade in the
interior of the building. The soils exposed in the bottom of the excavation consisted of
natural sandy gravel and cobbles. No free water was encountered in the excavation and
the soils were moist.
The soil conditions exposed in the excavation are suitable for support of spread footings
constructed for the assumed design bearing pressure of 2,500 psf Loose and disturbed
soils should be removed in the footing areas to expose the undisturbed natural soils.
The recommendations submitted in this letter are based on our observation of the soils
exposed within the foundation excavation and the previous subsurface exploration at the
siLe. aiiiaiUurs in the subsurface conditions including goundwater level fluctuations
Aspen Constructors, Inc.
October 29, 2014
Page 2
below the excavation could increase.the risk of foundation movement. We should be
advised of any variations encountered in the excavation conditions for possible changes to
recommendations contained in this letter. Our services do not include determining the
presence, prevention or possibility of mold or other biological contaminants (MOBC)
developing in the future. If the client is concerned about MOBC, then a professional in
this special field of practice should be consulted.
If you have any questions or need further assistance, please call our office.
Sincerely,
HEPWORTH—PAWLAK GEOTECHNICAL, INC.
James A. Parker, P.E., P.G.
Reviewed by:
Steven L. Pawlak, P.E.
JAP/ksw
•
Job No. 114480A
C�-otech
.. 5020 County Road 154
GeeteC r^—1 Glenwood Springs, CO 81601
Phone: 970-945-7988
HEPWORTH-PAWLAK GEOTECHNICAL Fax: 970-945-8454
hpgeo@hpgeotech.com
WINDSOR PROBE CONCRETE TEST REPORT
Client: Aspen Constructors, Inc. Job No.: 114 480A Day: Friday
Attn: Wally Sheata Date: 11/21/14
309 AABC, Unit G Sheet: 1 of 1
Aspen, Colorado 81611
Project: Proposed Elevator Addition, Clock Tower Store Building, 263 East Gore Creek Drive,
Vail, Colorado
Test Location: Elevator Pit South Wall
Concrete Information
Concrete Age: 10 days 28 Day Design Strength: 4000 psi Approximate 12"+
Thickness:
Aggregate Size: 3/s" Aggregate Moh's No: 6
Surface Description: Smooth Form Finish
Test Information
Driver Unit I.D. No. 133550 Power Level: Standard Probe Length: 3.125 in.
Compressive Strength
Probe 1 Probe 2 Probe 3 Average
Exposed Probe (in) 1.78 1.70 1.71 1.73
Compressive Strength (psi) 3660 3005 3150 3270
Notes:
Distribution:
Aspen Constructors, Inc. -Wally Sheata(wsheata@aspenconstructors.com)
Thomas J. Westhoff, CET Steven L. Pawlak, P.E.
Field Technician Reviewed By
5020 County Road 154
Geejech Glenwood Springs, CO 81601
Phone: 5-7988
Fax: 970-945-8454
HEPWORTH-PAWLAK GEOTECHNICAL
hpgeo@hpgeotech.com
CONCRETE TEST REPORT
Aspen Constructors, Inc. Job No. 114 480A
Attn: Wally Sheata Date Cast: 11-21-14
309 AABC, Unit G
Aspen, Colorado 81611 Sheet 1 of 1
Project: Proposed Elevator Addition, Clock Tower Store Building, 263 East Gore Creek Drive,
Vail, Colorado
Placement Location: Elevator Pit North, East and West Walls
Supplier: United Time Batched: 2:20 pm Load Size (Yds): 4
Truck No: 0000 Time Arrived: 2:40 pm Yds Delivered: 4
Ticket No: 33503015 Time Placed: 2:50 pm Yds Ordered: 4
Mix Design: 37610444 3/8 line pump
Method of Placement: Pump Sample Point: Truck Discharge
Time Sampled: 2:55 pm Wet Unit Wt 138.8 pcf
Air Temp: 41° Slump: 4% inches
Concrete Temp: 60° Air Content: 5.1 0/0
Water Added: None
Communication: The Supplier was informed of our field test results.
Time Cylinders Cast: 3:05 pm
Initial Cure Time On Site: 3 days Field Storage: Insulated cure box inside heated
building
Date in Lab: 11-24-14 Cylinder Temperature at Pick Up: 59° Min/Max: 52°/83°
Compressive Strength Data
2014
Compressive
Lab Age Date Load Diameter Area p 28 Day
Number Days lbs. in. in2 Strength (psi) Avg. (psi)
792A 7 11-28-14 64,060 4.01 12.63 5070
792B 28 12-19-14 85,900 4.01 12.63 6800
792C 28 12-19-14 86,800 4.01 12.63 6870 6840
792D Hold/56 Discarded
Specified Strength for Structure: 4000 psi at 28 days Specified Strength for Mix: 4500 psi at 28 days
Notes:
Distribution:
Aspen Constructors, Inc. -Wally Sheata(wsheata(a7aspenconstructors.com)
United—Holly Martin(Holly.martialdcastle-materials.com)
United-Misty Grosse(Mistv.Murr(a�united-gi.com)
Tom Westhoff, CET David A. Young, P.E.
Field Technician Reviewed By