HomeMy WebLinkAboutB15-0021_Response letter_1428592380.pdf Date: 04-08-2015 Town of Vail Building Department RE: Response to Building Dept. Comments on Snowberry Lot 10 PRJ14-0638 B15-0020 and PRJ14-0638 B15-0021 SHEET A0.0 COMMENT: Provide actual square footage.. no GRFA or garage deductions Response: (Also shown on sheet A0.0) TOTAL AREA OF WEST UNIT, INCLUDING THE GARAGE, WITH NO REDUCTIONS = LOWER LEVEL =1,987 S.F. MAIN LEVEL =2,829 S.F. UPPER LEVEL = 450 S.F. TOTAL AREA =5,266 S.F. TOTAL AREA OF EAST UNIT, INCLUDING THE GARAGE, WITH NO REDUCTIONS = LOWER LEVEL =1,372 S.F. MAIN LEVEL =2,061 S.F. UPPER LEVEL =1,578 S.F. TOTAL AREA =5,011 S.F. COMMENT: 75% of all lighting shall be high efficacy type Response: Note revised to read GENERAL CONTRACTOR TO MEET 2012 IRC REQUIREMENT SECTION N1104.1 LIGHTING EQUIPMENT: A MINIMUM OF 75 PERCENT OF THE LAMPS IN PERMANENTLY INSTALLED LIGHTING FIXTURES SHALL BE HIGH-EFFICACY LAMPS. COMMENT: Blower door test required Response: BLOWER DOOR TEST N1102.4.1.2 (R402.4.1.2) Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour in Zones 1 and 2, and 3 air changes per hour in Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the building official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the building official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. COMMENT: local code amendment requires .30 u values unless weighted averageEprovide calculations Response: Matrix has been corrected to show .30 u value SHEET A1.1 COMMENT: provide detail for guardrail Response: Guardrail at street Detail 2A1.1 has been added to the sheet SHEET A2.1 COMMENT: Boiler efficacy?? BTU No Mech Plan submitted Response: 96.6% efficient, 250,000 BTU SHEET S5, S4 COMMENT: Please submit Stamped truss drawings, specs, layout design Response: drawings by Alpine Lumber have been provided as supplemental information Sheet S5 and S4 have been updated to coordinate with truss information