HomeMy WebLinkAboutB14-0429_S2.2b_1461015960.pdfAB
A B C D
A B.1 C.1
D.1
1
2
3
4
5
6
7
1
1
1
AB
1
Partial Entry Level Floor Framing Plan
S2.2 b
Title
Framing Plan
Entry Level Floor
Sundquist
SDG
JDS
Date
Checked By
Drawn By
SDG Project No.
Date Issue
Progress Set
14-073
10/09/14
07/08/2015
Progress Set
10/17/14
Construction
10/20/14
Revision # 1
11/30/14
1
As-Built Conditions
07/08/15
AB
04/18/16