Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B15-0097_A3.2_1430947980.pdf
LOWER FLOOR 8411' - 11" MAIN FLOOR 8420' - 10" UPPER FLOOR 8429' - 9 1/4" LOWER ROOF 8438' - 10" GARAGE 8415' - 1" VERTICAL 1 X 6 BARNWOOD SIDING ON THERMAL AND AIR INFILTRATION BARRIER ON SHEATHING ON 2x6 WOOD STUDS HORIZONTAL 1X6 SHIP LAP WOOD SIDING - TO MATCH EXISTING - ON THERMAL AND AIR INFILTRATION BARRIER ON SHEATHING ON 2x6 WOOD STUDS 2" / 1'-0" 2" / 1'-0" 8432' - 9 1/2" 8430' - 2 3/4" 8424' - 0 1/4" 8414' - 6" 8412' - 6" Project number Date REVISIONS Consultants: Structural Engineering: Monroe & Newell Engineers, Inc. Peter Monroe (p) 303.623.4927 (f) 970.949.4054 avon@monroe-newell.com Evans Chaffee Construction Group, Inc.Chris Evans (p)970.845.0466 (f) 970.845.0465 (e)cevans@evanschaffee.com Eagle Valley Surverying, Inc.(p)970.949.1405 General Contractor: Surveyor: 4/9/2015 11:17:07 PM A3.2 ELEVATIONS 1404 Residence Renovation PERMIT SET APRIL 7, 2015 Chris & Michele Evans 4126 Columbine Dr. Vail, CO Lot 16, Bighorn Subdivision 1/4" = 1'-0" 1 SOUTH ELEVATION / LOFT GARAGE No. Description Date 05/06/15