Loading...
HomeMy WebLinkAboutB15-0097_A2.0_1430947980.pdfDN DN UP UP A3.0 A3.1 2 2 A3.0 1 8411' - 11" 8416' - 3" 14' - 0 1/2" demo out wall EAST UNIT WEST UNIT REVEGITATE REVEGITATE EXISTING GAME ROOM EXISTING BEDROOM 3 EXISTING STOR / LAUNDRY A3 .3 2 A3 .3 4 MOVE EXISTING WALL OUT APPROX 3' TO WITHIN 1' OF COVERED AREA EDGE A3.2 1 NEW ENCLOSED AREA UNDER EXISTING MASTER BATHROOM ENCLOSE UNDER EXISTING MASTER BATHROOM AND MASTER BEDROOM WHERE OPEN TO AIR NOW ASPHALT 35 36 - - EGRESS WINDOW 1 A4.0 1 A4.2 2 A4.1 2 A4.0 2 A4.2 1 A4.1 34 - --- - --- 1/4" = 1'-0" 1 LOWER FLOOR Project number Date REVISIONS Consultants: Structural Engineering: Monroe & Newell Engineers, Inc. Peter Monroe (p) 303.623.4927 (f) 970.949.4054 avon@monroe-newell.com Evans Chaffee Construction Group, Inc.Chris Evans (p)970.845.0466 (f) 970.845.0465 (e)cevans@evanschaffee.com Eagle Valley Surverying, Inc.(p)970.949.1405 General Contractor: Surveyor: 4/9/2015 11:15:25 PM A2.0 LOWER LEVEL 1404 Residence Renovation PERMIT SET APRIL 7, 2015 Chris & Michele Evans 4126 Columbine Dr. Vail, CO Lot 16, Bighorn Subdivision NORTH No. Description Date 05/06/15