Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
print_page_08-30-2016_57c6207b690e7-0.pdf
PERMITS MANAGEMENT Create New Inspection:Select options Create Go to Main Inspection Grid 1 + 1 + 1 + 1 + Inspections Checklist Edit Info Schedule Prerequisites Schedule Inspection Electrical Final (Electrical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Blower Door Test (Blower Door Test (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Plumbing Final (Plumbing Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Mechanical Final (Mechanical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel 1 + 1 + 1 + 1 2 + 1 2 + 1 + 1 2 + Checklist Edit Info Schedule Prerequisites Schedule Inspection Public Works Final (Public Works Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Planning Final (Planning Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/26/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Dry Wall Dry Wall ((PassPass))Inspector: Inspector: Charlie DavisCharlie Davis Batt Insulation (Batt Insulation (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Lath (Lath (PassPass))Inspector: Inspector: Outside ResourceOutside Resource 1 2 3 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + Major Framing (Major Framing (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon ELEC-Rough (ELEC-Rough (PassPass))Inspector: Inspector: Outside ResourceOutside Resource ELEC-Service (ELEC-Service (PassPass))Inspector: Inspector: shaneshane PLAN-ILC FRAMING (PLAN-ILC FRAMING (PassPass))Inspector: Inspector: Chris NeubeckerChris Neubecker PLMB-Gas Piping (PLMB-Gas Piping (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon BLDG-Sheetrock Nail (BLDG-Sheetrock Nail (FailFail))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon MECH-Rough (MECH-Rough (FailFail))Inspector: Inspector: shaneshane BLDG-Foundation/Steel (BLDG-Foundation/Steel (PassPass))Inspector: Inspector: shaneshane PLAN-ILC Foundation Plan (PLAN-ILC Foundation Plan (PassPass))Inspector: Inspector: Jonathan SpenceJonathan Spence BLDG-Foundation/Steel (BLDG-Foundation/Steel (PassPass))Inspector: Inspector: Martin HaeberleMartin Haeberle BLDG-FOOTING (BLDG-FOOTING (FailFail))Inspector: Inspector: shaneshane BLDG-Foundation/Steel (BLDG-Foundation/Steel (PassPass))Inspector: Inspector: shaneshane