HomeMy WebLinkAboutB14-0153_ProjectDox Plan Review Form_1400797620.pdf ProjectDox Plan Review Form
a � e" BuiIding
software
Click Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0) Routing Slip
Review Coordinator Shelley Bellm (sbellm@vailgov.com)
Review Cycle i
Workflow/Activity Name Begin_Workflow/ApplicantResubmit
0 Activity Instructions
Please review all sections of the eForm and drawing markups and resubmit the required information prior to
completion of task.
Current User Logon I Roland Lee(Rolandw533@gmail.com)
CHANGEMARKS-Review Cycle:
Filter Changemarks by Keyword:[ 'SEARCH SHOW ALL
Click Here to Load Changemarks...
1jl Click Here to Publish Changemarks to PDF...
Resolved Sta Cycle Department File Markup Description Details MI Applicant Response
Yes I No No ®' 1 Building A 3.1.pdf mhaeberle B001 How is the meter to be protected per Town code? See Architects response
.
mosei
Yes I No No p`.y 1 Building A 3.1.pdf mhaeberle B002 Required to be Class A See Architects Response
-r7.
7
Yes I No No j _. 1 Building A0.0.pdf mhaeberle B001 75%high efficacy See Architects Response
Provide a handrail per IRC 2012.See definition of rI
- 1 Building A2.2.pdf mhaeberle 8001 See Architects Response
Yes .LLQ No z,Clll, stair .
■
■ _ ' Piping to be sized per IFGC section 402 Clarify
Gas Mo No �'I. ' 1 Building
pi in df mhaeberle B001 adjustment for alttitude amnd wc.normally that is
p 9•p see
revrsetl original drawing
etl proper y far ewlag
for propane
Gas ,Show metwer location on plans and how it is
https://vaileplans.magnetserver.cpm/Projectdox/workfloweforms/353_354_3.aspx?LaunchMode=new&F1owTaskID=1674[5/22/2014 4:24:41 PM]
ProjectDox Plan Review Form
IMP ' • ,
Yes I No No i 1 Buildingmhaeberle B002 see revised AA3.1.pdf with
piping.pdf protected
Yes I Nuc No �' a. 1 Building S6.pdf mhaeberle 8001 Show soil drain on on plans and termination point see attached proposal and
YesINQ No
y
�c 1 Building S6.pdf mhaeberle, B002 How is drainange being handled? see attached Proposal and
., !;.:2.---1
Please clarify special inspection criteria.Cover
Yes I No No ,- (,I 1 Building S7.pdf mhaeberle 8001 page indicates no special inspection see section See Engineers response
— !, 1705.2 IBC
1
Gas meter needs to be located within the first third
Changemarks
Yes I No No .. ",.i..4 ,-' 1 Planning A 3.1.pdf JB 001 note#01 of the house and adequately protected by the roof See revised A3.1.pdf
* eave(4').
i
• ;� 2x2 Box in the upper right hand corner must be
I
Yes �
No No — ' a 1 Review A0.0. df SBellm A001 made available for Town of Vail approvalon
—� - 11tn_ Coordinator p all pages. stamp See revised A0.0.pdf
7- -11211u
Of
V
\1401 DEPARTMENT REVIEW-Review Cycler
CYCLE DEPARTMENT REVIEWED BY STATUS&NOTES
Please send to Tom K
MARTIN HAEBERLE CORRECTIONS REQUIRED
❑ 1 BUILDING
MHAEBERLE@VAILGOV.COM VIEW CHECKLIST
LAN REVIEW AND/OR ASSIGNMENT COMPLETE
JOE BATCHELLER A Floodplain Use Permit is needed before issuing an building permit.
0 1 PLANNING CORRECTIONS REQUIRED
Relocate the gas meter within the first third of the house and
JBATCHELLER@VAILGOV.COM adequately protect with the roof cave(at least 4').
r--�
^ LAN REVIEW AND/OR ASSIGNMENT COMPLETE
LEONARD SANDOVAL APPROVED
❑ 1 PUBLIC WORKS
haps://vaileplans.magnetserver.com/Projectdox/workfloweforms/353_354_3.aspx?LaunchMode=new&F1owTaskID=1674[5/22/2014 4:24:41 PM]
ProjectDox Plan Review Form
LSANDOVAL@VAILGOV.COM VIEW CHECKLIST
D'LAN REVIEW AND/OR ASSIGNMENT COMPLETE
Task Instructions
❑ I have reviewed and addressed the Checklist Comments provided on the"Checklist'tab above.Please click on the tab and review each item.Each comment will be indicated as
"Met"or"Not Met".If you would like to export a list of the comments to Excel,click on the"Export to Excel"link in the upper right hand corner of the popup window.
❑ I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
❑ I have uploaded the revised drawings into the"Drawings"folder and,if requested,uploaded any revised documents into the"Documents"folder using the SAME file name as the
original files.I am ready to complete my assigned task.
Complete Save And Close
Building Process V1
https://vaileplans.magnetserver.com/Projectdox/workfloweforms/353_354_3.aspx?LaunchMode=new&FlowTaskID=1674[5/22/2014 4:24:41 PM]