HomeMy WebLinkAboutB15-0011_B15-0011 REV1 Expoxy Cover Report_1430859240.pdfClient:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
Wall Street Building Improvements
Mr. Mike Losey
Rocky Mountain Construction Group
120 Willow Bridge Road, Suite 7
Vail, CO 81657
Comments or Photos:
Yes No
Discrepancies Reported this Date?
No. of Pages Attached:
Field Representative:
Drill and Epoxy Cover Report
Date:Date Job NameJob Number:Job Number
As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at
locations requested.
General Contractor:General Contractor Rep. Notified:Rep Notified
April 30, 2015 15-6518
Rocky Mountain Construction Group Mike
1
Chris Hutto
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
Wall Street Building Improvements
Mr. Mike Losey
Rocky Mountain Construction Group
120 Willow Bridge Road, Suite 7
Vail, CO 81657
Location: 1.)
2.)
3.)
4.)
Orientation (vertical/horizontal): 1.) 3.)
2.) 4.)
Hole Diameter (inches): 1.) Length (inches): 1.)
2.) 2.)
3.) 3.)
4.) 4.)
Hole Spacing (inches): 1.) 3.)
2.) 4.)
Drilling Equipment:
Method to Clean Hole:
Epoxy Type:
Epoxy Expiration:
Placement Method:
Type (rebar/bolt/anchor): 1.) Size: 1.) Length (inches) 1.)
2.) 2.) 2.)
3.) 3.) 3.)
4.) 4.) 4.)
Placement Method:
Additional Reinforcing Steel:
Field Representative:
Comments:
Reinforcement
Epoxy
Documents Used:
Drill and Epoxy
Drilling
Subcontractor: Rep. Notified:
pGeneral Contractor: Rep. Notified:
p
Job Number:Report Date:April 30, 2015 15-6518
Rocky Mountain Construction Group Mike
Gallegos Joe
4/S3.1, email dated 4-29-15
East Side foundation into existing footing
Vertical
3/4 6in
24
Hilti Hammer Drill
Wire brush, compressed air
Hilti Hit-Hy 200-R
4-30-15
Pump gun
Rebar #5 36
Hand set
N/A
Chris Hutto