Loading...
HomeMy WebLinkAboutB15-0026_PL2.2_1476902040.pdfM HEAT EXCHANGER BYPASS VALVE ULTRAVIOLET TREATMENT CHAMBER (OPTIONAL) 2" PIPE 3 4 " PIPE OZONE INJECTOR (OPTIONAL) CHLORINE EROSION FEEDER UV BYPASS VALVE 1" PIPE CHLORINE GENERATOR (OPTIONAL) CHLORINE FEED PUMP (OPTIONAL) 3 8 " TUBING 3 8 " TUBING ACID FEED PUMP (OPTIONAL) 3 4 " PIPE 2" PIPE RETURN TO SPA 3 4 " PIPE IN-LINE THERMOMETER FLOW SWITCH IN-LINE THERMOMETER HIGH LIMIT HEAT EXCHANGER BY MECHANICAL NOTE: ALL BOILER SUPPLY PIPING, VALVES & CONTROL WIRING BY M.C. FRESH WATER SUPPLY BACK FLOW PRV AUTO FILL BACKWASH TO SANITARY WASTE FLOOR SINK OR FLOOR DRAIN SKIMMER FROM SPA CIRCULATION PUMP JET PUMP SPA NOTE: IF BELOW WATER LEVEL PLACE INJECTOR AS HIGH AS POSSIBLE IN ROOM A 2 WAY ISOLATION VALVE C 3 WAY BY PASS VALVE E CHECK VALVE B 2 WAY BY PASS VALVE F UNION M S SOLENOID VALVE MOTORIZED VALVE FILTER BY P.C. BY M.C. M HEAT EXCHANGER BYPASS VALVE ULTRAVIOLET TREATMENT CHAMBER (OPTIONAL) 2" PIPE 3 4 " PIPE OZONE INJECTOR (OPTIONAL) CHLORINE EROSION FEEDER UV BYPASS VALVE 1" PIPE CHLORINE GENERATOR (OPTIONAL) CHLORINE FEED PUMP (OPTIONAL) 3 8 " TUBING 38 " TUBING ACID FEED PUMP (OPTIONAL) 3 4 " PIPE 2" PIPE RETURN TO POOL 3 4 " PIPE IN-LINE THERMOMETER FLOW SWITCH IN-LINE THERMOMETER HIGH LIMIT NOTE: ALL BOILER SUPPLY PIPING, VALVES & CONTROL WIRING BY M.C. FRESH WATER SUPPLY BACK FLOW PRV AUTO FILL BACKWASH TO SANITARY WASTE FLOOR SINK OR FLOOR DRAIN SKIMMER SKIMMER FROM POOL CIRCULATION PUMP NOTE: IF BELOW WATER LEVEL PLACE INJECTOR AS HIGH AS POSSIBLE IN ROOM A 2 WAY ISOLATION VALVE C 3 WAY BY PASS VALVE E CHECK VALVE B 2 WAY BY PASS VALVE F UNION M S SOLENOID VALVE MOTORIZED VALVE FILTER HEAT EXCHANGER BY MECHANICAL POOL /SPA WATER LEVEL 4" 6" 5" MIN 1' BELOW WATER LEVEL FOR PIPE RUN - AT BOTTOM OF POOL SHELL ELEVATION IS BEST DECK = 8303'-5" 71 8" W/L = 8302'-9 7/8" CORES BELOW = 8301'-9 7/8" PL2.2 PLUMBING SCHEMATICS PROJECT: DRAWING: FLEEGER RESIDENCE 2950 BOOTH CREEK DRIVE VAIL, COLORADO DATE ISSUE 3-23-16 DD 5-6-16 CD 5-18-16 CD 6-13-16 CD SCAPES NOT TO SCALE SWIMMING POOL PLUMBING SCHEMATIC 1 NOT TO SCALE SPA PLUMBING SCHEMATIC 2 NOT TO SCALE CORE HOLES 3 10/19/16