Loading...
HomeMy WebLinkAboutB15-0101_B15-0101 plan_1432073640.pdfUP DW REF. UP DN DN REMOVED EXISTING DROPPED SOFFIT OVER COUNTER RELOCATE EXISTING ELEC PANEL REMOVED PORTION OF WALL TO CREATE SLOPING WALL 3'-0" ABOVE THE STAIR TREADS OR OPEN PICKET RAILING CORNER TO REMAIN TO SUPPORT END OF NEW BEAM TO FLOOR ABOVE PORTION OF WALL FROM UNDERSIDE OF STAIR TO CEILING TO REMAIN/BE REBUILT EXISTING 8'-0" DROPPED CEILING TO REMAIN OVER THIS PORTION Remove wall mounted light at patch wall to maintain 1 hour fire rating REMOVE EXISTING RECESSED CAN LIGHT AND PATCH CEILING TO MAINTAIN THE 1 HOUR FIRE RATING 39' - 5" 16' - 3 1/2" 13' - 4" 13' - 4" 5' - 0 1/2" 6' - 0" 10' - 7" NEW /RELOCATED ELECTRICAL PANEL LOCATION 5' - 6" NEW 24" WIDE POCKET DOOR REMOVED PORTION OF WALL TO CREATE SLOPING WALL 3'-0" ABOVE THE STAIR TREADS OR OPEN PICKET RAILING INFILL WALL TO CREATE FLAT WALL 6' - 4" NEW 24" WIDE POCKET DR (REVIEW USE OF PAIR OF 30" BI-PASSING DOORS) 2' - 6" 7' - 11 1/2" 11' - 10" 5" 2' - 0" 7' - 0" 2' - 0" 5" 3' - 9" LINE OF NEW BEAM TO SUPPORT UPPER FLOOR FRAMING 30" RANGE WITH MICRO ABOVE PORTION OF WALL FROM UNDERSIDE OF STAIR TO CEILING TO REMAIN/BE REBUILT NEW 5/8" GYP BD ON FURRING TO COVER EXISTING BRICK ON FIREPLACE 2' - 0" BUILT-IN BENCH SKI BENCH AREA KITCHEN PANTRY GUEST MASTER BEDROOM CLO BUILT-IN WIDOWS SEAT WITH CABINETS BELOW EXISTING DROPPED SOFFIT TO REMAIN REVIEW CEILING HT AT UPPER CABINETS. (ROUGHLY 7'-0" AT WALL) ADD NEW FIRE SPRINKLER HEAD FOR NEW CLOSET REWORK EXISTING HEAD TO ADD NEW FIRE SPRINKLER HEAD IN NEW CLOSET D D D D D D D D D D D wet D D D D D A A A D DIRECTIONAL LIGHT DUPLEX FLOOR OUTLET (new) 2'-8" TO OUTLET FIREPLACE (EXISTING) B B D D Remove wall mounted light at patch wall to maintain 1 hour fire rating Remove wall mounted light at patch wall to maintain 1 hour fire rating 28' - 0" confirm (maximize) 7' - 1 1/2" 8 3/4" RELOCATE THIS DOOR 6" WEST REMOVED EXISTING TUB AND REPLACE WITH NEW SHOWER 2' - 6" NEW OWNER'S CLOSET WITH NEW 2'-0" DOOR (MATCH HT OF EXISTING DOORS) ADD NEW FIRE SPRINKLER HEAD FOR NEW CLOSET A B CEILING MOUNTED FIXTURE (CHANDELIER, PENDANT OR SURFACE MOUNT) D 6" RECESSED CAN LIGHT At locations that separate this unit from others: use Tentmat rated encloser or Easybarrier rated encloser box or 1 hour rated gyp. bd/ box out WALL MOUNTED SCONCE FIXTURE D D D D B B 3' - 6" 3' - 6" CONFIRM LOCATION WITH CONTRACTOR 2 LIGHT FIXTURES (1) HIGH AND (1) LOW FOR BUNK BEDS 2 LIGHT FIXTURES (1) HIGH AND (1) LOW FOR BUNK BEDS wet wet DUPLEX OUTLET (new) GA File NO. WP 1350 1-Hour Fire-Rated Construction Steel Framed Construction Detail Description • One layer 5/8" type 'X' gypsum wall board panels or gypsun veneer base appilied parallel or at right angles to each side of – 3-1/2" OR 6" steel studs with 1" type S drywall screws at 8" o.c. at vert. joints and 12" o.c. at floor and ceiling runners and intermediate studs Stagger joints 24" on opposite sides – batt insulation existing construction 970.328.5151 OFFICE PO Box 1587, Eagle, CO 81631 