Loading...
HomeMy WebLinkAboutB14-0224_M3.0_1407262320.pdf 404 F1,4 :se"if■ 44 illiorios Ai Li rel 0 FUTURE SNOWMELT SYSTEM. 1110 I S 4." Lu Lu 0 6 ItLun 'Liil 0to it 0 0 0 O w 0 z AS - HX � oUi 0 0 p o T 1TS-3 0 6 08/05/14 P ( I 1 1��4 a l'J 0 Q i_ to � , 0 1• I Y .r .� .� .r .� .r .r .rte .r .r .� .!" .r .r .r .r HWS Z 2" 0, 0, � � � � � � � � � � � � � � � HWR v w L • <r)- › x ii.. 1 z � � � Fa IL 0 ET J 4a in .r .r .r .r .r .r .r .r .r LU 0 \-f Z z E 1:4 z ,�p,�p, p,�p,�p,�p, p,�p ,gyp ,gyp ,gyp ,gyp ,gyp ,gyp >� 0 tu �II��1E1E�IE q OE ' : q q W o z �Q 0 z ®®®®®®®® * * * * 0 ® * KNir 63 0 DOMESTIC WATER -DCW f - FROM WATER 1P-Ili- ' 0- 11,2 ii 11,2" 11,2 ii sv �� 3,4 ii 3,4 ii 3,4 ii 3,4 ii 3,4 ii 3,4 ii 3,4 ii PIPING TO BUILDING �DHW - ENTRY } ( �,ry 1� Z ill cil 0 PSI RELIEF moi-p' IllI— • • • • • • • 8 VALVE (TYP.) S S S A A s, Sea I ii3 1 1 1 1 1 1 1 1 1 1 A 1 A 1 4 ,VOISN INCLUDE 10 EQUIVALENT PIPE I ---0.00ic,.„��y�I/ 0 DIAMETERS OF STRAIGHT PIPE AT p p p PUMP INLET 4 OUTLET. (TYP OF ALL I i Cr. �:-h,P.• J. WC . O �► i- PUMPS) I i :�g 7/10/14 {R,. r, j ET-2 # P` • 8-1 5-2 8-3 39 : .6 upi 'UMW1 1 11 .a •• i , AI r cn '-e STAINLESS STEEL WELL s I 1+}i�i� •,'e t`'� O G IL ,z r. Lu 1 1 1 1 1'1�►��w«" Z � —I-1— n p i- L�(� ; Le — --- Wi-i-1 -I 0 `I 111/2" 11/2" 1�,s"Le Le ®m 0 -41-1 -el � -•-1 -•-, -•-, I to I= IL (L IL 0-01- 0"01_ �z m is-2 � oLe Le Le Le- AS-1 �IL QT 0 0 i_ 1i,2 1�,2 a 2" 2" 1i,4 1i,4 T tS-1 �' �' ♦' b 1i, I,, Q 1 _ _ 2 [ 4 2 HWS - 21/2" 2 i,2 _ _ f m 0 N.o. • - I 0 w p — f 21,2 n • z U 11/2" 11/2" HWR 21/2" � N O IIC4 —_ —_ — 0 0 1 4E'i Lu ryo_ THIS BOILER SYSTEM SERVES 4 A DOMESTIC NOT WATER, SPACE FLOOR — 1 Z In 0 DRAIN 1 It HEATING, AND SNOWMELTINC. FUTURE SNOWMELT SYSTEM. GAP HWS/R LINES IN MECH ROOM HOSE BIB `� U i— cja FOR FUTURE SNOWMELT SYSTEM. (TYP.) ET-I ? 