Loading...
HomeMy WebLinkAboutB14-0325_B14-0325 REV2 HP Geotech report_1419271260.pdf 1-4 I h I, i' I r (.,,. ' fn , ect , ,,. „ , , -, ,,„. .t ,, , ,, ,,,..,, i-iEPWORTH-PAWLU.i< GEOTECHNICA LLLL. + December 19, 2014 Desmond Home Builders Attn: Bryan Desmond P.O. Box 3518 Eagle, Colorado 81631 hivut qxl tnonclhomebuilders.cout Job No. 114 189A Subject: Observation of Excavation, Northern Portion of Proposed Duplex, Lot 2, Bighorn Estates, 4288 Nugget Lane, Vail, Colorado Dear Bryan: As requested, a representative of Hepworth-Pawlak Geotechnical, Inc. observed the excavation at the subject site on December 18, 2014 to evaluate the soils exposed for foundation support. The findings of our observations and recommendations for the foundation design are presented in this report. The services were supplemental to our proposal for professional engineering services to Desmond Home Builders, dated May 14, 2014. We previously observed the southern portion of the excavation and presented our findings in a report dated October 14, 2014, Job No. 114 189A. The duplex will be a multilevel structure cut into and retaining the hillside slope. Ground floors will be slab-on-grade. The foundation design for the building was based on a previous soil and foundation investigation at the site by LKP Engineering dated October 1, 2003, Project No. 03148. The report recommended spread footings designed using an allowable soil bearing pressure of 1,500 psf for foundation support. We have been provided a copy of that report. The foundation excavation for the building was done in two phases with the southern portion done previously and the northern portion completed currently. At the time of our site visit, the foundation excavation for the northern portion of the building had been cut in three levels from about 5 to 15 feet below the adjacent ground surface. The soils exposed in the bottom of the excavation consisted of medium dense, silty sand with gravel and scattered cobbles and boulders. Completed footing excavation Pmkt:r 03.641-7119 • ( ul(nratio pnnu719-633-5562 • Silveri hum,- Q70.-0-1969 Desmond Home Builders December 19,2014 Page 2 areas had been compacted using a remote controlled vibratory double drum roller. Results of swell-consolidation testing performed on a sample taken from the site, shown on Figure 1, indicate the soils are slightly to moderately compressible under conditions of loading and wetting. No free water was encountered in the excavation and the soils were moist. Considering the conditions exposed in the excavation and the nature of the proposed construction, spread footings placed on the undisturbed natural soil designed for an allowable bearing pressure of 1,500 psf can be used for support of the proposed building. The exposed soils tend to compress especially when wetted under loading and there could be some post-construction settlement of the foundation if the bearing soils become wet, and precautions should be taken to prevent wetting. Footings should be a minimum width of 16 inches for continuous walls and 2 feet for columns. Any loose or disturbed soils in footing areas should be removed or re-compacted. The bearing soils should be protected against frost and concrete should not be placed on frozen soils. Exterior footings should be provided with adequate soil cover above their bearing elevations for frost protection. Continuous foundation walls should be well reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining structures should also be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 55 pcf for on-site soil as backfill. A perimeter foundation drain should be provided to prevent temporary buildup of hydrostatic pressure behind the basement walls and prevent wetting of the lower level. Structural fill placed within floor slab areas can consist of the on-site soils compacted to at least 95%of standard Proctor density(SPD) at near optimum moisture content. Backfill placed around the structure should be compacted to at least 90% SPD and the surface graded to prevent ponding within at least 10 feet of the building. The recommendations submitted in this letter are based on our observation of the soils exposed within the foundation excavation and do not include subsurface exploration to evaluate the subsurface conditions within the loaded depth of foundation influence. This study is based on the assumption that soils beneath the footings have equal or better support than those exposed. The risk of foundation movement may be greater than indicated in this report because of possible variations in the subsurface conditions. In order to reveal the nature and extent of variations in the subsurface conditions below the Job No. 114 189A GLZtech Desmond Home Builders December 19, 2014 Page 3 excavation, drilling would be required. It is possible the data obtained by subsurface exploration could change the recommendations contained in this letter. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. We should observe the foundation excavation for the northern portion of the building when complete. If you have any questions or need further assistance,please call our office. Sincerely, HEPWORTH—PAWLAK GEOTECHNICAL, INC. Thomas J. Westhoff, CET Reviewed by: pvd 4r/k,',444,3 44*-- 1. { i Steven L. Pawlak, P.E. " re, ° a�, u jV l , • / TJW/ksw ,4 ,.fig /. v.,,� • � • Attachment: Figure 1, Swell-Corr ration Test Results Job No. 114 189A. Gtech