Loading...
HomeMy WebLinkAboutB15-0035_B15-0035 special inspection report_1450221120.pdfFINAL REPORT OF SPECIAL INSPECTIONS Project: Bathgate Remodel Permit Number: B 15 -0 0 3 5 Project Location: 1543 Matterhorn Circle, #7 Owner Margaret Bathgate Address 6376 E. Tufts Lane City:Englewood Zip: CO 80111 Special Inspections Agency Desi§A PFOfessieAal ffi-Ghafg&.: GROUND Engineering Consul tan ts, Inc. Address: PO Box 4 6 4 City: Gypsum Fax: ( 970) 524 -0721 State: _c_o ____ Zip: 81637 Phone: (970) 524-0720 E-mail: chr is . hut to@qroundeng.com carl.henderson@groundeng.com To the best of my information, knowledge, and belief, the special inspections and/or testing required for this project, have been completed in accordance with the contract documents. Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be considered an integral part of this final report. Any discrepancies that were noted in all interim reports have been corrected. *Open Hole and Drilled Epoxied Rebar Only *Please see "15-6527.Bathgate-Matl.Reports.All.151215" Prepared by: Carl Henderson, P.E. 12-15-15 Date Preparer's Seal and Signature Required -12- DRDUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Job No: 15-6527 Date: May 5, 2015 General Comments As scheduled, a representative arrived on-site to perform the below discussed services and we have the following comments. ***OPEN HOLE*** The exposed materials at the base of the excavation for the foundation underpin for New Bedroom #5 and Dining Room expansion were observed. At an elevations of approximately 89'-7" and 95'-0'', respectively, the exposed materials were comprised of Sand and Gravel that were generally consistent with the anticipated conditions as outlined in the project geotechnical report prepared by HP Geotech dated November 21, 1994. The exposed materials were prepared in accordance with project documents. Warren with JL Viele was immediately notified of today's observations. Field Representative: Shane Sorensen Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper llRDUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Drill and Epoxy Cover Report Date: May 5, 2015 Job Number: 15-6527 General Contractor: Rep. Notified: As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: 1 Field Representative: Shane Sorensen www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper II ROUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Report Date: May 5, 2015 General Contractor: Viele Subcontractor: N/A Documents Used: Plans Drilling Drill and Epoxy Location: 1.) Dowels into existing footings for Dining Room expansion (6 holes) 2.) 3.) 4.) Orientation (vertical/horizontal): 1.) 2.) Horizontal Job Number: 15-6527 Rep. Notified: Warren Rep. Notified: N/A 3.) 4.) Hole Diameter (inches): 1.) 3/4 Length (inches): 1.) 2.) 3.) 4.) Hole Spacing (inches): 1.) 2.) Drilling Equipment: Hammer drill Method to Clean Hole: Wire brush, compressed air Epoxy 8 Epoxy Type: Powers Fasteners Quick-ShotAC100+ Gold Epoxy Expiration: March 2016 Placement Method: Caulk gun Reinforcement 2.) 3.) 4.) 3.) 4.) 6 Type (rebar/bolt/anchor): 1.) Rebar Size: 1.) #5 Length (inches) 1.) 2.) 3.) 4.) Placement Method: Hand set Additional Reinforcing Steel: N/A Field Representative: Shane Sorensen Comments: 2.) 3.) 4.) www.groundeng.com 2.) 3.) 4.) Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper 42 &ROUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Drill and Epoxy Cover Report Date: May 8, 2015 Job Number: 15-6527 General Contractor: JL Viele Rep. Notified: Warren As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. Comments or Photos: Yes No Discrepancies Reported this Date? cj Ci' No. of Pages Attached: 1 Field Representative: Shane Sorensen www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper DRDUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Report Date: May 8, 2015 General Contractor: JL Viele Subcontractor: GS Concrete Documents Used: Plans Drilling Drill and Epoxy Location: 1.) Dowel into existing foundation wall for Dining Room expansion 2.) Bedroom #5 foundation underpinning (east side) 3.) 4.) Orientation (vertical/horizontal): 1.) 2.) Horizontal Vertical Job Number: 15-6527 Rep. Notified: Warren Rep. Notified: Alfonso 3.) 4.) Hole Diameter (inches): 1.) 3/4 Length (inches): 1.) 2.) 3/4 3.) 4.) Hole Spacing (inches): 1.) 16,4 2.) 12 Drilling Equipment: Hammer drill Method to Clean Hole: Wire brush, compressed air Epoxy Epoxy Type: Powers Fasteners Quick-ShotAC100+ Gold Epoxy Expiration: March 2016 Placement Method: Caulk gun Reinforcement 2.) 3.) 4.) 3.) 4.) 6 8 Type (rebar/bolt/anchor): 1.) 2.) 3.) 4.) Rebar Size: 1.) #5 #5 Length (inches) 1.) Placement Method: Hand set Additional Reinforcing Steel: N/A Rebar Field Representative: Shane Sorensen Comments: 2.) 3.) 4.) www.groundeng.com 2.) 3.) 4.) Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper 78, 108 36 DRDUND Client: Ms. Lindsey Kraft JL Viele Construction Company ENGINEERING CONSULTANTS 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Drill and Epoxy Cover Report Date: May 11, 2015 Job Number: 15-6527 General Contractor: JL Viele Rep. Notified: Warren As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. Comments or Photos: ~~. "l!;~·' '*~· Yes No Discrepancies Reported this Date? No. of Pages Attached: 1 Field Representative: Shane Sorensen www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper &ROUND Client: Ms. Lindsey Kraft JL Viele Construction Company ENGINEERING CONSULTANTS 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Report Date: May 11, 2015 General Contractor: JL Viele Subcontractor: GS Concrete Documents Used: Plans Job Number: 15-6527 Rep. Notified: Warren Rep. Notified: Francisco Drill and Epoxy Drilling Location: 1.) Bedroom #5 foundation underpinning (west side) 2.) 