HomeMy WebLinkAboutB15-0097_A2.0_1430947980.pdfDN
DN
UP
UP
A3.0
A3.1 2
2
A3.0
1
8411' - 11"
8416' - 3"
14' - 0 1/2"
demo out wall
EAST UNIT
WEST UNIT
REVEGITATE
REVEGITATE
EXISTING
GAME ROOM
EXISTING
BEDROOM 3
EXISTING
STOR / LAUNDRY
A3
.3
2
A3 .3 4
MOVE EXISTING WALL OUT
APPROX 3' TO WITHIN 1' OF
COVERED AREA EDGE
A3.2
1
NEW
ENCLOSED AREA
UNDER EXISTING
MASTER BATHROOM
ENCLOSE UNDER EXISTING
MASTER BATHROOM AND
MASTER BEDROOM WHERE
OPEN TO AIR NOW
ASPHALT
35
36
-
-
EGRESS WINDOW
1
A4.0
1
A4.2
2
A4.1
2
A4.0
2
A4.2
1
A4.1
34
-
---
-
---
1/4" = 1'-0"
1
LOWER FLOOR
Project number Date REVISIONS
Consultants:
Structural Engineering:
Monroe & Newell Engineers, Inc. Peter Monroe
(p) 303.623.4927
(f) 970.949.4054
avon@monroe-newell.com
Evans Chaffee Construction Group, Inc.Chris Evans
(p)970.845.0466
(f) 970.845.0465
(e)cevans@evanschaffee.com
Eagle Valley Surverying, Inc.(p)970.949.1405
General Contractor:
Surveyor:
4/9/2015 11:15:25 PM
A2.0
LOWER LEVEL 1404 Residence Renovation PERMIT SET APRIL 7, 2015 Chris & Michele Evans
4126 Columbine Dr. Vail, CO
Lot 16, Bighorn Subdivision
NORTH
No. Description
Date
05/06/15