Loading...
HomeMy WebLinkAboutB14-0264_XBS-2_1408655100.pdf1'-0" 8" 8" 18'-103 4" 10" 35'-3" 26'-2" 17'-0" 16'-1112" 4'-414" 20'-9" 8'-3" 1'-7" 8" Wall to Demo 9'-7" V.I.F. 8'-9" 15'-0" +/-4'-0" 11'-0" 17'-2" 71'-8" 16'-11" 58'-112" 9'-10" 15'-0" 29'-8" 13'-812" 9'-6" 18'-0" 12'-712" 3'-0" 26'-3" 7'-012" 7'-95 8" 17'-5" STAIR 8184 8186 8188 8190 8192 8196 8198 8200 8202 8204 8206 8208 8194 8196 8200 8198 8202 8204 8182 8180 8178 8176 8174 8172 T.O.F. = 76'-0" T.O.F. = 75'-0" 3 3 A A 5 B C D E 4 3 2 1 6 8194 8192 8190 8188 8186 8182 8184 8186 SEE DWG XBS-3 AND XBS-4 FOR DEVELOPED ELEVATION VIEW OF EARTH RETENTION 4 2 A SN 14 SN 13 SN 10 SN 12 SN 11 SN 9 SN 8 SN 7 SN 6 SN 5 SN 4 SN 3 SN 2 SN 1 SN 15 SN 16 SN 17 SN 18 SN 19 SN 20 SN 21 SN 22 SN 23 SN 25 SN 26 1 2 3 4 5 6 7 1'-3" Minimum Clearance For Drill Rig From Face of Wall 1'-3" Minimum Clearance For Drill Rig From Face of Wall 1'-6" Anticipated Offset T.B.D. TIEBACK IDENTIFICATION PROPOSED FOUNDATION WALL EXISTING GRADE 1 LEGEND PROPOSED EXCAVATION GRADE 5196 TEL: 303-791-9911 FAX: 303-791-0967 9512 TITAN PARK CIRCLE LITTLETON, COLORADO 80125 SHT. 2 OF 4 XBS-2 DWG. NO. DWN BY: JVW NOT VALID WITHOUT DATE & ORIGINAL SIGNATURE GRID LINE 8 SOIL NAIL IDENTIFICATION SN 1 JOB NO. : 5501 WEBSTER RESIDENCE ISSUED: 06-26-2014 4th FLOOR PLAN VIEW SCALE: 1/8" = 1'-0" PLAN NORTH NEDBO CONSTRUCTION PO BOX 3419 VAIL, CO 81659 970-845-1001 1. DESIGN BASIS A. 2012 INTERNATIONAL BUILDING CODE 2. REFERENCE CODES: A. AISC-ASD STEEL MANUAL, 14TH EDITION B. ACI 318-11 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" C. PUBLICATION NO. FHWA-SA-97-070 "MICROPILE DESIGN AND CONSTRUCTION GUIDELINES." 3. FOUNDATION: A. A GEOTECHNICAL ENGINEERING REPORT WAS NOT PROVIDED TO COGGINS & SONS, INC. COGGINS SELECTED GEOTECHNICAL PARAMETERS BASED ON OTHER PROJECTS COMPLETED IN THE IMMEDIATE VICINITY. 4. MATERIALS: A. BARS: BARS TO BE GRADE 75 OR GRADE 150 OF SIZE INDICATED ON MICROPILE PLANS. REINFORCEMENT BARS SHALL MEET ASTM A 615/AASHTO M31 (GR. 75) OR ASTM A 722/AASHTO M275 (GR. 150) SPECIFICATIONS. MINIMUM THICKNESS OF EPOXY COATING SHALL BE 0.010 INCH. EPOXY COATING SHALL BE IN ACCORDANCE WITH ASTM A775 OR ASTM A934. CENTRALIZERS SHALL BE PROVIDED FOR ALL MICROPILES AS INDICATED PER PLAN. CENTRALIZERS SHALL BE FABRICATED FROM SCHEDULE 40 PVC PIPE. B. GROUT: PRESSURE INJECTED GROUT SHALL BE PORTLAND CEMENT TYPE I OR TYPE II, MEETING ASTM C150 SPECIFICATIONS AND POTABLE WATER. THE MAXIMUM WATER/CEMENT RATIO