Loading...
HomeMy WebLinkAboutB15-0151_S1_1433873820.pdfDEFERRED SUBMITTALS: Portions of the structure have elements of proprietary design and fabrication, which shall be submitted by the supplier for approval after award of contract. These items shall conform to the load, capacity, size, geometry, connection, and support criteria noted on the Structural Drawings. Furnish deferred submittals for: spray applied fireproofing showing conformance to required code compliance Submittals will be reviewed by the Structural Engineer of Record for compliance with the specified design requirements, stamped as "Reviewed," and forwarded to the local building authority for review as required. Final issue of the Building Permit may, at the approval authority's option, be contingent on its approval of the deferred submittal documents. Deferred submittal items shall not be installed until their design calculations and drawings have been reviewed by the Architect, Structural Engineer, and/or local building authority as required. _____________________________________________________________________________________________ 06/09/15