Loading...
HomeMy WebLinkAboutB15-0037_A0_13_1425423000.pdf 411,1 OF k (4101111k° APPROVALS = �• L.- litif > iriz id 4 4 / co 1 igy 11703 IlVill (E) COAX ENTRY PORT 03/03/15 IN CEILING I -6-%a - -6-% — INSTALL (N) 3C, & __ RELOCATE (E) 1C & 2C 0 c, RADIO CARDS IN (N) — LTE RACK _ NOES _� (2) NEW ROSENBERGER WR–VG86T DC POWER TRUNK CABLES, 0o (1 ) EXISTING ROSENBERGER WR–VG86T DC POWER TRUNK 1 . THE CONDUIT ROUTING IS SHOWN DIAGRAMMATICALLY ON THE PLANS AND IS ' / O CABLES & (1 ) EXISTING ROSENBERGER FBL98B-034 FIBER TRUNK CABLE FROM LTE EQUIPMENT TO PROPOSED RAYCAP ONLY AN APPROXIMATION. THE EXACT LOCATION AND ROUTING SHALL BE FIELD OHF SURGE PROTECTION UNIT MOUNTED ON TOWER VERIFIED. ° ° O 2. ALL DISCONNECTS AND CONTROLLING DEVICES SHALL BE PROVIDED WITH pI1►lik 1Y4" INNER DUCT FROM ENGRAVED LAMICOID NAMEPLATES, INDICATING THE CIRCUITS ORIGINATION AND OHF EXISTING TELCO TERMINAL ALL EQUIPMENT TERMINATIONS. C ollgi TO EXISTING LTE RACK p:. IN. 3. CONTRACTOR SHALL PROVIDE ALL CONDUITS AND CIRCUITS AS REQUIRED FOR \ o E A COMPLETED SYSTEM AND SHALL BE IN COMPLIANCE WITH THE ° MANUFACTURER'S SPECIFICATIONS. INSTALL (2) (N) RACK MOUNTED RAYCAP SURGE o – 4. CONTRACTOR SHALL PROVIDE STRAIN–RELIEF AND CABLE SUPPORTS FOR ALL SUPPRESSORS IN (E) �? LTE RACK , J (E) TELCO BOARD CABLE ASSEMBLIES, COAX CABLES, AND RET CONTROL CABLES. CABLE "" (E) BATTERY STRING STRAIN–RELIEF & CABLE SUPPORTS SHALL BE APPROVED FOR THE PURPOSE. (N) BATTERY RACK L / D INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S / SPECIFICATIONS AND RECOMMENDATIONS. / I i n I I 1 I 1 dH dHO OVERHEAD DC POWERI I ROUTED ON EXISTING 7 - I I KEY N O CABLE LADDER ° ° ' ° - • 1 FIF GROUNDING BAR: EXTEND (2) #2 AWG TINNED CU CONDUCTORS TO J O (E) LINEAGE POWER 1 MASTER GROUNDING BAR AND MAKE A MECHANICAL CONNECTION. CABINET _ 1 O MASTER GROUNDING BAR: EXTEND (2) #2 AWG TINNED CU CONDUCTORS FROM EXISTING GROUNDING SYSTEM UP TO MASTER GROUNDING BAR & MAKE O HVAC HVAC AN EXOTHERMIC CONNECTION. NOTE LEGEND ALL NON–AFFECTED EQUIPMENT EXCLUDED FOR CLARITY OVERHEAD DC POWER OHP OHP OHP CONTRACTOR SHALL ROUTE FIBER CABLES INSIDE THE OVERHEAD FIBER OHF OHF OHF EQUIPMENT ROOM IN 1 1 /4" INNER DUCT MOUNTED FROM "L" BRACKET MOUNTED TO EXISTING CABLE EXOTHERMIC (EXOTHERMIC) ■ FULL SCALE 1 /2" = 1 '-0" LADDER. /\ (22x34 SHEET ONLY) COMPRESSION TYPE CONNECTIONS • 2' 1 " 0 2' 4' CONTRACTOR SHALL ROUTE DC POWER CONDUCTORS GROUNDING CONDUCTOR IP V 1 1 1 1 1 1 1 1 I ATTACHED TO EXISTING CABLE LADDER. TIE DC POWER NORTH HALF SCALE 1 /4" = 1 '-0" CABLES TO EXISTING CABLE LADDER. GROUNDING BAR 41----41(11x17 SHEET ONLY) A ELECTRICAL PLAN 1 DESIGN CONSULTANT ,�����f�`"""" AT&T MOBILITY •:• aRED SANDSTONE ` 4 _ _ sTe c - U, e' {�lig 4 inte grat ed f°� %°oma® El DESIGN SERVICES GROUP C O L04025 �7�6® a Network Solutions RJ ELECTRICAL PLAN 2200 E.WILLIAMS FIELD RD, SUITE 200 545 N. FRONTAGE RD. AT&T MOBILITY 0 02/03/15 FINAL CONSTRUCTION DRAWINGS CP MA ° GILBERT, ARIZONA 85295 7025 S. REVERE PKWY 188 INVERNESS DRIVE WEST, SUITE 400 ' ®�°°°° °°°° ®�� ' SUITE 1 00 VAIL, CO 81 657 CO 80112 N0. DATE REVISIONS BY CHK APP'D 6�®®r°��� g FA NUMBER DRAWING NUMBER REV OFFICE: (602) 218-8820-FAX(602)218-8820ENGLEWOOD, '' 'l''l6'!oA�rruUtiQu1,�� ��\1 CENTENNIAL, CO 80112 SCALE: AS SHOWN DESIGNED BY: RJK DRAWN BY: RJK ti\ 10093722 COL04025– El 0 6 5 4 3 2 22 x M "D" SIZE