HomeMy WebLinkAboutB15-0151_S1_1433873820.pdfDEFERRED SUBMITTALS:
Portions of the structure have elements of proprietary design and fabrication, which shall
be submitted by the supplier for approval after award of contract.
These items shall conform to the load, capacity, size, geometry, connection, and support
criteria noted on the Structural Drawings.
Furnish deferred submittals for:
spray applied fireproofing showing conformance to required code compliance
Submittals will be reviewed by the Structural Engineer of Record for compliance with the
specified design requirements, stamped as "Reviewed," and forwarded to the local
building authority for review as required.
Final issue of the Building Permit may, at the approval authority's option, be contingent
on its approval of the deferred submittal documents.
Deferred submittal items shall not be installed until their design calculations and
drawings have been reviewed by the Architect, Structural Engineer, and/or local
building authority as required.
_____________________________________________________________________________________________
06/09/15