HomeMy WebLinkAboutB14-0326_Nugget_M1.3_1415828400.pdfBBQ
(natural
gas)
BBQ
(natural
gas)
Top of Third Level
Subfloor EL. 111'-0"
Top of Third Level
Subfloor EL. 110'-6"
Top of Master Level
Subfloor EL. 112'-6"
Top of Third Level
Subfloor EL. 110'-6"
1/2" CSST
1/2" CSST
1/2" CSST
1/2" CSST
3/4" CSST
1/2" CSST
1/2" CSST
MAKE-UP AIR DAMPER
THRU WALL
"BROEN" MD8T 8" X 11"
WALL REGISTER (A.O.)
MAKE-UP AIR DAMPER
INTER-CONNECTION FOR
"BROEN" E64000 SERIES
10" KITCHEN HOOD
VENT THOUGH WALL
MAKE-UP AIR DAMPER
THRU WALL
"BROEN" MD8T 8" X 11"
10" KITCHEN HOOD
VENT THOUGH WALL
BATH VENTS THRU WALL
BATH VENTS THRU WALL
PWD VENT THRU WALL
PWD VENT THRU WALL
CLASS "B" VENT THRU ROOF
RE: MFG.
RADON MITIGATION
(VTR)
RADON MITIGATION
(VTR)
CLASS "A" VENT THRU ROOF
RE: MFG.
CLASS "A" VENT THRU ROOF
RE: MFG.
GAS FIREPIT
GAS FIREPIT
1/2" CSST
1/2" CSST
3/4" CSST
AS FOLLOWS: VERIFY WITH RADON TEST AND INSTALLER.
IF REQ'D, MITIGATION FANS MAY
BE INSTALLED IN ATTIC SPACE ABV.
DRYER VENT THRU WALL
DRYER VENT THRU WALL
UNDERGRND PE TUBING
UNDERGRND PE TUBING
(VTR)
MITIGATION FAN VENT
(VTR)
MITIGATION FAN VENT
UNITS A & B
3rd LEVEL MECHANICAL
SCALE 1/4 " = 1' - 0"
M1.3
N U G G E T P R O P E R T I E S , L L C
4 2 8 8 N U G G E T L A N E
L O T 2 B I G H O R N E S T A T E S
T O W N O F V A I L, C O L O R A D O
N U G G E T L A N E D U P L E X
FIRST LEVEL MECH.
08 29 14
date
3/4 gas line
30 minute timer
11/12/14