www.martinmanleyarchitects.com Project number Date REVISIONS 5/6/2015 3:58:12 PM A1.0 ARCHITECTURAL DRAWINGS 1505 Rambaud Residence PERMIT SET 04.04.15 Renovation of Mountain Haus #679 MOUNTAIN HAUS CONDO Unit: 679 292 East Meadow Drive Vail, CO 81657 PROJECT INFORMATION Single Family Residence Owner: DAMVIX MOUNTAIN ASSETS LLC Rambaud 2 COCONUT LN KEY BISCAYNE, FL 33149-1913 Location: MOUNTAIN HAUS CONDO Unit: 679 Parcel #: 2101-082-28-067 Class of Work: Renovation Type of Construction: Type 2B Type of Occupancy: R2 (multi family) Levels: 5-story +basement Architect: Martin Manley Architects Jeffrey P Manley AIA PO Box 1587 Eagle, CO 81631 970.328.5151 jeff@martinmanleyarchitects.com Contractor: Andrew D Salazar A.S.Contracting Services 970-306-1272 ascontracting1@aol.com CONSTRUCTION DOCUMENTS NOTE: THESE CONSTRUCTION DOCUMENTS INCLUDING ARCHITECTURAL SHEETS HAVE BEEN PREPARED IN RESPONSE TO THE SPECIFIC BASIC SERVICES REQUESTED BY THE OWNER CONTEMPLATING CONTINUED INVOLVEMENT, SELECTIONS AND DECISION MAKING BY THE GENERAL CONTRACTOR AND OWNER THROUGH COMPLETION OF CONSTRUCTION. THESE DOCUMENTS INDICATE THE SCOPE OF ARCHITECTURAL DESIGN CONCEPTS APPROVED BY THE OWNER AND INCLUDE DIMENSIONS OF THE BUILDING, THE TYPES OF STRUCTURAL SYSTEMS AND AN OUTLINE OF THE ARCHITECTURAL AND STRUCTURAL ENGINEERING ELEMENTS OF CONSTRUCTION. THESE CONSTRUCTION DOCUMENTS PROVIDE THE SCOPE OF SERVICES AS OUTLINED IN THE AGREEMENT FOR ARCHITECTURAL SERVICES AND THEREFORE DO NOT NECESSARILY INDICATE OR DESCRIBE ALL MATERIALS REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE WORK. IT IS THE UNDERSTANDING OF THE ARCHITECT AND ENGINEER THAT THE GENERAL CONTRACTOR SHALL FURNISH ALL WORK REQUIRED FOR PROPER COMPLETION OF THE WORK AND THAT THE WORK SHALL BE OF SOUND AND QUALITY CONSTRUCTION IN ACCORDANCE WITH INDUSTRY STANDARDS AND ALL MANUFACTURERS SPECIFICATIONS, INSTRUCTIONS, AND WARRANTY REQUIREMENTS. THE CONTRACTOR, BASED ON THE FOREGOING, SHALL PREPARE FOR OWNER REVIEW A REALISTIC BUDGET WITH A LATITUDE OF PRICES BASED ON ASSUMPTIONS OF SCOPE OF WORK AND OWNER PRODUCT SELECTIONS. CONTRACTOR'S RESPONSIBILITIES: THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS, CONSTRUCTION DOCUMENTS, STRUCTURAL DOCUMENTS, MUNICIPAL AND/OR COUNTY ZONING CODES, PERTINENT IRC 2009 CODE REQUIREMENTS, AND GENERAL SPECIFICATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MECHANICAL AND ELECTRICAL ENGINEERING, DESIGN, SPECIFICATIONS AND DRAWINGS AS REQUIRED FOR BUILDING PERMIT AND APPROVAL BY OWNER AND ARCHITECT. No. Description Date 3 Revision 1-Deleted light fixtures 05-06-15 1/2" = 1'-0" 1 Vicinity Map 1/4" = 1'-0" 2 02.0 Demolition Main Level 1/4" = 1'-0" 3 02.0 Main Level 1/4" = 1'-0" 4 3.0 Demolition Upper Level 1/4" = 1'-0" 5 3.0 Upper Level FOR WALL CONSTRUCTION/FINISH WORK DONE AT NEW SHOWER ON UPPER LEVEL Unit INTERIOR LIGHTING NOTE GENERAL CONTRACTOR TO MEET 2012 IRC REQUIREMENT SECTION N1104.1 LIGHTING EQUIPMENT: A MINIMUM OF 75 PERCENT OF THE LAMPS IN PERMANENTLY INSTALLED LIGHTING FIXTURES SHALL BE HIGH-EFFICACY LAMPS. Lower Level: Entry: 1. Remove and relocate wiring after drywall is removed. 