HomeMy WebLinkAbout2745 Snowberry Blower Door Test-East Unit.pdf Department of Community Development
75 South Frontage Road
Vail, CO 81657
TOWN OF is t Tel:970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
Application/Permit#(s)information applies
to: Attention: (0 Revisions
C Response to Correction Letter
3/ O d oZ L rl attached copy of correction letter
0 Deferred Submittal
5/6- 04 2l Other Thtower-D6Or-7e9F
Project Street Address: ;�
S 5-5-s,i aAihtrry Mitt_
_
(Number) (Street) (Suite#) _... __. _. • ..._ _._. ......
Building/Complex Name: Description of Transmittal/List of Changes, Items Attached:Applicant Information CIO o r �2 T `r"� r--
(architect,
(architect,contractor,owner/owners
.rep)
// t c� 1
Contact Name: V �
'-" ZAry - Ca ie,$!/OOHO �� �� oZ-—I S.� J/y OWG�r �
Address: �� !3 C)o�- Z TJ 2 Z 'ilii. 'J e "e...".�o °� ��
City Ar Ori- State: C-d .Zip: Ris g '-''0
Contact Name: D�/e,..yf�13i 4 4-4.1"5_ (use additional sheet if necessary)
gY-
Contact Phone: L - 0 3 1-6b G I I I. Building Permits:
/ n J� J ®_� Revised ADDITIONAL Valuations(Labor&Materials)
Contact E-Mail: a!/e (c✓ Gr' orQ/t'7"e",5. Go �^-(DO NOT include original valuation)
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing:
comply with the information and plot plan,to comply with all Town
ordinances and state laws, and to build this structure according Electrical: $
to the town's zoning and subdivision codes, design review ap-
proved,International Building and Residential Codes and other Mechanical: $
ordinances of the Tgw�applicable thereto.
T"�-" Total $0
Owner/Owner's Representative Signature(Required) ._._. __..___..__� .____. ._............
Date Received:
For Office Use Only:
Fee Paid:
Received From:
Cash Check#
CC: Visa/MC Last 4 CC# exp.date:
Authorization#
ACTIVE
ENERGIES, .
2745 Snowberry Drive
Blower Door Report
- Test Date: November 2,2016
- k R <` Builder: DW Dantas Construction
" + Contact Dave Dantas
7
'l ! - Site Address: 2745 Snowberry Drive, Vail, CO
my , - Site •Visit By: Megan Gilman
r, 111
c ‘
Background
The project goal is to undergo testing at final construction to determine the final amount of air
infiltration and identify any weak areas or difficult details for correction. The project is located
in the Town of Vail, where the current code requires an air tightness of 3 ACHso or less. Active
Energies was contracted to perform a final blower door test to determine total air infiltration.
Site Observations
The project site consists of two separate, attached residences. This testing was for only the East
unit. Construction of the building envelope was complete. All exterior openings were shut and
locked and interior doors were open. No alterations were made to any openings on the exterior
of the home. The blower door test was performed in the doorway between the garage and the
main area of the home. The pressure probe place outside.
Diener Door Test
The home was depressurized, utilizing blower door testing equipment to a pressure of-50 Pa. At
the test pressure,the CFM50 was recorded, in order to determine the ACH50.
The blower door air leakage resulted in the following measurements: 1.3 ACHso
Please call with any questions or concerns.
w
Page 1 of 1 11/3/2016
P.O.Box 7627,Avon,CO 81620 I P: 970.306.4233 1 F: 866.403.3485 I www.activeenergies.com