Loading...
HomeMy WebLinkAboutB15-0011_B15-0011 REV1 Expoxy Cover Report_1430859240.pdfClient: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper Wall Street Building Improvements Mr. Mike Losey Rocky Mountain Construction Group 120 Willow Bridge Road, Suite 7 Vail, CO 81657 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Drill and Epoxy Cover Report Date:Date Job NameJob Number:Job Number As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. General Contractor:General Contractor Rep. Notified:Rep Notified April 30, 2015 15-6518 Rocky Mountain Construction Group Mike 1 Chris Hutto Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper Wall Street Building Improvements Mr. Mike Losey Rocky Mountain Construction Group 120 Willow Bridge Road, Suite 7 Vail, CO 81657 Location: 1.) 2.) 3.) 4.) Orientation (vertical/horizontal): 1.) 3.) 2.) 4.) Hole Diameter (inches): 1.) Length (inches): 1.) 2.) 2.) 3.) 3.) 4.) 4.) Hole Spacing (inches): 1.) 3.) 2.) 4.) Drilling Equipment: Method to Clean Hole: Epoxy Type: Epoxy Expiration: Placement Method: Type (rebar/bolt/anchor): 1.) Size: 1.) Length (inches) 1.) 2.) 2.) 2.) 3.) 3.) 3.) 4.) 4.) 4.) Placement Method: Additional Reinforcing Steel: Field Representative: Comments: Reinforcement Epoxy Documents Used: Drill and Epoxy Drilling Subcontractor: Rep. Notified: pGeneral Contractor: Rep. Notified: p Job Number:Report Date:April 30, 2015 15-6518 Rocky Mountain Construction Group Mike Gallegos Joe 4/S3.1, email dated 4-29-15 East Side foundation into existing footing Vertical 3/4 6in 24 Hilti Hammer Drill Wire brush, compressed air Hilti Hit-Hy 200-R 4-30-15 Pump gun Rebar #5 36 Hand set N/A Chris Hutto