HomeMy WebLinkAboutB15-0205_PV-E5_1436199540.pdf PROJECT
MUELLE' cijr le
GENERAL NOTES: DATE dli
6/3/2015 .
0,5
1 . Route and locate all conduit, combiner boxes, }
conductors, etc., as not to shade any solar modules 2
and to allow operation of the module racking .7/06/15
system.
2. All conductors are sized for voltage drop of less
than 2% for the total runback to the inverter. _RESERVED FOR TOWN OFVAILAPPROVAL_
STAMP(if applicable)
3. Array layout is shown for wiring purpose only.
Please coordinate array mounting location and
details with module racking drawings.
LI )
\ \ 1111ao oc o
w
>_, U
/ i i / / 1 i / /
(I) m O
\ / / \ \ \ / \ \ / / \ - � �
\ \ \ \ \ 12Til oz Lc =
n oLu- L,-1' 2Q)
\ X \ \ \ \ 7; — 0
1 (11) 0
L _ L
PROJECT ADDRESS:
conduit run(EXTERNALLY RAN)
1550 Matterhorn Circle
r Vail, CO 81631
Module String 1 ( 12 Modules) PREPARED BY:
Doni Nicoll
0 Module String r i n 2 ( 12 Modules SUNSENSE REPRESENTATIVE:
g ) CristianES Basso
e , Main System Components:6.24 kW SHEET NUMBER:
t ! Modules:Kyocera,KD260GX-LFB2(65.43"x 38.98')
4 String Layout (qty:24 modules x 260W=6.24 kW)
j Inverters:SolarEdge,SE6000A-US (qty:1) P\/ 5
w/Power Optimizers,P300 (qty:24)
SCALE: NTS Racking: S:Flex,Flush Mounted Solar Racking System
w/Zilla Double Stud XL Flashings