Loading...
HomeMy WebLinkAboutB15-0229_112097A (08-31-15) Helical Pier signed_1441159680.pdf 1.11 F) HeporthPiwhik Geotechnical,Inc. 5020 County Road 154 Geotech Cilenwo(xl Springs,Colorado 81601 Phone:970-945-798S HEPWORTH-PAWLAK GEOTECHNICAL Fax-970-945-8454 email: hpgeo@hpgeotech.com August 31, 20I5 DW Danzas Construction Attn: Dave Dantas P. O. Box 2322 Avon, Colorado 81620 dave@dwdantas.com Job No. 112 097A Subject: Observation of Helical Pier Installation, Proposed Deck Addition to Existing Duplex Residence, Lot 9, Vail Intermountain, 2801 Snowberry Drive, Vail, Colorado Dear Dave: As requested, a representative of Hepworth-Pawlak Geotechnical observed the helical pier installation at the subject site on August 19, 2015 to evaluate the piers for foundation support. The findings of our observations are presented in this report. The services were supplemental to our agreement for professional engineering services to DW Dantas Construction, dated June 16, 2015. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated June 11, 2012,Job No. 112 097A. We also observed the foundation for the subject eastern duplex residence unit at the site and submitted our findings in a report dated October 27, 2012, Job No. 112 097A. A new deck is planned attached to the north side of the residence. The deck has been designed to be supported on 5 helical piers with individual downward axial capacities of from 12 to 20 kips. The 5 design pier locations are shown on the attached Figure 1. Our observation of the helical pier installation are provided on the attached Report of Helical Pier Observation. The single helix piers were installed into the natural soils at depths from about 734 to 14'A feet below existing ground surface where refusal to torque or penetration was encountered. The approximate pier locations are shown on Figure 1. The piers should have adequate capacity to support the 12 to 20 kip design working loads. There could be some differential settlement with respect to the existing structure due to the variable pier loadings which should be considered in the design. Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 DW Dantas Construction August 31, 2015 Page 2 The recommendations submitted in this report are based on our observation of the helical pier installation, the previous subsoil information obtained at the site, and our experience in the area. The risk of foundation movement may be greater than indicated in this report because of possible variations in the subsurface conditions. In order to reveal the nature and extent of variations in the subsurface conditions at the deck addition area, drilling would be required. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH-PA K GEOTECHNICAL, INC. ott s e4. 414 • r 0 . r" David A. Young, P.E. -o • 4 . �'•-218 DAYlksw ��� .••' ���`.�` •` -ioNALot attachments Figure 1, Locat oirtrnelical Pier August 19, 2015 Report of Helical Pier Observation cc: BPSE- Brian Puppe (brim@'hp',c,net) Job No. 112 497A - - - — — - - Gtech APPROXIMATE SCALE 1 10' 4 3 2 I- -I r — -I r - -I HELICAL 5 I • I I • I I • I PIER [ . 1L _ J L _ J L - J L - J r - 7 1 I I L - J EXISTING EXISTING DUPLEX DECK 2801 SNOWBERRY ` 112 097A ~ Catch LOCATION OF HELICAL PIERS Figure 1 NEPWORTH-PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, Co 81601 Ge Simi teCh Phone:970-945-7988 Fax:970-945-8454 HEPWORTH-PAWLAK GEOTECHNICAL hooeoehpoeotech.com Report of Helical Pier Observation Client: DW Dantas Construction, LLC Job No.: 112 097A Date: 08-19-15 Attn: Dave Dantas Sheet No.: 1 of 1 P.O. Box 2322 Avon, Colorado 81620 Project: East Unit of Duplex Deck Addition, 2801 Snowberry Drive, Lot 9, Vail Intermountain, Vail, _ Colorado General Contractor: DW Dantas Helical Pier Contractor Great Divide Pier Manufacturer: Heli-Pile Rig Type: Hydraulic Head Hand Pier Pier Ultimate Pier Pier Shaft Helix Total Design Design Load Refusal Measured Number of Diameter Depth Load Load # Location Type p Capacity Criteria Torque (ft- Shear Pins (in.) (ft) (kips) Capacity (k�ps)tY lbs (kips) See 1'/2" 1 Figure 1 square 8ro 10 6 12 12 T -- 3 2 See 1'/2" 8" 91/2 10 20 20 P Figure 1 square -- 4 3 See 1'/2" 8" 141/4 10 20 20 T Figure 1 square -- 4 See 11/2" 4 Figure 1 square 8,, 7% 6 12 12 T -- 3 5 See 1'/2" 8„ 7Y2 6 12 12 T Figure 1 square -- 3 Preliminary Observations and 1 or Testing Results Verbally Reported To: Notes: P= Refusal to penetration of pier. T=Refusal by torque limit. All helices '/2-inch in thickness. Torque measurements are based on shear pins provided by Strategic Fence &Wall. Design Loads were provided by BTSE Structural Design. Pier Design Load Capacity is based on the shear pins and a safety factor of 2.0 H-P Geotech was requested to observe pier installation and did not provide pier or helix sizing. -Copies: DW Dantas Construction-Dave Dantas(daveOdwdantas.ccrn) BPSE-Brian Puppe(briars bpse.net) Lou Eller, SET David A. Young, P.E. Field Observer Reviewed By /ksw