HomeMy WebLinkAboutB15-0208_D100_1444412940.pdfB C D E F G
D-11
D-8
D-8
D-7
D-7
D-4
D-4
D-4
D-5
D-6
D-1
D-1
D-10
D-15
D-5
D-14
D-14
D-14
D-16
D-16
D-14
D-2
D-2
D-17
D-17
D-8
D-7
D-13
D-3
HATCH AREA INDICATES EXTENT
OF EXISTING STRUCTURE TO BE
REMOVED
D-9
D-12
1
2
3
4
B C D E F G
D-18
D-11
D-12
3'-5 3/4" 3'-7 3/4"
D-19
PROJECT
NUMBER:
PROJECT DATE:
SHEET TITLE:
SHEET NUMBER:
D100
143100
COMMISSARY
2014.11.24
DEMOLITION PLANS
232 BRIDGE STREET, VAIL, CO 81657
REVISION DATE
1 PEC DRB 11.24.14
2 FINAL DRB PEC 01.26.15
3 DD PRICING 02.04.15
4 FOR
CONSTRUCTION
06.16.15
1/4" = 1'-0" 1
FIRST FLOOR DEMO PLAN
DEMO NOTES
TAG DESCRIPTION
D-1 REMOVE [E] CONCRETE PATIO SLAB IN ITS ENTIRETY
D-2 REMOVE [E] STONE VENEER ON [E] RETAINING WALL, SALVAGE [E] BRIDGE STREET RETAINING WALL
D-3 REMOVE AND RELOCATE [E] LAMP POST
D-4 REMOVE [E] DOORS
D-5 REMOVE [E] EXTERIOR CMU WALL RE: STRUCTURAL ENGINEER FOR SHORING
D-6 REMOVE STEEL COLUMN AND BEAM AND CMU RE: STRUCTURAL ENGINEER FOR SHORING
D-7 REMOVE [E] WALL AND ELECTRICAL/PLUMBING IN ITS ENTIRITY
D-8 REMOVE [E] CERAMIC TILE FLOORING
D-9 REMOVE AND RELOCATE [E] MOPSINK
D-10 REMOVE [E] CONCRETE STAIRS IN THEIR ENTIRETY
D-11 REMOVE [E] WOOD STAIR
D-12 REMOVE [E] FLOORING AND JOISTS FOR NEW STAIR RE: STRUCTURAL
D-13 REMOVE [E] BALCONY AND RAILING ABOVE IN ITS ENTIRETY
D-14 REMOVE [E] WINDOW
D-15 REMOVE [E] CANOPY AND ROOF STRUCTURE RE: STRUCTURAL
D-16 REMOVE [E] STONE VENEER/STUCCO FROM [E] WALL PREPARE FOR NEW STRUCTURE AND FINISHES
D-17 REMOVE [E] WROUGHT IRON RAILING AND SALVAGE FOR LANDLORD
D-18 REMOVE [E] CONCRETE SLAB AS REQUIRED FOR NEW PLUMBING RE: MP SHEETS
D-19 REMOVE [E] CONCRETE FOUNDATION WALL RE: STRUCTURAL
DEMOLITION PLANS ARE PROVIDED FOR CLARIFICATION. ADDITIONAL DEMOLITION MAY BE
REQUIRED AS A RESULT OF THE CONTRACTOR'S CHOICE OF MEANS AND METHODS FOR NEW
CONSTRUCTION. REFER TO THE PROPOSED PLANS FOR EXTENT OF NEW CONSTRUCTION.
1/4" = 1'-0"
2
BASEMENT DEMO PLAN
10/09/15