Loading...
HomeMy WebLinkAboutB15-0225_HP Geotech Soils Report_1438966920.pdf el HEPWOR T H-PAWLAK GEOTECHNICAL i1I €-I.L,'1,1 August 6, 2015 BW-ANE, Inc. Attn: Steve Sandoval .I€111uenery.Lt1m Job No. 115 355A Subject: Observation of Excavation, Proposed Maintenance/Storage Building, Potato Patch Club, 950 Red Sandstone Road, Vail, Colorado Gentlemen: As requested, a representative of Hepworth-Pawlak Geotechnical, Inc. observed the excavation at the subject site on July 31, 2015 to evaluate the soils exposed for foundation support. The findings of our observations and recommendations for the foundation design are presented in this report. The services were performed in accordance with our agreement for professional engineering services to BW-ANA, Inc, dated July 30, 2015. The building is proposed to be supported on shallow spread footings with an allowable bearing pressure of 1,500 psf and slab-on-grade floor. At the time of our visit to the site, the foundation excavation had been cut in 2 levels from 3 to 61/2 feet below the adjacent ground surface and consisted of a perimeter trench cut. The front, south half was about 2 feet lower than the uphill, north half. The soils exposed in the bottom of the excavation consisted of relatively dense, silty clayey sandy gravel with cobbles. The natural soils were observed below about 3 to 6 feet of apparently onsite soil fill in the sides of the excavation. The results of a gradation analysis performed on a sample of the gravel (minus 3 inch fraction) obtained from the excavation bottom are presented on Figure 1. No free water was encountered in the excavation and the soils were slightly moist. Considering the conditions exposed in the excavation and the nature of the proposed construction, spread footings placed on the undisturbed natural gravel soil designed for an allowable soil bearing pressure of 1,500 psf should be adequate for support of the proposed building. The exposed soils could tend to compress when wetted under load and there could be some post-construction settlement of the foundation(and floor slab) if the bearing soils become wet. Footings should be a minimum width of 16 inches for continuous walls and 2 feet for columns. Loose disturbed soils in footing areas should be removed and the bearing level extended down to the undisturbed natural soils. Exterior footings should be provided with adequate soil cover above their bearing elevations for frost protection. Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining structures should also be designed to resist a lateral Parker 303-841-7119 ® Colorado Spring,s 719-633-5562 0 Silverthorne 970- 168-1989 BW-ANE, Inc. August 6, 2015 Page 2 earth pressure based on an equivalent fluid unit weight of at least 45 pcf for on-site soil as backfill. A perimeter foundation drain should be provided at the uphill side to prevent temporary buildup of hydrostatic pressure behind retaining walls and prevent wetting of the lower level. Structural fill placed within floor slab areas can consist of the on-site soils compacted to at least 95% of standard Proctor density at a moisture content near optimum. Backfill placed around the structure should be compacted and the surface graded to prevent ponding within at least 10 feet of the building. Landscape that requires regular heavy irrigation, such as sod, and sprinkler heads should not be located within 5 feet of the foundation. The recommendations submitted in this letter are based on our observation of the soils exposed within the foundation excavation and do not include subsurface exploration to evaluate the subsurface conditions within the loaded depth of foundation influence. This study is based on the assumption that soils beneath the footings have equal or better support than those exposed. The risk of foundation movement may be greater than indicated in this report because of possible variations in the subsurface conditions. In order to reveal the nature and extent of variations in the subsurface conditions below the excavation, drilling would be required. It is possible the data obtained by subsurface exploration could change the recommendations contained in this letter. Our services do not include determining the presence,prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. If you have any questions or need further assistance,please call our office. Sincerely, HEPWORTH—PAWLAK GEOTECHNICAL, INC. 40-<:i416.070. ti� �....*.LL• • A.• . • 1522.2 • Steven L. Pawlak, P.E.i ;. 3 ( ' / SLP/ksw aq Attachment: Figure 1 —Gras a': 'st Results Job No. 115 355A GE�Urtech