TO "GARAGE LIGHTING"
20 AMP CIRCUIT
HALO 4" RECESSED LED CAN, TYP
4' LED LIGHT FIXTURE
EXISTING POWER
EXISTING POWER PANEL
TO "GARAGE LIGHTING"
20 AMP CIRCUIT
TO "GARAGE 1"
20 AMP GFCI CIRCUIT
TO "GARAGE 2"
20 AMP GFCI CIRCUIT
ELECTRICAL IN THIS ROOM TO
"MUD ROOM" 20 AMP CIRCUIT
RELOCATE EXISTING
SINK AS NEEDED
FROST-PROOF
HOSE BIB
CEILING MOUNT FOR
GARAGE DOOR OPENER
CONNECT TO EXISTING
POWER AT 3-WAY
SWITCH AT TOP OF STAIRS
DUCT FAN TO EXTERIOR
PER MFG'S INSTRUCTIONS
WIRE TO RUN WITH LIGHT
MEP NOTES
ELECTRICAL:
RUN NEW CIRCUITS TO EXISTING PANEL IN NEW MUD ROOM
ALL ELECTRICAL TO BE IN ACCORDANCE WITH 2011 NEC.
VERIFY COMPATIBILITY OF NEW HARDWIRED CARBON
MONOXIDE/SMOKE DETECTORS TO WIRELESSLY INTERFACE
WITH EXISTING DETECTORS INSTALLED THROUGHOUT
REMAINDER OF HOUSE.
REPLACE ALL EXISTING BREAKERS IN MAIN PANEL WITH NEW
BREAKERS.
ALL NEW LIGHTING TO BE LED.
ALL RECEPTACLES TO BE TAMPER PROOF
PLUMBING:
PLUMBING SCOPE OF WORKS TO BE DESIGN/BUILD BY
PLUMBING SUBCONTRACTOR.
CONNECT ALL WATER LINES TO EXISTING HOT & COLD WATER
LINES
NEW DRAIN LINES TO BE CAST IRON - RUN PER CODE
WASTE LINES BELOW GROUND CAN BE ABS - RUN PER CODE
VENT LINES ABOVE GRADE CAN BE ABS - RUN PER CODE
PEX TUBING IS PREFERRED FOR ALL NEW WATER LINES.
REPAIR DAMAGE/DEFICIENCIES IN EXISTING SYSTEM UPON
NOTIFICATION TO AND APPROVAL FROM HOMEOWNER.
MECHANICAL:
MECHANICAL SCOPE OF WORK TO BE DESIGN/BUILD BY
MECHANICAL SUBCONTRACTOR.
EXTEND EXISTING FORCED AIR HEATING SYSTEM TO SERVE
THIS LEVEL
VENT BATHROOMS TO EXTERIOR PER CODE.
THERE ARE NO NEW GAS LOADS ASSOCIATED WITH THIS
SCOPE OF WORK.
REPAIR DAMAGE/DEFICIENCIES IN EXISTING SYSTEM UPON
NOTIFICATION TO AND APPROVAL FROM HOMEOWNER.
3'-0" X 7'-0" DOOR TO PROVIDE
CODE REQUIRED CLEARANCE IN
FRONT OF EXISTING ELECTRICAL
PANEL. REF ARCH.
ENCLOSED AREA = 392 SF
PROVIDE VENTILATION EQUAL TO 3 SF
IN 1 SF OPENINGS ON OPPOSITE SIDES
FOR CRAWLSPACE VENTILATION