7 ill 4" HIGH CONCRETE . pQ mpaCLOSELY SPACED TEES HOUSEKEEPING PAD (TYP.) (1. • q Z J� ROUTE BOILER CONDENSATE PIPE DOWN TO 2" O Q C ,� I I I IC THROUGH CNT-1 PRIOR TO ABOVE FINISHED FLOOR ILI -4 NO SCALE DISCHARGE INTO FLOOR (TYp) 4 p4U U z DRAIN WITH AIR GAP. e. u 3 SEALANT ALL SIDES 0 1=1 z zQ < PLENUMTHROUGH HE WACT LL AND, FOR LL EXTEND EXTERIOR WALL 0O Z THE BOTTOM AND SIDES, SHALL ° O V I- -HANGER ROD F USH WITH TL HE BE L E OUTER LOUVER WITH0 N P/T TEST PORT SURFACE OF THE "AL: DRAINABLE BLADES w q EXTENDED SILL J ISI 0 Ui ISOLATION VALVE - - - BIRD SCREEN /1 N w N CHECK VALVE (LOCATE ON -I a1-111 DISCHARGE SIDE OF PUMP IF I I O PUMP IS NOT EQUIPPED WITH �J ij1 1Ill i_ 1,11 1INTEGRAL CHECK VALVE) I I - - - DUCTS CRE: PLANS). -till INTEGRAL N TAP HIGH ON PLENUM. _ ) ,. n() mei - I ��� � 0 GAS METER FOR TOTAL INTO BUILDING ABOVE 2" G MANIFOLD Lu I- L _ J _ - _ CONNECTED LOAD OF 855 GRADE IV ENLARGEMENT 1 PLENUM AS SHOWN ON MBH, 1058 CFH. PROVIDED Issued For Z 0- I I Al .-I,/ PLANS, 12" MINIMUM BY UTILITY COMPANY. Z 00 "SMALL" INLINE WET ROTOR [ DEPTH. PLENUM No. Date Comment DRILL WEEP HOLES IN THE I SHALL BE UNLINED 1 6/4/14 COORDINATION _ at I- IS DEFINED HERE AS I/2 HP BOTTOM FRAME OF THE L - - - AND WRAPPED PER 2 6/13/14 PERMIT I- in OR LESS. LOUVER FOR DRAINAGE >- I SPECS. 3 7/10/14 PERMIT RESUB _ CII i6 SEAL LOUVER PLENUM SLOPE 2" PER ♦ �� q p WATERTIGHT WITH SOLDER . © 2 C > z T F I C A L S ALL I\LIN T 0T0 LINEAR FOOT OR 100 YEAR MASTIC _ O 4 -M TAILO U �l 1 INSTALLATION T A I SEE ENLARGEMENT LOWER LEVEL 0- _ NO SCALE D NO SCALE 0 .4 w Il i0_ it O i U TWO 90 DEGREE ELBOWS BELOW I- _I GRADE 0 0 0 - O ZZ PIPING = PROVIDE EASILY REMOVABLE 0 BIRDSCREEN FOR PERIODIC Qin CLEANING (NO SCREEN AT ALL FOR DRYER DUCT J 51 BOILER 5-2 BOILER B-3 BOILER INSTALLATIONS) (80') S (80') S(80') MECHANICAL to > I 1 SCHEMATICS wit u 18 GAUGE GALVANIZED Lii LJ � 0? COUNTERFLASHED TOP Z 0 i Z COVER WITH INTEGRAL PIPE r - ROOF SLEEVE IR `s' ZcZ_ PREFABRICATED INSULATED . - 0 ROOF CURB TO MATCH ROOF t. / Z SLOPE. SECURE TO ROOF. 4 X Lu SEE PLANS FOR > LuLU V FLASHING BY ROOF / r DUCT SIZE Project No. Scale: Z .Q p U p CONTRACTORIR — o 14P>4S 00 N/A C = LOW PRESSURE GAS Drawn By: Checked By: d Z 8 RIGIDLY SUPPORT DUCT MPCU = MEDIUM PRESSURE CCAS (2 PSI) JAN JDR w z i FROM STRUCTURE Z Z -1 OOSGN C DLJ T D TAIL GAS FIFI\G SCI I MATICM3 .0 4 Ul o NO SCALE O NO SCALE z p Q d �0