Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
print_page_11-15-2016_582b7b422d6a4-0.pdf
PERMITS MANAGEMENT Create New Inspection: Project: Mountain C.I. Holdings LTD 2015 Select options Create Go to Main Inspection Grid 1 + 1 + 1 + 1 2 + 1 + 1 2 + Inspections Electrical Final (Electrical Final (PassPass))Inspector: Inspector: Jeff MathewsJeff Mathews Checklist Edit Info Schedule Prerequisites Schedule Inspection Blower Door Test (Blower Door Test (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Public Works Final (Public Works Final (PassPass))Inspector: Inspector: Leonard SandovalLeonard Sandoval Planning Final (Planning Final (PassPass))Inspector: Inspector: Chris NeubeckerChris Neubecker Checklist Edit Info Schedule Prerequisites Schedule Inspection Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Re-Schedule Inspection Record Results Plumbing Final (Plumbing Final (UninspectedUninspected))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Info Status Scheduled Cancel Inspection Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel 1 2 + 1 2 + 1 + 1 2 3 + Florencio (JR) Mondragon at 11/15/2016 01:41:07 pm Approved Florencio (JR) Mondragon at 11/15/2016 01:41:49 pm Inspector Signature Florencio (JR) Mondragon at 11/15/2016 01:41:49 pm Applicant Signature Requested Date 08/01/2016 Inspection Date 11/15/2016 Inspection Time Morning Schedule Notes Final Plumb/Heat (North side_ Chris 390-7241 Result comments Send Notification Checklist Edit Info Re-Schedule Inspection Record Results Mechanical Final (Mechanical Final (UninspectedUninspected))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Info Status Scheduled Cancel Inspection Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Requested Date 08/01/2016 Inspection Date 11/15/2016 Inspection Time Morning Schedule Notes Final Plumb/Heat (North side_ Chris 390-7241 Result comments Send Notification Rough Mechanical (Rough Mechanical (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Dry Wall Dry Wall ((PassPass))Inspector: Inspector: Charlie DavisCharlie Davis 1 2 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + MECH-Rough (MECH-Rough (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis BLDG-Insulation (BLDG-Insulation (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon MECH-Rough (MECH-Rough (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon PLMB-Rough/D.W.V. (PLMB-Rough/D.W.V. (PassPass))Inspector: Inspector: shaneshane PLMB-Rough/Water (PLMB-Rough/Water (PassPass))Inspector: Inspector: shaneshane PLAN-ILC FRAMING (PLAN-ILC FRAMING (PassPass))Inspector: Inspector: Chris NeubeckerChris Neubecker BLDG-Foundation/Steel (BLDG-Foundation/Steel (PassPass))Inspector: Inspector: Martin HaeberleMartin Haeberle BLDG-Framing (BLDG-Framing (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle PLAN-ILC FRAMING (PLAN-ILC FRAMING (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle PLAN-ILC FRAMING (PLAN-ILC FRAMING (FailFail))Inspector: Inspector: Chris NeubeckerChris Neubecker BLDG-Framing (BLDG-Framing (FailFail))Inspector: Inspector: shaneshane MECH-Rough (MECH-Rough (PassPass))Inspector: Inspector: shaneshane 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + ELEC-Rough (ELEC-Rough (PassPass))Inspector: Inspector: shaneshane MECH-Rough (MECH-Rough (FailFail))Inspector: Inspector: shaneshane BLDG-Sheetrock Nail (BLDG-Sheetrock Nail (FailFail))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon PLMB-Gas Piping (PLMB-Gas Piping (PassPass))Inspector: Inspector: shaneshane PLMB-Rough/D.W.V. (PLMB-Rough/D.W.V. (PassPass))Inspector: Inspector: shaneshane PLMB-Gas Piping (PLMB-Gas Piping (PassPass))Inspector: Inspector: shaneshane PLMB-Rough/Water (PLMB-Rough/Water (PassPass))Inspector: Inspector: shaneshane MECH-Rough (MECH-Rough (FailFail))Inspector: Inspector: shaneshane PLMB-Underground (PLMB-Underground (PassPass))Inspector: Inspector: shaneshane PLAN-ILC Foundation Plan (PLAN-ILC Foundation Plan (PassPass))Inspector: Inspector: Jonathan SpenceJonathan Spence MECH-Rough (MECH-Rough (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle PLMB-Underground (PLMB-Underground (FailFail))Inspector: Inspector: shaneshane 1 + 1 + 1 + 1 + BLDG-Foundation/Steel (BLDG-Foundation/Steel (FailFail))Inspector: Inspector: shaneshane Special Inspect-progress rept (Special Inspect-progress rept (FailFail))Inspector: Inspector: shaneshane ELEC-Service (ELEC-Service (FailFail))Inspector: Inspector: shaneshane BLDG-FOOTING (BLDG-FOOTING (FailFail))Inspector: Inspector: shaneshane Special Inspect-progress rept (Special Inspect-progress rept (FailFail))Inspector: Inspector: Martin HaeberleMartin Haeberle