HomeMy WebLinkAboutB15-0011_B15-0011 Permit_1442524320.pdfNOTE: THIS PERMIT MUST BE POSTED ON JOBS/TE AT ALL TIMES
m~
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit#:
Project#:
B15-0011
PRJ13-0025
Job Address: 225 WALL ST VAIL Applied ..... : 01/21/2015
09/17/2015 Location ...... : WALL STREET BUILDING Issued ... :
Parcel No .... : 210108222001
OWNER WALL STREET OFFICE LLC AND W 01/21/2015 Phone: 970-479-7131
C/O SOLARIS PROPERTY OWNER LLC
141 E MEADOW DR #211
VAIL co 81657
ARCHITECT MICHAEL SUMAN ARCHITECT, LLC 01/21/2015 Phone: 970-471-6122
PO BOX 7760
AVON co 81620
License: C000001764
CONTRACTOR ROCKY MOUNTAIN CONSTRUCTION 04/15/2015 Phone: 970-476-4458
120 WILLOW BRIDGE RD, STE 7
VAIL co 81657
License: C000003088
APPLICANT SOLARIS PROPERTY OWNER LLC 04/15/2015 Phone: 970-479-6000
SHARON COHN
141 EAST MEADOW DRIVE
UNIT 211
VAIL, CO 81657
Description:
Expansion of street level retail spaces, northeast corner
second floor office & lobby entrance.Interior improvements
to lobby. Exterior improvements of the existing balconies,
remodeled street level storefronts & northeast corner.
Occupancy: R-2 Type Construction: lllB Valuation: $1, 146, 100.00
********************************************************************************* FEE SUMMARY *******************************************************************************
Building Permit --->
Electrical Permit --->
Mechanical Permit ->
Plumbing Permit --->
$6, 145.30 Bldg Plan Check------->
$454.25 Elec Plan Check ------>
$840.00 Mech Plan Check---->
$240.00 Plmb Plan Check--->
$3,994.45
$295.26
$210.00
$60.00
Use Tax Fee--------->
Restuarant Plan Review-->
Additional Fees--------->
Recreation Fee------------>
Investigation---------->
Will Call------------>
TOTAL PERMIT FEES------>
Payments------------>
BALANCE DUE --->
$22,722.00
$0.00
$48,412.65
$0.00
$0.00
$20.00
$83,723.91
$83,723.91
$0.00
***************************************************•**********************************************************************************************************************************
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM -4:00 PM.
combination permit_012811
combination permit_012811
*************************************************************************•***********••**********************************************************************************************
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit#: B15-0011 Address: 225 WALL ST VAIL
Owner: WALL STREET OFFICE LLC AND WALL STREET RETAIL LLC
Location: WALL STREET BUILDING
****************************************"'*************•*******************************•**********************************************************************************************
Cond: CON0014092
Prior to the start of construction a Public Way permit must
be applied for and issued. It is critical that the
contractor meet with the Town of Vail Public Works
Department to coordinate construction staging and impacts
to the Town of Vail streetscape.
Cond: CON0014094
Determination of expansion of fire protection and fire
alarm systems to be conducted.
Cond: CON0014133
The applicant shall provide the Town of Vail with a
pedestrian easement paralleling the extent of the east
fayade of the Wall Street Building which shall be from the
building fayade to the property line prior to requesting a
certificate of occupancy. The pedestrian easement shall
provide for unobstructed pedestrian access.
combination permit_012811
*****************************************************************************************************************************************************
REQUIRED INSPECTIONS AND STATUSES
Permit#: B15-0011 Address: 225 WALL ST VAIL
Owner: WALL STREET OFFICE LLC AND WALL STREET RETAIL LLC
Location: WALL STREET BUILDING
*****************************************************************************************************************************************************
Item: 00501 PW-Access/Staging/Erosion
05/28/2015 By: Is Action: AP
Item: 00539 PW-FINAL C/O
Item: 00010 BLDG-FOOTING
05/06/2015 By: sgremmer Action: DN Comments: Pour
at your own risk. S3.1 was not in the town approved
set of plans.
Detail 4/ on S3.1 has changed and has not been
approved by TOV
I did inspect footing from engineer stamped detail
provided on site
05/07/2015 By: sgremmer Action: Pl
05/21/2015 By: sgremmer Action: Pl Comments: 2nd
lift at CMU wall
05/29/2015 By: Martin Action: Pl Comments:
American Ski Basement
Item: 00020 BLDG-Foundation/Steel
05/13/2015 By: sgremmer Action: Pl
05/18/2015 By: sgremmer Action: Pl Comments: 1st
lift south wall
05/22/2015 By: JRM Action: Pl Comments: 3RD
LIFT SOUTH WALL
05/27/2015 By: sgremmer Action: Pl Comments: 3rd
lift to bond beam
Item: 00120 ELEC-Rough
06/25/2015 By: CC Action: Pl Comments: SE
canopy cans
07/02/2015 By: sgremmer Action: Pl Comments:
102b
07/13/2015 By: sgremmef Action: Pl Comments:
Soffit cans
07/27/2015 By: sgremmer Action: Pl Comments: 102b
above ceiling
07/28/2015 By: sgremmer Action: Pl Comments: 101
07/30/2015 By: sgremmer Action: Pl Comments:
above ceiling 101
08/03/2015 By: sgremmer Action: Pl Comments:
entry can lights
08/11/2015 By: Derek F Action: AP
09/01/2015 By: sgremmer Action: Pl
Item: 00210 PLMB-Underground
Item: 00220 PLMB-Rough/D.W.V.
