HomeMy WebLinkAboutB15-0097_D2.5_1430947980.pdfDN
D3.0
D3.1 2
2
D3.0
1
6" / 1'-0"
D3.1
1
EAST UNIT
WEST UNIT 6" / 1'-0"
6" / 1'-0"
3" / 1'-0"
6" / 1'-0"
DECK
DECK
6" / 1'-0"
FLAT ROOF
FLAT ROOF
FLAT ROOF
FLAT ROOF
8438' - 10 3/4"
8438' - 10 3/4"
A3.3
2
A3.3 4
8438' - 11 3/4"
REMOVE ROOF AS NEEDED FOR LOFT AREA
(LEAVE SECTION OVER UPPER BEDROOM)
TO BE TIED INTO
REMOVE EXISTING SKYLIGHT AREA (ON BOTH UNITS)
REMOVE EXISTING
CEDAR SHAKE ROOF
(TO BE REPLACED WITH
METAL ROOFING)
1/4" = 1'-0"
1
ROOF PLAN
Project number Date REVISIONS
Mountain CAD Services
Rob Dale
(p)970.331.8658
(f) 970.926.2927
(e)rob@mountaincadservices.com
Consultants:
Structural Engineering:
Monroe & Newell Engineers, Inc. Peter Monroe
(p) 303.623.4927
(f) 970.949.4054 avon@monroe-newell.com
Evans Chaffee Construction Group, Inc.
Chris Evans
(p)970.845.0466
(f) 970.845.0465
(e)cevans@evanschaffee.com
Eagle Valley Surverying, Inc.(p)970.949.1405
General Contractor:
Surveyor:
4/9/2015 9:53:36 PM
D2.5
DEMO ROOF PLAN 1404 Residence Renovation
PERMIT SET APRIL 7, 2015 Chris & Michele Evans
4126 Columbine Dr. Vail, CO
NORTH No. Description
Date
05/06/15