Loading...
HomeMy WebLinkAboutB15-0207_Plumbing plan 1_1438612800.pdfConnect new 4th floor washer water lines to P-5 Connect new 3rd floor shower water lines to P-4 Connect new 4th floor bathroom group water to P-4 Connect new 4th floor washer waste line to 3" horizontal on P-5 Connect new 4th floor washer vent line to 2" horizontal on P-5 Connect new 3rd floor shower waste (2") and vent (1.5") lines to P-4 Connect 3" waste and 2" vent from new 4th floor bathroom group to 3" horizontal waste line in 3rd floor ceiling and existing 3" vent in 4th floor ceiling Continue 3" stack from it's current location up to the 3rd level ceiling. Continue vent from top of stack to existing vent line Relocate existing 3rd Floor riser to the main 3" waste stack 1) This information is provided as a general guideline only. It is the contractor's responsibility to ensure that all work is completed in compliance with the 2015 IPC. 2) Contractor shall verify all existing conditions prior to commencing work 08/03/15