SHALL BE 0.45. THE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF THE GROUT SHALL BE 4,000 PSI. GROUT MAY CONTAIN SIKA CO. INTERPLAST-N SHRINKAGE COMPENSATING CEMENT IN THE MAXIMUM AMOUNT OF 1% BY WEIGHT OF CEMENT. DURING PRODUCTION, GROUT SHALL BE TESTED FOR COMPRESSIVE STRENGTH IN ACCORDANCE WITH ASTM C109 AT A FREQUENCY OF NO LESS THAN THREE SETS OF THREE CUBES FROM EACH GROUT PLANT EACH DAY OF OPERATION. (ONE SET = THREE GROUT CUBES) FREQUENCY OF TESTING TO BE REVIEWED AFTER FIRST WEEK OF PRODUCTION. THE COMPRESSIVE STRENGTH SHALL BE THE AVERAGE OF THE 3 CUBES TESTED PER ONE SET. GROUT SAMPLES SHALL BE TAKEN DIRECTLY FROM THE GROUT PLANT. PROVIDE GROUT CUBE COMPRESSIVE STRENGTH RESULT TO THE COGGINS ENGINEER WITHIN 24 HOURS OF TESTING. BREAKS TO OCCUR AT 7 AND 28 DAYS WITH ONE SET TO BE HELD FOR FUTURE TESTING, IF NECESSARY. C. PIPE: CASING SHALL BE OF DIAMETER AND WALL THICKNESS INDICATED ON MICROPILE SCHEDULE. PIPE SHALL CONFORM TO EITHER ASM A53 GRADE B DESIGNATION (MINIMUM YEILD STRESS OF 36 KSI) OR API N-80 SPECIFICATIONS (MINIMUM YIELD STRESS OF 80 KSI). API PIPE SHALL BE FREE FROM DEFECTS AND DOCUMENTATION OF MINIMUM STRENGTH SHALL BE PROVIDED TO COGGINS ENGINEER. SPLICING OF PIPE IS NOT PERMITTED. D. PLATES AND SHAPES: STRUCTURAL SHAPES SHALL CONFORM TO ASTM A36/AASHTO M183 OR ASTM A572/AASHTO M223, GRADE 36. 5. ALL DIMENSIONS ON DRAWINGS SHALL BE VERIFIED BY GENERAL CONTRACTOR PRIOR TO BEGINNING OF WORK. 6. PROCEDURE: A. ALL UTILITIES WITH EQUIPMENT OR FACILITIES SERVING AN AREA WITHIN 300 FEET OF THE PLANNED CONSTRUCTION SHALL BE NOTIFIED PRIOR TO MICROPILE INSTALLATION THAT SUCH WORK IS TO TAKE PLACE. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION OF MICROPILES WITH UTILITIES. B. ADVANCE DRILL BIT FULL MICROPILE LENGTH UTILIZING ROTARY PERCUSSION DRILLING TECHNIQUES. PLACE GROUT FULL LENGTH OF MICROPILE AND THE QUALITY OF GROUT SHALL BE MONITORED BY COLLECTING CUBES FOR LATER COMPRESSION TESTING (SEE MATERIALS-GROUT FOR PROCEDURE). UPON COMPLETION OF GROUTING, INSERTY PIPE INTO DRILLED HOLE WITH GROUT. ADJUST TOP OF PIPE AND BAR TO PROPER ELEVATION. INSTALL BEARING PLATE AND HARDWARE. C. MICROPILE INSTALLATION SHALL BE MONITORED AND RECORDED. MONITORED AND RECORDED DATA SHALL INCLUDE TOTAL DEPTH, GROUT PRESSURE, GROUT QUANTITIES, SOIL/ROCK ENCOUNTERED DURING INSTALLATION, AND ANY OBSTRUCTION OR IRREGULARITIES. 7. ENGINEER'S APPROVAL MUST BE SECURED FOR ALL SUBSTITUTIONS. MICROPILE GENERAL NOTES 8200 08/21/14