3.) 4.) Orientation (vertical/horizontal): Hole Diameter (inches): Hole Spacing (inches): Drilling Equipment: Hammer drill 1.) 2.) 1.) 2.) 3.) 4.) 1.) 2.) Method to Clean Hole: Wire brush, compressed air Epoxy Vertical 3/4 12 Epoxy Type: Powers Fasteners Quick-ShotAC100+ Gold Epoxy Expiration: March 2016 Placement Method: Caulk gun Reinforcement 3.) 4.) Length (inches): 1.) 2.) 3.) 4.) 3.) 4.) 8 Type (rebar/bolt/anchor): 1.) Rebar Size: 1.) #5 Length (inches) 1.) 2.) 3.) 4.) Placement Method: Hand set Additional Reinforcing Steel: N/A Field Representative: Shane Sorensen 2.) 3.) 4.) 2.) 3.) 4.) 24 Comments: Plans call for 36" bars to be used as dowels. We are awaiting correspondence from the structural engineer approving 24" bars to be used due to lack of clearance. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper &ROUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Job No: 15-6527 Date: May 22, 2015 General Comments As scheduled, a representative arrived on-site to perform the below discussed services and we have the following comments. ***OPEN HOLE*** The exposed materials at the base of the excavation for the southern footers and foundation wall at bedroom # 5 were observed. At an elevation of approximately 90' to 97', the exposed materials were comprised of silty sand with gravel, cobbles, and boulders that were generally consistent with the anticipated conditions as outlined in the project geotechnical report prepared by Hepworth-Pawlak Geotechnical, Inc. dated November 21, 1994. The exposed materials were prepared in accordance with project documents. Warren with Viele Construction was immediately notified of today's observations. Field Representative: Matt Raczewski Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper DRDUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Drill and Epoxy Cover Report Date: May 22, 2015 Job Number: 15-6527 General Contractor: JL Viele Construction Rep. Notified: Warren As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: 2 Field Representative: Shane Sorensen www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper &ROUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Comments Date: May 22. 2015 Job Number: 15-6527 General Contractor: JL Viele Construction Rep. Notified: Warren Additional Comments or Photos: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper BRDUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Report Date: May 22, 2015 General Contractor: JL Viele Construction Subcontractor: GS Concrete Documents Used: Plans Drilling Drill and Epoxy Location: 1.) Dowels into existing floor slab for Dining Room expansion 2.) Bedroom #5 dowels into existing foundation wall 3.) 4.) Orientation (vertical/horizontal): 1.) Horozontal 2.) Job Number: 15-6527 Rep. Notified: Warren Rep. Notified: Francisco 3.) 4.) Hole Diameter (inches): 1.) 3/4 Length (inches): 1.) 2.) 3/4 3.) 4.) Hole Spacing (inches): 1.) 12 2.) 12 Drilling Equipment: Hammer drill Method to Clean Hole: Wire brush, compressed air Epoxy Epoxy Type: Powers Fasteners Quick-Shot AC100+ Gold Epoxy Expiration: March 2016 Placement Method: Calk gun Reinforcement 2.) 3.) 4.) 3.) 4.) Horozontal 61/2 6 1/4 Type (rebar/bolt/anchor): 1.) 2.) 3.) 4.) Rebar Size: 1.) 5 5 Length (inches) 1.) Placement Method: Hand set Additional Reinforcing Steel: N/A Rebar Field Representative: Shane Sorensen Comments: 2.) 3.) 4.) www.groundeng.com 2.) 3.) 4.) Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper 36 36 DRDUND ENGINEERING CONSULTANTS Client: Ms. Lindsey Kraft JL Viele Construction Company 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Drill and Epoxy Cover Report Date: August 14, 2015 Job Number: 15-6527 General Contractor: JL Viele Construction Rep. Notified: Warren As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. Discrepancies Reported this Date? No. of Pages Attached: 1 Field Representative: Shane Sorensen www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper Client: Ms. Lindsey Kraft DRDUND JL Viele Construction Company ENGINEERING CONSULTANTS 2111 N. Frontage Road West, Suite E Vail, CO 81657 Bathgate Remodel -1543 Matterhorn Circle #7 Report Date: August 14, 2015 General Contractor: JL Viele Construction Subcontractor: GS Concrete Job Number: 15-6527 Rep. Notified: Warren Rep. Notified: N/A Documents Used: Plans page S2.0, site wall revision dated 7/29/15 Drill and Epoxy Drilling Location: 1.) Drilling into existing footing for site wall dowels at SW corner of foundation 2.) 3.) 4.) Orientation (vertical/horizontal): 1.) Hole Diameter (inches): Hole Spacing (inches): Drilling Equipment: Hammer drill 2.) 1.) 2.) 3.) 4.) 1.) 2.) Method to Clean Hole: Wire brush, compressed air Epoxy Epoxy Type: Red Head Epcon A7 Epoxy Expiration: 10-30-2015 Placement Method: Calk gun Reinforcement Type (rebar/bolt/anchor): 1.) 2.) 3.) 4.) Placement Method: Hand set Additional Reinforcing Steel: N/A Rebar Field Representative: Shane Sorensen 3/4 12 Vertical Length (inches): Size: 1.) 2.) 3.) 4.) #5 3.) 4.) 1.) 2.) 3.) 4.) 3.) 4.) Length (inches) 6 1.) 2.) 3.) 4.) 48 Comments: Plans call for 42" #5 rebar dowels. We measured dowels at 36" prior to installation. New rebar was then purchased, cut to 48" and installed. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper