Loading...
HomeMy WebLinkAboutprint_page_11-01-2016_5818cf47297c0-0.pdfPERMITS MANAGEMENT Create New Inspection:Select options Create Go to Main Inspection Grid 1 + 1 + 1 + Inspections Checklist Edit Info PLAN-FINAL (PLAN-FINAL (FailFail))Inspector: Inspector: Jonathan SpenceJonathan Spence Info at 03/03/2016 08:51:21 am Work not completed. Status Completed Estimated Duration No Duration Set! (Please update via the "Edit Info" tab) Permit Number Not Issued Parcel Requested Date Inspection Date 12/23/2015 Inspection Time Morning Date Completed Schedule Notes Result Fail Result comments Send NotificationInsert Re-Inspection Checklist Edit Info BLDG-Final (BLDG-Final (FailFail))Inspector: Inspector: shaneshane Info at 03/03/2016 08:51:21 am Planning ILC finish stucco exterior stair at bottom landing, max 7 3/4" riser max 3/8" differance at riser height stair width at 3rd floor minimum 31 1/2" Status Completed Estimated Duration No Duration Set! (Please update via the "Edit Info" tab) Permit Number Not Issued Parcel Requested Date Inspection Date 12/22/2015 Inspection Time Morning Date Completed Schedule Notes Result Fail Result comments Send NotificationInsert Re-Inspection MECH-Final (MECH-Final (FailFail))Inspector: Inspector: shaneshane 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + Checklist Edit InfoInfo at 03/03/2016 08:51:21 am finish fireplace Status Completed Estimated Duration No Duration Set! (Please update via the "Edit Info" tab) Permit Number Not Issued Parcel Requested Date Inspection Date 12/22/2015 Inspection Time Morning Date Completed Schedule Notes Result Fail Result comments Send NotificationInsert Re-Inspection PLMB-Final (PLMB-Final (PassPass))Inspector: Inspector: shaneshane ELEC-Final (ELEC-Final (PassPass))Inspector: Inspector: shaneshane ELEC-Final (ELEC-Final (FailFail))Inspector: Inspector: shaneshane ELEC-Rough (ELEC-Rough (PassPass))Inspector: Inspector: shaneshane ELEC-Rough (ELEC-Rough (PassPass))Inspector: Inspector: shaneshane MECH-Rough (MECH-Rough (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon BLDG-Sheetrock Nail (BLDG-Sheetrock Nail (PassPass))Inspector: Inspector: shaneshane BLDG-Insulation (BLDG-Insulation (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + BLDG-Foundation/Steel (BLDG-Foundation/Steel (PassPass))Inspector: Inspector: shaneshane PLMB-Gas Piping (PLMB-Gas Piping (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon PLMB-Rough/Water (PLMB-Rough/Water (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon BLDG-FOOTING (BLDG-FOOTING (PassPass))Inspector: Inspector: shaneshane ELEC-Rough (ELEC-Rough (PassPass))Inspector: Inspector: shaneshane BLDG-FOOTING (BLDG-FOOTING (PassPass))Inspector: Inspector: Martin HaeberleMartin Haeberle BLDG-Foundation/Steel (BLDG-Foundation/Steel (PassPass))Inspector: Inspector: shaneshane PLMB-Rough/D.W.V. (PLMB-Rough/D.W.V. (PassPass))Inspector: Inspector: shaneshane BLDG-FOOTING (BLDG-FOOTING (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon BLDG-FOOTING (BLDG-FOOTING (FailFail))Inspector: Inspector: shaneshane