Loading...
HomeMy WebLinkAboutB14-0153_Response letter to BLDG Dept - architectural items_1400796060.pdf MARTIN MANLEY ARCHITECTS Date: 05-12-2014 Town of Vail Building Department RE: Response to Building Dept. Comments on Hoyt-Young PRJ13-0706 B14-0153 Dear TOV BUILDING DEPARTMENT, SHEET A0.0 COMMENT:75% efficacy Response: Provide a 85% min. boiler COMMENT: 2"X2" Response: on all drawings SHEET A2.2 COMMENT: Handrail at stair from Deck to grade on south side of house. Response: It is the intent that a graspable steel handrail (3'-0" above stair nosing) will be placed between the newels on the west side of the stair. SHEET A3.1 COMMENT: Class 'A' rating on asphalt shingle Response: Asphalt shingles are to be installed to meet Class 'A' fire rating COMMENT: Gas Meter location Response: The gas meter was moved to adjacent to the garage man door. This is shown on the site plan and noted on the elevation. The 'OLD' note and arrow showing the previous location was not removed from the drawing on sheet A3.1. The roof overhang is extended to 4'-0" above the meter. COMMENT: Protection of Elec meter closet, phone/cable Response: The Meter Closet is on the west side wall of the garage and under the overhangs. The meters will be protected and screened by a wood clad door. The roof is to receive gutters and heat tape at this area. The area directly below/in front of the closet is paved and will be maintained as a parking area for the outside parking space. 970.328.5151 info@martinmanleyarchitects.com martinmanleyarchitects.com P.O.Box 1587 Eagle,Colorado 81631