07/16/2015 By: sgremmer Action: Pl Comments:
underground and DWV
07/27/2015 By: sgremmer Action: Pl Comments: 102b
above ceiling
combination permit_012811
Item: 00230 PLMB-Rough/Water
07/27/2015 By: sgremmer Action: Pl Comments: 102b
above ceiling
Item: 00240 PLMB-Gas Piping
Item: 00200 MECH-Rough
06/25/2015 By: CC Action: Pl Comments:
Chidrens fountain vent
07/13/2015 By: sgremmef Action: Pl Comments: heat
mains tested at 100 psi
07/13/2015 By: JRM Action: Pl Comments:
hydronic heat lines 100 # air test
07/27/2015 By: sgremmer Action: Pl Comments: 102b
above ceiling
07/28/2015 By: sgremmer Action: Pl Comments: 101
Item: 00030 BLDG-Framing
06/15/2015 By: JRM Action: Pl Comments: DECK
FRAMING 2ND LEVEL EAST .. NEED TO ADDRESS FIRE
STOPPING THRU OUT
06/23/2015 By: CC Action: Pl Comments: SE
inset corner exterior wall and canopy
06/25/2015 By: CC Action: Pl Comments: SE
canopy
07/02/2015 By: sgremmer Action: Pl Comments:
upper columns
07/13/2015 By: sgremmef Action: Pl Comments:
soffit and store front
07/13/2015 By: JRM Action: Pl Comments: unit
101 framing
07/27/2015 By: sgremmer Action: Pl Comments: 102b
above ceiling
07/28/2015 By: sgremmer Action: Pl Comments: 101
07/30/2015 By: sgremmer Action: Pl Comments:
above ceiling 101
08/13/2015 By: sgremmer Action: Pl Comments:
stair tower wall framing
08/17/2015 By: martin Action: Pl Comments: Deck
framing
08/19/2015 By: sgremmer Action: Pl Comments:
window header
08/21/2015 By: Martin Action: ON Comments:
Framing incomplete in corridor
08/31/2015 By: jrm Action: Pl Comments:
interior north lobby north wall only
08/31/2015 By: jrm Action: Pl Comments: unit
104
08/31/2015 By: jrm Action: Pl Comments: unit
220 need fire caulk
09/01/2015 By: sgremmer Action: Pl
Item: 00050 BLDG-Insulation
05/13/2015 By: sgremmer Action: Pl Comments:
foundation insulation
05/18/2015 By: sgremmer Action: Pl Comments:
foundation insulation
05/27/2015 By: sgremmer Action: Pl Comments:
Front columns
06/18/2015 By: CC Action: Pl Comments:
First floor exterior wall
Units 102A & 102B head firewall
07/13/2015 By: JRM Action: Pl Comments:
approved insul 102 A and 102 B
07/21/2015 By: sgremmer Action: Pl Comments:
vapor barrier installed
combination permit_012811
07/30/2015 By: sgremmer Action: Pl Comments: 101
08/04/2015 By: sgremmer Action: Pl Comments: 200
09/02/2015 By: sgremmer Action: Pl Comments: 104
Item: 00060 BLDG-Sheetrock Nail
05/22/2015 By: JRM Action: Pl Comments: 2
LAYERS ON COLUMNS (ALL)
06/17/2015 By: CC Action: Pl Comments: up
head at 102A& 102B
outer lower NE column
east wall canopy
06/23/2015 By: CC Action: Pl Comments: East
wall canopy NE outer section
(outer NE column that had been passed ,had rock
removed)
06/25/2015 By: CC Action: Pl Comments: SE
canopy
06/29/2015 By: sgremmer Action: Pl Comments:
exterior soffit m-glass
07/07/2015 By: sgremmer Action: Pl Comments: 102B
07/13/2015 By: JRM Action: Pl Comments: unit
104 drywall boxes for fan coil units
07/27/2015 By: sgremmer Action: Pl Comments: lathe
08/03/2015 By: sgremmer Action: Pl Comments:
102b, 101 ceiling, 102a
head wall 103b fire sating assembly
08/04/2015 By: sgremmer Action: Pl Comments: 102b
08/05/2015 By: sgremmer Action: ON Comments: All
cans anf 2x4 light fixtures to be fire rated
08/21/2015 By: Martin Action: ON Comments:
Drywall is not to lid in corridor
08/31/2015 By: jrm Action: Pl Comments: 102
B drywall
Item: 00070 BLDG-Misc.
08/13/2015 By: sgremmer Action: Pl Comments: lathe
08/21/2015 By: Martin Action: ON Comments: lath
incomplete, qwether protection is not in place,
missing weather protection behind keypad
Item: 00190 ELEC-Final
09/14/2015 By: sgremmer Action: Pl Comments: 101,
102A, 102B, 103B-Label Panel
Item: 00290 PLMB-Final
Item: 00390 MECH-Final
Item: 00420 Special Inspect-final rept
Item: 00542 PLAN-FINAL
Item: 00090 BLDG-Final
combination permit_012811