Loading...
HomeMy WebLinkAboutB15-0208_D100_1444412940.pdfB C D E F G D-11 D-8 D-8 D-7 D-7 D-4 D-4 D-4 D-5 D-6 D-1 D-1 D-10 D-15 D-5 D-14 D-14 D-14 D-16 D-16 D-14 D-2 D-2 D-17 D-17 D-8 D-7 D-13 D-3 HATCH AREA INDICATES EXTENT OF EXISTING STRUCTURE TO BE REMOVED D-9 D-12 1 2 3 4 B C D E F G D-18 D-11 D-12 3'-5 3/4" 3'-7 3/4" D-19 PROJECT NUMBER: PROJECT DATE: SHEET TITLE: SHEET NUMBER: D100 143100 COMMISSARY 2014.11.24 DEMOLITION PLANS 232 BRIDGE STREET, VAIL, CO 81657 REVISION DATE 1 PEC DRB 11.24.14 2 FINAL DRB PEC 01.26.15 3 DD PRICING 02.04.15 4 FOR CONSTRUCTION 06.16.15 1/4" = 1'-0" 1 FIRST FLOOR DEMO PLAN DEMO NOTES TAG DESCRIPTION D-1 REMOVE [E] CONCRETE PATIO SLAB IN ITS ENTIRETY D-2 REMOVE [E] STONE VENEER ON [E] RETAINING WALL, SALVAGE [E] BRIDGE STREET RETAINING WALL D-3 REMOVE AND RELOCATE [E] LAMP POST D-4 REMOVE [E] DOORS D-5 REMOVE [E] EXTERIOR CMU WALL RE: STRUCTURAL ENGINEER FOR SHORING D-6 REMOVE STEEL COLUMN AND BEAM AND CMU RE: STRUCTURAL ENGINEER FOR SHORING D-7 REMOVE [E] WALL AND ELECTRICAL/PLUMBING IN ITS ENTIRITY D-8 REMOVE [E] CERAMIC TILE FLOORING D-9 REMOVE AND RELOCATE [E] MOPSINK D-10 REMOVE [E] CONCRETE STAIRS IN THEIR ENTIRETY D-11 REMOVE [E] WOOD STAIR D-12 REMOVE [E] FLOORING AND JOISTS FOR NEW STAIR RE: STRUCTURAL D-13 REMOVE [E] BALCONY AND RAILING ABOVE IN ITS ENTIRETY D-14 REMOVE [E] WINDOW D-15 REMOVE [E] CANOPY AND ROOF STRUCTURE RE: STRUCTURAL D-16 REMOVE [E] STONE VENEER/STUCCO FROM [E] WALL PREPARE FOR NEW STRUCTURE AND FINISHES D-17 REMOVE [E] WROUGHT IRON RAILING AND SALVAGE FOR LANDLORD D-18 REMOVE [E] CONCRETE SLAB AS REQUIRED FOR NEW PLUMBING RE: MP SHEETS D-19 REMOVE [E] CONCRETE FOUNDATION WALL RE: STRUCTURAL DEMOLITION PLANS ARE PROVIDED FOR CLARIFICATION. ADDITIONAL DEMOLITION MAY BE REQUIRED AS A RESULT OF THE CONTRACTOR'S CHOICE OF MEANS AND METHODS FOR NEW CONSTRUCTION. REFER TO THE PROPOSED PLANS FOR EXTENT OF NEW CONSTRUCTION. 1/4" = 1'-0" 2 BASEMENT DEMO PLAN 10/09/15