Loading...
HomeMy WebLinkAboutB15-0097_MEP2.1_1430947980.pdfCONNECT TO EXISTING CIRCUIT WIRE TO EXISTING LIVING ROOM CIRCUIT SEE PAGE MEP2.0 FOR THIS AREA MEP NOTES ELECTRICAL: RUN NEW CIRCUITS TO EXISTING PANEL IN NEW MUD ROOM ALL ELECTRICAL TO BE IN ACCORDANCE WITH 2011 NEC. VERIFY COMPATIBILITY OF NEW HARDWIRED CARBON MONOXIDE/SMOKE DETECTORS TO WIRELESSLY INTERFACE WITH EXISTING DETECTORS INSTALLED THROUGHOUT REMAINDER OF HOUSE. REPLACE ALL EXISTING BREAKERS IN MAIN PANEL WITH NEW BREAKERS. ALL NEW LIGHTING TO BE LED. ALL RECEPTACLES TO BE TAMPER PROOF PLUMBING: PLUMBING SCOPE OF WORKS TO BE DESIGN/BUILD BY PLUMBING SUBCONTRACTOR. CONNECT ALL WATER LINES TO EXISTING HOT & COLD WATER LINES NEW DRAIN LINES TO BE CAST IRON - RUN PER CODE WASTE LINES BELOW GROUND CAN BE ABS - RUN PER CODE VENT LINES ABOVE GRADE CAN BE ABS - RUN PER CODE PEX TUBING IS PREFERRED FOR ALL NEW WATER LINES. REPAIR DAMAGE/DEFICIENCIES IN EXISTING SYSTEM UPON NOTIFICATION TO AND APPROVAL FROM HOMEOWNER. MECHANICAL: MECHANICAL SCOPE OF WORK TO BE DESIGN/BUILD BY MECHANICAL SUBCONTRACTOR. EXTEND EXISTING FORCED AIR HEATING SYSTEM TO SERVE THIS LEVEL VENT BATHROOMS TO EXTERIOR PER CODE. THERE ARE NO NEW GAS LOADS ASSOCIATED WITH THIS SCOPE OF WORK. REPAIR DAMAGE/DEFICIENCIES IN EXISTING SYSTEM UPON NOTIFICATION TO AND APPROVAL FROM HOMEOWNER. 05/06/15