HomeMy WebLinkAboutinspector_summary_26984_11-15-2016-3322.pdf (0::44)
TOWN OF VAIL Inspection Summary
Inspection Result: Pass
Inspector: Stephen Scheich
Permit Type Inspection Type Address
Construction Electrical Final 223 BEAVER DAM RD (210107112004) (21010711200439)
Inspection Date: 11/15/2016
Permit#: B15-0066
TMK: 21010711200439
Comments:
1. Exterior grade will be raised to meet the minimum height requirements by final.
2. Inspector Signature
/V/1/ 4/(
3. Applicant Signature