HomeMy WebLinkAboutB14-0224_Electrical Com Check_1403031300.pdf (1.11 COMcheck Software Version 3.9.3 .
. . •
tr
Interior Lighting and Power fØ37• Z c =
Compliance Certificate -9 6-16-2014... •�
2012 IECC
•'•••SS�oNp ;••♦
Section 1: Project Information
Project Type:Alteration
Project Title : Gorsuch
Construction Site: Owner/Agent: Designer/Contractor:
Vail,CO
Section 2: Interior Lighting and Power Calculation
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B x C)
Retial(Retail:Sales area) 5831 1.6 9330
Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:T1 2395(a) 1.4 3353(b)
Supplemental Allowed Watts(c)= 113
Total Allowed Watts= 12796
(a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified.
(b) Allowance is(B x C)or the actual wattage of the fixtures given in Section 2,whichever is less.
(c) Supplemental watts must be associated with retail merchandise highlighting fixtures.
Section 3: Interior Lighting Fixture Schedule
A B C D E
Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Retial(Retail:Sales area 5831 sq.ft.)
LED 2:C1: LED TAPE LIGHT:Other: 1 16 3 48
LED 1: D1 DIEM: LED DOWNLIGHT:Other: 1 12 16 192
Linear Fluorescent 1: Fl F1EM:4'2 LAMP STRIP:48"T8 28W(Super T8):Electronic: 2 24 56 1344
Linear Fluorescent 3: F2 F2EM:2'2 LAMP STRIP:24"T8 17W: Electronic: 2 2 37 74
Linear Fluorescent 1 copy 1: F3 F3EM:4'2 LAMP STRIP:48"T8 28W(Super T8): 2 5 56 280
Electronic:
LED 3: P1:DECORATIVE PENDANT:Other: 1 12 140 1680
Track lighting 1:Ti:TRACK:Wattage based on 301 feet of track 0 0 9030 9030
Linear Fluorescent 2:W1: DECORATIVE WALL SCONCE:24"T8 17W:Electronic: 2 4 37 148
Total Proposed Watts= 12796
Interior Lighting:Passes using retail merchandise highlighting supplemental watts.
Section 4: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2012 IECC
requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist.
Name-Title Signature Date
Section 5: Post Construction Compliance Statement
Record Drawings and Operating and Maintenance Manuals:
Project Title: Gorsuch Report date: 06/16/14
Data filename: J:\2728.00-Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 1 of 2
`ts( 1. Construction documents with record drawings and operating and maintenance manuals provided to the owner.
Lighting Designer or Contractor Name Signature Date
iii iia , 5837 `zo:
•• 6-16-2014
. • /ONAt-F .
Project Title: Gorsuch Report date: 06/16/14
Data filename:J:\2728.00-Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 2 of 2
\(
COMcheck Software Version 3.9.3
rfl Inspection Checklist
Energy Code: 2012 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
.••, 0 R.. .1 /S'••
.01 -4 � •
4 1
,,
T•
ri,
is4Ø5837 :z
• 6-16-2014
./:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Gorsuch Report date: 06/16/1
Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 1 of 5
2012 IECC Plan Review Complies? Comments/Assumptions
C103.2 Plans, specifications, and/or Complies
[PR4]1 calculations provide all information ❑Does Not
with which compliance can be
determined for the interior lighting ['Not Observable
and electrical systems and equipment ENot Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
( z �
•, 6-16-2014 �'
• % •• ••
. i ` •.
1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Gorsuch Report date: 06/16/1
Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 2 of 5
2012 IECC Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.2. ;Automatic controls to shut off all NComplies
1 ;building lighting installed in all ❑Does Not
[EL22]2 ;buildings.
[Not Observable
ENot Applicable
C405.2.1. 'Independent lighting controls installed Complies
1 per approved lighting plans and all ❑Does Not
ail
[EL23]2 manual controls readily accessible and
visible to occupants. [Not Observable
E Not Applicable
C405.2.1. 1 Lighting controls installed to uniformly Nicomplies
2 I reduce the lighting load by at least ❑Does Not
[EL15]1 50%.
[Not Observable
E Not Applicable
C405.2.2. :Daylight zones provided with ❑Complies
3 :individual controls that control the ❑Does Not
[EL16]2 ;lights independent of general area
lighting. [Not Observable
Not Applicable
Et
C405.2. Sleeping units have at least one ❑Complies
[EL17] master switch at the main entry door ❑Does Not
that controls wired luminaires and
switched receptacles. [Not Observable
"RNot Applicable
C405.2.2. 'Occupancy sensors installed in 1SComplies
2 required spaces. ❑Does Not
[EL18]1 ❑Not Observable
E Not Applicable
C405.2.2. Primary sidelighted areas are ❑Complies
3 equipped with required lighting ❑Does Not
[EL20]1 controls.
[Not Observable
'SINot Applicable
C405.2.2. Enclosed spaces with daylight area ❑Complies
3 under skylights and rooftop monitors ❑Does Not
[EL21]1 are equipped with required lighting
controls. [Not Observable
ELNot Applicable
C405.2.3 Separate lighting control devices for INcomplies
[EL4]1 specific uses installed per approved LIDoes Not
lighting plans.
[Not Observable
LINot Applicable
C405.3 Fluorescent luminaires with odd ❑Complies
[EL19]3 numbered lamp configurations that ❑Does Not
.11
are with 10 feet center to center(if
recess mounted) or are within 1 foot
Observable
edge to edge (if pendant or surface `QNot Applicable
:mounted)shall be tandem wired.
C405.4 'Exit signs do not exceed 5 watts per 11NComplies
[EL6]1 face. ❑Does Not
['Not Observable
E Not Applicable .•....•."'R.....,•••
C405.2.3 Additional interior lighting power OComplies )10,44
• �•O• •• .1 4Sl,
[EL8]1 allowed for special functions per the LIDoes Not .approved lighting plans and is n ' �'•�mautomatically controlled and ❑Not Observable : • A
separated from general lighting. �,jVot Applicable ?nI .5837 Z.
Additional Comments/Assumptions: •• ' 6-16-2014 :I;
SS/o pN,11- .•
1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Gorsuch Report date: 06/16/1
Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 3 of 5
►.• r Rr' /S•••
•
4,1iii
z
% P5837 i
•
• 6-16-2014 ►
•1'; •.:
SSIONAk-°•••
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Gorsuch Report date: 06/16/1
Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 4 of 5
2012 IECC Final Inspection Complies? Comments/Assumptions
C408.2.5. :Furnished as-built drawings for ❑Complies
1 electric power systems within 30 days ❑Does Not
[F116]3 :of system acceptance.
[Not Observable
ENot Applicable
C303.3,C4 Furnished O&M instructions for ❑Complies
08.2.5.2 systems and equipment to the ❑Does Not
[F117]3 building owner or designated
representative.
[Not Observable
❑Not Applicable
C405.5.2 Interior installed lamp and fixture Complies See the Interior Lighting fixture schedule for values.
[F118]' lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts ['Not Observable
are less than or equal to allowed ❑Not Applicable
l watts.
C408.3 Lighting systems have been tested to ,❑Complies
[F133]1 ensure proper calibration, adjustment, :❑Does Not
programming, and operation.
❑Not Observable
❑Not Applicable
C406 Efficient HVAC performance, efficient ❑Complies
[F134]1 lighting system, or on-site supply of ❑Does Not
renewable energy consistent with
what is shown the approved plans. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
iii7,1d:(
rek.
O I .5837
:.0 6-16-2014 ; :
•,��� �•E�
SS/ONA •••
.
Project Gorsuch Report 06/16/14
Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 5 of 5