Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
print_page_08-30-2016_57c62039c3cbe-0.pdf
PERMITS MANAGEMENT Create New Inspection: Project: Mountain C.I. Holdings LTD 2015 Select options Create Go to Main Inspection Grid 1 + 1 + 1 + 1 + Inspections Checklist Edit Info Schedule Prerequisites Schedule Inspection Electrical Final (Electrical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Blower Door Test (Blower Door Test (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Public Works Final (Public Works Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Planning Final (Planning Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued 1 + 1 + 1 + 1 2 + 1 + 1 2 3 + 1 2 + 1 + 1 + 1 + Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Plumbing Final (Plumbing Final (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis Mechanical Final (Mechanical Final (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis Rough Mechanical (Rough Mechanical (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Dry Wall Dry Wall ((PassPass))Inspector: Inspector: Charlie DavisCharlie Davis MECH-Rough (MECH-Rough (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis BLDG-Insulation (BLDG-Insulation (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon MECH-Rough (MECH-Rough (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon PLMB-Rough/D.W.V. (PLMB-Rough/D.W.V. (PassPass))Inspector: Inspector: shaneshane PLMB-Rough/Water (PLMB-Rough/Water (PassPass))Inspector: Inspector: shaneshane 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + PLAN-ILC FRAMING (PLAN-ILC FRAMING (PassPass))Inspector: Inspector: Chris NeubeckerChris Neubecker BLDG-Foundation/Steel (BLDG-Foundation/Steel (PassPass))Inspector: Inspector: Martin HaeberleMartin Haeberle BLDG-Framing (BLDG-Framing (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle PLAN-ILC FRAMING (PLAN-ILC FRAMING (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle PLAN-ILC FRAMING (PLAN-ILC FRAMING (FailFail))Inspector: Inspector: Chris NeubeckerChris Neubecker BLDG-Framing (BLDG-Framing (FailFail))Inspector: Inspector: shaneshane MECH-Rough (MECH-Rough (PassPass))Inspector: Inspector: shaneshane ELEC-Rough (ELEC-Rough (PassPass))Inspector: Inspector: shaneshane MECH-Rough (MECH-Rough (FailFail))Inspector: Inspector: shaneshane BLDG-Sheetrock Nail (BLDG-Sheetrock Nail (FailFail))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon PLMB-Gas Piping (PLMB-Gas Piping (PassPass))Inspector: Inspector: shaneshane PLMB-Rough/D.W.V. (PLMB-Rough/D.W.V. (PassPass))Inspector: Inspector: shaneshane 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + PLMB-Gas Piping (PLMB-Gas Piping (PassPass))Inspector: Inspector: shaneshane PLMB-Rough/Water (PLMB-Rough/Water (PassPass))Inspector: Inspector: shaneshane MECH-Rough (MECH-Rough (FailFail))Inspector: Inspector: shaneshane PLMB-Underground (PLMB-Underground (PassPass))Inspector: Inspector: shaneshane PLAN-ILC Foundation Plan (PLAN-ILC Foundation Plan (PassPass))Inspector: Inspector: Jonathan SpenceJonathan Spence MECH-Rough (MECH-Rough (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle PLMB-Underground (PLMB-Underground (FailFail))Inspector: Inspector: shaneshane BLDG-Foundation/Steel (BLDG-Foundation/Steel (FailFail))Inspector: Inspector: shaneshane Special Inspect-progress rept (Special Inspect-progress rept (FailFail))Inspector: Inspector: shaneshane ELEC-Service (ELEC-Service (FailFail))Inspector: Inspector: shaneshane BLDG-FOOTING (BLDG-FOOTING (FailFail))Inspector: Inspector: shaneshane Special Inspect-progress rept (Special Inspect-progress rept (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle