HomeMy WebLinkAboutB15-0207_Plumbing plan 1_1438612800.pdfConnect new 4th floor washer water lines to P-5
Connect new
3rd floor
shower water
lines to P-4
Connect new
4th floor
bathroom
group water
to P-4 Connect new 4th floor washer waste line to 3"
horizontal on P-5
Connect new 4th floor
washer vent line to 2"
horizontal on P-5
Connect new 3rd floor shower waste
(2") and vent (1.5") lines to P-4
Connect 3" waste and 2" vent
from new 4th floor bathroom
group to 3" horizontal waste line
in 3rd floor ceiling and existing
3" vent in 4th floor ceiling
Continue 3" stack from
it's current location up
to the 3rd level ceiling.
Continue vent from top
of stack to existing vent
line
Relocate existing 3rd Floor riser to
the main 3" waste stack
1) This information is provided as a general guideline only. It is the
contractor's responsibility to ensure that all work is completed in
compliance with the 2015 IPC.
2) Contractor shall verify all existing conditions prior to commencing work
08/03/15