2. Remove and relocate existing electrical panel to new location. 3. Install a junction box in drop ceiling for the wiring relocation. 4. Supply temporary power for subcontractors working in unit. 5. Add 4 – 6” recessed light can fixtures in entry and closet ceilings. 6. Light fixture fire hats to be determined by TOV inspection at plan review. 7. Add electrical outlets per electrical code requirements. 8. Electrical switching will be determined on site to choose the best locations. Kitchen: 1. Remove and relocate wiring after drywall is removed. 2. Install 5 – 6” recessed can fixtures in kitchen ceiling. 3. Install 2 – 4” rough in boxes over the dinning table for ceiling mount fixtures. 4. Install rough in wiring for kitchen under mount lighting. 5. Install rough in wiring for outlets on kitchen walls for back splash electric. 6. Install a whip long enough to put a surface mount electrical box inside sink cabinet (This will be for the garbage disposal and dishwasher). 7. Install rough in wiring for the electric range. 8. Install rough in wiring for the microwave above the range. 9. Add electrical outlets per electrical code requirements. 10. Electrical switching will be determined on site to choose the best locations. Living room: 1.Remove the wiring and switching at the existing dinning area. (These are surfaced mounted 2. Install 1 floor outlet centered with the fireplace and 32 “ from the bedroom wall. 3. Install rough in wiring for 2 – 3” recessed cans in the soffit to the left of the fireplace. 4. Install rough in wiring for 3 – 3” recessed cans in the soffit to the right of the fireplace. 5. Install rough in wiring for 2 wall sconces 1 on fireplace wall and 1 on the opposite wall. 6. Install rough in wiring for an outlet on the front of the fireplace wall for a TV. 7. All switching and heights will be determined on site to choose the best locations. Guest Master bedroom and bathroom: 1. .Install 1- 4” rough in box in ceiling for a surface mount light fixture in the bedroom. 2. We will switch it next to entry door next to the existing switches. 3. Install rough in wiring for 4– 6” recessed cans in the ceiling of the bathroom. 4. Remove wall mounted light fixture over vanity. Upper Level : New Master Bedroom: 1. Install rough in an outlet on the east wall for a wall mount TV. New Master Bathroom: 1.Install rough in wiring for 3 – 6 “ recessed cans in the ceiling. 2. Remove wall mounted light fixture over vanity. Bedroom # 2: 1.Install rough in an outlet on the west wall for a wall mount TV. Bedroom # 2 Bathroom: 1. Install rough in wiring for 3 – 6' recessed cans in the ceiling. 2. Remove wall mounted light fixture over vanity. NOTE: Please quote the light fixtures in LED and standard bulbs. Dimmers and switches will be determined on site. 1" = 1'-0" 6 Typical rated wall at steel stud construction CEILING AT UPPER BEDROOMS AND SLOPED LIVING ROOM PROVIDES DESCRIPTION FOR LIGHTING FIXTURE GYP. BD BOX OUT 05/19/15