Loading...
HomeMy WebLinkAboutB14-0224_Electrical Com Check_1403031300.pdf (1.11 COMcheck Software Version 3.9.3 . . . • tr Interior Lighting and Power fØ37• Z c = Compliance Certificate -9 6-16-2014... •� 2012 IECC •'•••SS�oNp ;••♦ Section 1: Project Information Project Type:Alteration Project Title : Gorsuch Construction Site: Owner/Agent: Designer/Contractor: Vail,CO Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Retial(Retail:Sales area) 5831 1.6 9330 Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:T1 2395(a) 1.4 3353(b) Supplemental Allowed Watts(c)= 113 Total Allowed Watts= 12796 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b) Allowance is(B x C)or the actual wattage of the fixtures given in Section 2,whichever is less. (c) Supplemental watts must be associated with retail merchandise highlighting fixtures. Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Retial(Retail:Sales area 5831 sq.ft.) LED 2:C1: LED TAPE LIGHT:Other: 1 16 3 48 LED 1: D1 DIEM: LED DOWNLIGHT:Other: 1 12 16 192 Linear Fluorescent 1: Fl F1EM:4'2 LAMP STRIP:48"T8 28W(Super T8):Electronic: 2 24 56 1344 Linear Fluorescent 3: F2 F2EM:2'2 LAMP STRIP:24"T8 17W: Electronic: 2 2 37 74 Linear Fluorescent 1 copy 1: F3 F3EM:4'2 LAMP STRIP:48"T8 28W(Super T8): 2 5 56 280 Electronic: LED 3: P1:DECORATIVE PENDANT:Other: 1 12 140 1680 Track lighting 1:Ti:TRACK:Wattage based on 301 feet of track 0 0 9030 9030 Linear Fluorescent 2:W1: DECORATIVE WALL SCONCE:24"T8 17W:Electronic: 2 4 37 148 Total Proposed Watts= 12796 Interior Lighting:Passes using retail merchandise highlighting supplemental watts. Section 4: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2012 IECC requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. Name-Title Signature Date Section 5: Post Construction Compliance Statement Record Drawings and Operating and Maintenance Manuals: Project Title: Gorsuch Report date: 06/16/14 Data filename: J:\2728.00-Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 1 of 2 `ts( 1. Construction documents with record drawings and operating and maintenance manuals provided to the owner. Lighting Designer or Contractor Name Signature Date iii iia , 5837 `zo: •• 6-16-2014 . • /ONAt-F . Project Title: Gorsuch Report date: 06/16/14 Data filename:J:\2728.00-Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 2 of 2 \( COMcheck Software Version 3.9.3 rfl Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. .••, 0 R.. .1 /S'•• .01 -4 � • 4 1 ,, T• ri, is4Ø5837 :z • 6-16-2014 ./: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Gorsuch Report date: 06/16/1 Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 1 of 5 2012 IECC Plan Review Complies? Comments/Assumptions C103.2 Plans, specifications, and/or Complies [PR4]1 calculations provide all information ❑Does Not with which compliance can be determined for the interior lighting ['Not Observable and electrical systems and equipment ENot Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: ( z � •, 6-16-2014 �' • % •• •• . i ` •. 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Gorsuch Report date: 06/16/1 Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 2 of 5 2012 IECC Rough-In Electrical Inspection Complies? Comments/Assumptions C405.2.2. ;Automatic controls to shut off all NComplies 1 ;building lighting installed in all ❑Does Not [EL22]2 ;buildings. [Not Observable ENot Applicable C405.2.1. 'Independent lighting controls installed Complies 1 per approved lighting plans and all ❑Does Not ail [EL23]2 manual controls readily accessible and visible to occupants. [Not Observable E Not Applicable C405.2.1. 1 Lighting controls installed to uniformly Nicomplies 2 I reduce the lighting load by at least ❑Does Not [EL15]1 50%. [Not Observable E Not Applicable C405.2.2. :Daylight zones provided with ❑Complies 3 :individual controls that control the ❑Does Not [EL16]2 ;lights independent of general area lighting. [Not Observable Not Applicable Et C405.2. Sleeping units have at least one ❑Complies [EL17] master switch at the main entry door ❑Does Not that controls wired luminaires and switched receptacles. [Not Observable "RNot Applicable C405.2.2. 'Occupancy sensors installed in 1SComplies 2 required spaces. ❑Does Not [EL18]1 ❑Not Observable E Not Applicable C405.2.2. Primary sidelighted areas are ❑Complies 3 equipped with required lighting ❑Does Not [EL20]1 controls. [Not Observable 'SINot Applicable C405.2.2. Enclosed spaces with daylight area ❑Complies 3 under skylights and rooftop monitors ❑Does Not [EL21]1 are equipped with required lighting controls. [Not Observable ELNot Applicable C405.2.3 Separate lighting control devices for INcomplies [EL4]1 specific uses installed per approved LIDoes Not lighting plans. [Not Observable LINot Applicable C405.3 Fluorescent luminaires with odd ❑Complies [EL19]3 numbered lamp configurations that ❑Does Not .11 are with 10 feet center to center(if recess mounted) or are within 1 foot Observable edge to edge (if pendant or surface `QNot Applicable :mounted)shall be tandem wired. C405.4 'Exit signs do not exceed 5 watts per 11NComplies [EL6]1 face. ❑Does Not ['Not Observable E Not Applicable .•....•."'R.....,••• C405.2.3 Additional interior lighting power OComplies )10,44 • �•O• •• .1 4Sl, [EL8]1 allowed for special functions per the LIDoes Not .approved lighting plans and is n ' �'•�mautomatically controlled and ❑Not Observable : • A separated from general lighting. �,jVot Applicable ?nI .5837 Z. Additional Comments/Assumptions: •• ' 6-16-2014 :I; SS/o pN,11- .• 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Gorsuch Report date: 06/16/1 Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 3 of 5 ►.• r Rr' /S••• • 4,1iii z % P5837 i • • 6-16-2014 ► •1'; •.: SSIONAk-°••• 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Gorsuch Report date: 06/16/1 Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 4 of 5 2012 IECC Final Inspection Complies? Comments/Assumptions C408.2.5. :Furnished as-built drawings for ❑Complies 1 electric power systems within 30 days ❑Does Not [F116]3 :of system acceptance. [Not Observable ENot Applicable C303.3,C4 Furnished O&M instructions for ❑Complies 08.2.5.2 systems and equipment to the ❑Does Not [F117]3 building owner or designated representative. [Not Observable ❑Not Applicable C405.5.2 Interior installed lamp and fixture Complies See the Interior Lighting fixture schedule for values. [F118]' lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ['Not Observable are less than or equal to allowed ❑Not Applicable l watts. C408.3 Lighting systems have been tested to ,❑Complies [F133]1 ensure proper calibration, adjustment, :❑Does Not programming, and operation. ❑Not Observable ❑Not Applicable C406 Efficient HVAC performance, efficient ❑Complies [F134]1 lighting system, or on-site supply of ❑Does Not renewable energy consistent with what is shown the approved plans. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) iii7,1d:( rek. O I .5837 :.0 6-16-2014 ; : •,��� �•E� SS/ONA ••• . Project Gorsuch Report 06/16/14 Data J:\2728.00 - Gorsuch Remodel\Ltg Calcs\2728.00 IECC.cck Page 5 of 5