Loading...
HomeMy WebLinkAboutB14-0326_Nugget_M1.3_1415828400.pdfBBQ (natural gas) BBQ (natural gas) Top of Third Level Subfloor EL. 111'-0" Top of Third Level Subfloor EL. 110'-6" Top of Master Level Subfloor EL. 112'-6" Top of Third Level Subfloor EL. 110'-6" 1/2" CSST 1/2" CSST 1/2" CSST 1/2" CSST 3/4" CSST 1/2" CSST 1/2" CSST MAKE-UP AIR DAMPER THRU WALL "BROEN" MD8T 8" X 11" WALL REGISTER (A.O.) MAKE-UP AIR DAMPER INTER-CONNECTION FOR "BROEN" E64000 SERIES 10" KITCHEN HOOD VENT THOUGH WALL MAKE-UP AIR DAMPER THRU WALL "BROEN" MD8T 8" X 11" 10" KITCHEN HOOD VENT THOUGH WALL BATH VENTS THRU WALL BATH VENTS THRU WALL PWD VENT THRU WALL PWD VENT THRU WALL CLASS "B" VENT THRU ROOF RE: MFG. RADON MITIGATION (VTR) RADON MITIGATION (VTR) CLASS "A" VENT THRU ROOF RE: MFG. CLASS "A" VENT THRU ROOF RE: MFG. GAS FIREPIT GAS FIREPIT 1/2" CSST 1/2" CSST 3/4" CSST AS FOLLOWS: VERIFY WITH RADON TEST AND INSTALLER. IF REQ'D, MITIGATION FANS MAY BE INSTALLED IN ATTIC SPACE ABV. DRYER VENT THRU WALL DRYER VENT THRU WALL UNDERGRND PE TUBING UNDERGRND PE TUBING (VTR) MITIGATION FAN VENT (VTR) MITIGATION FAN VENT UNITS A & B 3rd LEVEL MECHANICAL SCALE 1/4 " = 1' - 0" M1.3 N U G G E T P R O P E R T I E S , L L C 4 2 8 8 N U G G E T L A N E L O T 2 B I G H O R N E S T A T E S T O W N O F V A I L, C O L O R A D O N U G G E T L A N E D U P L E X FIRST LEVEL MECH. 08 29 14 date 3/4 gas line 30 minute timer 11/12/14